Adapter teaming is designed to work with switches.
Adapter teaming only functions with gigabit network cards.
Adapter teaming only provides fault tolerance, not additional bandwidth.
Adapter teaming only works with IPX when using switches and network cards with special features that support teaming.
第1题:
● Serialization delay and (71) delay are the two components of network delay that are improved by increasing bandwidth. Serialization delay, i.e. the amount of time it takes to put the (72) on the wire, and queuing delay (depth of the queue) are improved by increasing the (73) from a 128Kbps circuit to a T1. However, three other components of delay, routing/switching delay, distance delay, and protocol delay are components that can not be positively affected by an (74) in bandwidth. If the circuits are not over-utilized, then increasing the bandwidth to improve the (75) of the application will only result in an increased bandwidth with no positive effects on performance.
第2题:
A. number of users, type of applications to be used
B. performance per user, network bandwidth available
C. number of users, storage capacity per user, network bandwidth available
D. number of users, number of applications per user, network bandwidth available
第3题:
You are the administrator of your company's network. The network is configured as shown in the exhibit.
You want to install Windows 2000 Professional on 10 non-PXE-compliant computers that are on the marketing segment of your network. You start one of the computers by using a RIS boot disk. However, you cannot connect to the RIS server.
You verify that the existing client computers on the network can connect to network servers, including the RIS server. The network router does not support BOOTP, so existing client computers use manually configured TCP/IP addresses. You want to enable the computers to connect to the RIS server.
What should you do?
A.Add a computer running DHCP Relay Agent to the marketing segment.
B.Add a computer running the network monitor driver to the marketing segment.
C.Move the Windows 2000 Server computer running WINS to the marketing segment.
D.Move the Windows 2000 Server computer running Active Directory to the marketing segment.
第4题:
A customer wants to purchase a Windows 2003 DataCenter Edition system to run an application. The application benefits the most by caching a vast amount of data in RAM so the user does not have to wait for disk I/O while editing. Processing is second in importance. If cost is not an issue, what machine will have the best performance?()
第5题:
Your customer wants to build a network for a financial trading floor that has a requirement formultiple high-value transactions, which are also vital to the customer. What are the two mostcritical requirements?() (Choose two.)
第6题:
A. Packet analysis
B. QoS
C. Traffic shaping
D. Fault tolerance
第7题:
第8题:
You are the administrator for your company's network. The network is configured as shown in the exhibit.
You want to install Windows 2000 Professional on 20 new PXE-compliant computers on the marketing segment of your network. The new computers do not have operating systems installed.
You create a RIS image. You load the image onto the RIS server. You then start the new computers.
You find that the new computers cannot connect to the RIS server. You verify that the new computers cannot connect to the RIS server. You verify that the existing client computers in the network can connect to the network servers, including the RIS server. You want to enable the new computers to connect to the RIS server.
What should you do?
A.Add a Windows 2000 Server computer running WINS to the network.
B.Add a Windows 2000 Server computer running DHCP to the network.
C.Add the domain Everyone group to the RIS OS image security settings.
D.Place the new computers on the same segment as the RIS server.
第9题:
A customer is running system management software on one of their Windows xSeries servers, and the software seems to slow down their database application over time. The customer is running IBM Director in their environment. Which IBM Director tool can they utilize to guarantee processor time for the different applications and optimize the server performance?()
第10题:
A customer is looking to build a virtual desktop infrastructure on an IBM platform. What metrics will be most useful in determining the storage platform recommendation?()