问题:单选题A customer has a POWER6 520 system with 6 partitions. They plan to upgrade their system and need to determine the current hardware configuration of the partitions before making any upgrade decisions. What is needed to read the exported system plan and design the new system?()A e-ConfigB System Planning Tool (SPT)C IBM Workload Estimator (WLE)D IBM Performance Monitor (PM)
查看答案
问题:单选题A customer requires their application to have high availability within a data center, and also the ability to recover at a data center located 600km away in the event of an outage. Which system software solution component supports the customer requirement?()A PowerHA SystemMirror Basic EditionB PowerHA SystemMirror Express EditionC PowerHA SystemMirror Standard EditionD PowerHA SystemMirror Enterprise Edition
问题:单选题What is the primary purpose of the Technical and Delivery Assessment (TDA)?()A Identify, assess, and mitigate technical risks.B Verify pricing and gather components for special bid submission.C Verify the proposed solution will fit within the customer's budget.D Review competitive offerings, system performance and delivery schedules.
问题:单选题Which of the following uses compression/decompression to increase the memory available for client workloads?()A PowerVMB VMControlC Active Memory SharingD Active Memory Expansion
问题:单选题When a customer attempts to manage virtual machines, virtual images and system pools with the VMControl Express Edition, all operations fail except for managing virtual machines. What is recommended to resolve this situation?()A Upgrade to VMControl Standard EditionB Upgrade to VMControl Enterprise EditionC Upgrade to latest version of VMControl Express EditionD Download the latest fixes for VMControl Express Edition
问题:单选题Which operating system can directly host managed storage for IBM i, AIX, Linux, VMware and Windows on a Power Systems server?()A AIXB IBM iC LinuxD VIO Server
问题:单选题A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750. Which action allows the most efficient use of existing equipment?()A Populate the Power 750 first then add a GX+ adapter to support PCI-X andPCIe I/O drawer loops.B Populate the Power 750 first then add 2 GX+ adapters to support PCI-X andPCIe I/O drawer loops.C Populate the Power 750 first then add a GX++ adapter to support PCI-X andPCIe I/O drawer loops.D Populate the Power 750 first then add GX+ and GX++ adapters to support PCI-X andPCIe I/O drawer loops.
问题:单选题While using virtualization to share SAN adapters on a server, how does Node Port ID Virtualization (NPIV) differ from Virtual SCSI (vSCSI) related to the use of multipathing software?()A NPIV andvSCSI both require multipathing in VIO Server only.B NPIV requiresmultipathing software on client LPARs, vSCSI requires multipathing software on VIO Server.C NPIV requiresmultipathing software on VIO Server, vSCSI requires multipathing software on client LPARs.D NPIV requiresmultipathing and MPIO software on VIO Server LPARs, vSCSI requires multipathing software on VIO Server and MPIO on client LPARs.
问题:单选题A customer would like to configure an uncapped LPAR so that it can use 2 to 8 cores depending on the workload characteristics. With SMT4 enabled, what is the least amount of processing resources which can be configured for the LPAR?()A 8 desired processing units and 8 desired virtual processorsB 2 desired processing units and 8 desired virtual processorsC 8 desired processing units and 32 desired virtual processorsD 2 desired processing units and 32 desired virtual processors
问题:单选题Which of the following configuration is valid for expansion drawers on a Power 750 with 2 processor board sinstalled?()A 3 PCI-e I/O drawers and 1 PCI-X I/O drawerB 4 PCI-e I/O drawers and 4 RIO-2 I/O drawersC 2 PCI-e I/O drawers and 4 PCI-x I/O drawersD 4 PCI-e I/O drawers and 2 PCI-X I/O drawers
问题:单选题A customer is implementing a POWER Blade solution which requires the VIO Server to be mirrored on internal disk drives. Which Blade supports the requirement?()A JS21B JS23C PS700D PS701
问题:单选题A new customer wants to install a Power 750 in a warehouse location that has no local staff to support it. They are concerned about hardware support and would like to have the system notify IBM service if there is an issue.Which actions will address the customer concern?()A Enable automatic problem reporting from smitB Use IVM to enable console mirroring to IBM Remote Support.C Use the HMC to enable reporting through Electronic Service Agent.D Enable Automatic Problem Reporting in ASMI using he embedded modem on the FSP.
问题:单选题A system is being planned with three production partitions, one each for an IBM i, AIX standard edition, and Power Linux applications. One fibre-channel attached TS3100 tape library will be shared between the partitions for backup. Which solution provides tape library sharing with minimum operator intervention?()A Configure VIO Server Express Edition to control the tape library through one fibre channel card.Assign the library to the production partitions when needed.B Configure the IBM i partition to own the tape library.Use IBM i virtualization to host a virtual tape library connection to the AIX and Linux partition.Assign the library to the production partitions when needed.C Configure a fibre channel card for each partition, and a configure fibre switch.Connect the partitions and tape library to the switch.Zone the switch so all partitions can enable the tape when needed and disable the tape when finished.D Configure AIX to control the tape library through one fibre channel adapter.Use AIX virtualization to host a virtual tape library connection to the IBM i and Linux partitions.Assign the library to the production partitions when needed.
问题:单选题A customer has an LPAR with 4 dedicated cores on a POWER7 server with SMT4 enabled. How many logical processors are presented to an application running on this LPAR?()A 4B 8C 16D 32
问题:单选题A Power 720 customer using IVM wants to implement dual VIO servers, but is unable to create the second server. What is the most likely reason for this?()A An HMC is required for dual VIO servers.B Dual VIO servers require a split backplane.C A dual VIO enablement code must be entered from the ASMI interface.D The second VIO server must be created using the IVM command line interface.
问题:单选题Which of the following solutions provides maximum core density per rack?()A Power 730B PS700 BladesC PS702 BladesD PS703 Blades
问题:单选题A customer has a 32-core Power 770 with 4 AIX partitions and 2 IBM i partitions. They want to improve network availability and allow for concurrent maintenance. What will support the customer requirement at least cost?()A Build the logical partition infrastructure based on 6 or more VLANs.B Build the logical partition infrastructure based on two or more IVEs.C Build the logical partition infrastructure based on Partition Mobility.D Build the logical partition infrastructure based on redundant VIO Servers.
问题:单选题What describes the difference between NPIV and vSCSI in the way fibre-channel attached disk and tape are presented when VIO Server is used?()A NPIV presents Virtual HBA addresses and vendor specific information for disk and tape devices.vSCSI presents generic disk and tape device interfaces.B NPIV presents generic disk and tape device interfaces on virtual HBA addresses.vSCSI presents HBA addresses as SCSI with vendor specific information for disk and tape devices.C NPIV presents HBA addresses and vendor specific device information directly to the client partition.vSCSI presents vendor specific disk information and generic tape device interfaces through VIO server.D NPIV presents virtual HBA addresses with generic device information for SCSI based disk and tape devices.vSCSI presents vendor specific information for disk and tape device devices attached via SCSI hardware interfaces.
问题:单选题A customer requires two 12X loops on their new POWER7 system. What is the smallest system that will support two loops?()A Power 710B Power 720C Power 730D Power 740