问题:单选题Which is the MOST effective method for generating support for your project plan?()A Requiring stakeholders to sign-off on project plan componentsB Requesting input from all stakeholders during the planning processC Providing an open line of communication regarding the projectD Clearly illustrating how the project relates to the company’s objectives
查看答案
问题:单选题Within Information Technology projects, communications between the project manager and the project team members should take place:()A by written and oral communication.B via a weekly status report.C through the formal chain of command.D with approved template forms.
问题:多选题A customer wants to increase the performance of an existing server. They are running a very network intensive application and feel that increasing the bandwidth to the network will fix their problem. They are running two 24-port autosensing 10/100 hubs, tied together with a standard Ethernet crossover cable in port 24. The server is running IPX. After adding a second network card and plugging one card into each hub, they have not seen any performance improvement. Which two are likely reasons why implementing network adapter teaming has not improved performance?()AAdapter teaming is designed to work with switches.BAdapter teaming only functions with gigabit network cards.CAdapter teaming only provides fault tolerance, not additional bandwidth.DAdapter teaming only works with IPX when using switches and network cards with special features that support teaming.
问题:单选题Which of the following SCSI signaling systems uses one return line for every outgoing line, is less susceptible to interference, signal degradation, crosstalk, and allows a cable length of up to 25 meters?()ASE (Single Ended)BDE (Double Ended)CLVD (Low Voltage Differential)DHVD (High Voltage Differential)
问题:单选题Who is responsible for authorizing closure of the project?()A Project ManagerB StakeholderC CustomerD Executive Sponsor
问题:单选题Why does a project manager need an executive sponsor?()A To keep the project team focused on its workB To provide behind-the-scenes assistance with organizational commitment and supportC To sign-off on user requirementsD To negotiate contracts with outside vendors
问题:单选题The last deliverable at the Close Out meeting is:()A source code.B passwords.C lessons learned.D test results.
问题:单选题The project sponsor wants the project manager to develop and implement Quality Management techniques to ensure a smooth project transition to the deployment phase. What is an appropriate Quality Management technique to implement?()A Evaluate phase exit milestones using sufficiency criteriaB Flexible entry and exit criteria to minimize schedule delaysC Quality measures reported only to the project steering committeeD Many work teams with few members to maximize the number of deliverable hand-offs
问题:单选题After upgrading the SNMP (Simple Network Management Protocol) protocol, the ()can be looked up. It is a sequence of integers that uniquely identifies a path to a managed object.AMIB (Management Information Base)BOID (ObjectIDentifier)CregisterDcommunity name
问题:单选题What is a reason for reviewing the user requirements document with the client?()A To gain the client’s acceptance of the detailed designB To verify mutual understanding of project resourcesC To verify mutual understanding of the detailed project planD To verify mutual understanding of targeted product performanceE To verify mutual understanding of the tests that will be done after the product is completed
问题:单选题What is the MOST accurate way to determine a project’s duration before execution?()A The project manager performs all estimatesB Incorporate each individual worker’s estimatesC Acquire expert estimatesD There is no way to determine the duration
问题:单选题A technician needs to install the first SCSI controller in an application server. The SCSI card is factory-configured with a SCSI ID of 1. Which SCSI ID should the technician configure the card before installation?()A0B1C4D7
问题:单选题Which RAID standard combines data striping across drives with mirroring?()ARAID 0+1BRAID 1+5CRAID 3DHybrid RAID 5+
问题:单选题Which throughput does a 33 MHz, 33-bit bus have?()A132 MbpsB256 MbpsC264 MbpsD450 Mbps
问题:单选题After upgrading a server motherboard to the latest firmware revision, configuring LAN access in the SSU (System Setup Utility) fails. Which action should be taken FIRST to correct this problem?()Areplace the NICBinstall the latest SSU (System Setup Utility) versionCupgrade the firmware on the NICDassign the NIC a static IRQ in the SSU (System Setup Utility)
问题:单选题Which factor has the greatest impact on the estimated per unit labor cost for a project?()A Historical informationB Use of outside vendorsC Change control processesD Human resource skill level requirements
问题:单选题Team selection is not just a function of finding someone whos a technical or administrative expert. What will a project sponsor leading a high visibility project look for in a project manager?()A Developing key personnelB Leading technical specialistsC Interfacing with customers / sponsorsD Analyzing skills