问题:单选题A prospective client needs to combine Ethernet, FCOE, and iSCSI. They have not been able to practically combine these in the past. Which of the following IBM products meets this need?()A BladeCenter Open Fabric Manager (BOFM) B SAN Volume Controller (SVC) C Virtual Fabric for BladeCenter D Network Provisioning on Demand in the AMM
查看答案
问题:单选题A medical customer has an installed HS21 blade with no local disk. They are attempting to set up boot from SAN using a Windows 2003 CD. Which sequence is correct for this procedure? ()A Install Windows from the CD using the QLogic driver provided on the CD, configure the LUN and zone for the target server, and then configure the blade UEFI to boot from SAN.B Configure the LUN and zone for the target server, install Windows from the CD and press F6 when prompted to supply the driver, and then configure the QLogic adapter BIOS to boot from SAN. C Configure the LUN and zone for the target server, configure the QLogic adapter BIOS to boot from SAN, install Windows from the CD, and then press F6 when prompted to supply the driver. D Configure the blade UEFI to boot from SAN, configure the LUN and zone for the target server, and then install Windows from the CD using the QLogic driver provided on the CD
问题:单选题A customer is consolidating their ten rack mount Windows servers into a VMware environment with four servers. The existing servers all have internal disk. The total amount of useable capacity is 5TB which is expected to increase to 10TB over the life of this asset. The customer will want to use the advanced features of VMware like VMotion.The customer is concerned about cost. Which of the following meets the customers needs? ()A DS3500 with SAS Host Connection B DS3500 with iSCSI Host Connection C DS3500 with FC Host Connection D DS5020
问题:单选题A banking customer has two Ethernet Switch Modules installed in an IBM BCE chassis. The modules were configured identically. The Ethernet module in bay 1 was accidentally reset to factory defaults. Which solution returns the module to the customer-specific configuration? ()A Restore the configuration from NVRAM using the Switch Module Web interface B Back up the configuration of the Ethernet module in bay 1 and restore it to the Ethernet module in bay 2 using the AMM C Swap the modules, which will automatically resynch the settings stored in the Advanced Management Module D Back up the configuration from Ethernet module in bay 2 and restore it to the module in Bay 1 using the switch CLI or Web interface
问题:单选题How many BladeCenter HT chassis will fit in a standard 19" 42U rack?()A 2. B 3 C 4 D 6
问题:单选题A Customer has a proprietary server deployment solution that uses a combination of disk imaging and application pushing technology. They need to get a working Windows 2003 image for their new servers as soon as possible for deployment with their provisioning system. Which of the following methods can achieve this? ()A Install Windows 2003 using the F6 supply Mass Storage Controller option B Replace Customers deployment solution with Tivoli Provisioning Manager for OS Deployment Director Edition C Use ServerGuide to install Windows 2003 D Deploy Customers existing image and use UXSPi to update IBM specific drivers
问题:单选题A customer asks which bays they could install Multi-Switch Interconnect Module (MSIM). Which of the following is the source of this information?()A CDAT B IBM Systems Director C Tivoli Provisioning Manager (TPM) D BladeCenter Interoperability guide
问题:单选题A prospect is considering a BladeCenter H chassis with the Multi-Switch Interconnect Modules. The number of Ethernet ports is important to them. What is the maximum number of Ethernet ports an HS22 blade server can support if the blade does not have any expansion blades attached?()A 8 B 6 C 4 D 2
问题:单选题A customer wants to install an IBM BladeCenter infrastructure but is concerned about the cost of the full fabric internal fibre switches. Consequently, the customer is considering an N_Port ID Virtualization (NPIV) capable switch.Which of the following should be mentioned to the customer regarding the NPIV switch?()A You can not use an NPIV switch in the same IBM BladeCenter chassis as a Cisco Intelligent Ethernet Switch B Using blade servers with the NPIV switch will require more fibre ports on the external fibre switch C Storage devices like Fibre Channel Tape and Disk cannot be attached to the NPIV Switch but must connect to a core fabric switchD The NPIV switch will count against the number of domains in a fabric
问题:单选题A retail customer installs a BladeCenter into an existing 10/100 Ethernet network. Due to cost considerations, the customer uses Copper Pass-thru Modules. After installing this solution, the customer finds that they have no network connectivity. Which of the following at is causing the problem?()A Copper Pass-thru Modules only support 1000Mb line speeds. B Spanning Tree has been enabled on the Copper Pass-thru Module. C The customer does not have the latest firmware loaded on the Copper Pass-thru Module. D The customer is using LS21 Blades
问题:单选题A mechanical contractor is deploying a custom application written to take advantage of multithreading features and run in a Windows environment. The customer has read about iDataPlex, BladeCenter, and System x servers. The customer wants to know which processor family will run the application most efficiently. Which of the following questions will provide the required information?()A Can the application use Hot Swap Processor, Memory, and PCI-X technology? B Will the application benefit from larger disk cache and swap space? C Will the application run faster with Microsoft OLTP technology? D What is the application's maximum processor scaling capability?
问题:单选题A banking customer has a firewall between their AMM and the remote console which is used to configure the chassis and blades. Due to security concerns, port 80 (http) is being blocked, denying any http access to the AMM. Which of the following would facilitate remote communication with the AMM using a GUI interface?()A port 443 - SSL connection B port 8080 ?http C port 22 - SSH CLI D port 427 - SLP connection
问题:单选题A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700. They would like to upgrade and plan for 40 TB capacity. The customer needs to move to a more scalable storage system to include all servers.Which of the following would be most appropriate to ask first?()A What are the plans for Disaster Recovery? B What are the plans for data migration? C Would iSCSI meet your needs? D How much space is available in the current storage systems?
问题:单选题Which bays do the Multi-Switch Interconnect Module populate? ()A 3 and 4 B 3, 4, 5, and 6 C 7 and 9 D 7, 8, 9, and 10
问题:单选题Which of the following steps does a customer use to upgrade the firmware on the AMM to the latest level?()A Open a Web browser and log on to the IMM; in the navigation frame, click IMM Firmware Update under IMM Control; click Browse; select the .exe file; click the Upgrade/Update button B TFTP to the AMM; from the Main Menu, select Update; browse to the downloaded .exe file C Telnet to AMM; from the Main Menu, select Update; browse to the downloaded .pkt file D Open a Web browser and log on to the AMM; in the navigation frame, click AMM Firmware Update under AMM Control; click Browse; select the .pkt file; click the Upgrade/Update button
问题:单选题retail company plans to consolidate 180 existing dual processor Xeon servers, all running a web server application on Windows Server 2003. They are planning consolidating to a single x3950 X5 running vSphere.Which of the following should be discussed with this customer? ()A Is the web content static or dynamic information B Consider two servers for redundancy and failover C What is the average CPU utilization of the existing web servers D Will the servers need a SCSI or Fibre Channel storage solution
问题:单选题What is the correct procedure to update the UEFI on HX5 with MAX5 blades without using the AMM?()A Insert the ServerGuide CD/DVD, boot the HX5 blade and follow the prompts B Boot the blade from the HX5 Bootable Media Creator (BoMC) and follow the prompts C Press F1 when the HX5 system is booting, select Update UEFI, insert the CD/DVD and select OKD Mount the IMM virtual disk
问题:单选题An eX5 client is concerned about the cost-per-GB of the proposed SAS disk-based solution, and suggests using SATA disk technology in order to reduce costs for their 24x7 mission-critical Microsoft SQL Server application. Which of the following addresses the customer issues?()A SAS drives support automatic rebuild upon failure, SATA must be rebuilt manually B SAS drives support Fibre Channel attachment to eX5 servers, SATA does not C SATA drives require different, more expensive cables, and require more floor space compared with SAS D SATA storage is slower, has lower mean time between failure, and designed for a lower duty cycle compared with SAS