单选题An insurance customer installs two BladeCenter chassis in a rack with glass doors. After a short time, the blowers in both BladeCenters increase to full speed, and then one fails. Apart from replacing the broken blower, which additional action is requi

题目
单选题
An insurance customer installs two BladeCenter chassis in a rack with glass doors. After a short time, the blowers in both BladeCenters increase to full speed, and then one fails. Apart from replacing the broken blower, which additional action is required for a long term fix? ()
A

Add Rear Door Heat eXchanger 

B

Add fans to the top of the racks 

C

Increase circulation from Data Center raised floor 

D

Change to perforated doors

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

A banking customer plans to implement a BladeCenter H chassis. They plan for seven HS22 blades, six HX5 blades with MAX5, one 1U external Fibre Channel switch, and two 3U Fibre Channel storage devices with fourteen 146GB drives. Which is the minimum amount of rack space required to implement the solution of the following?()

  • A、32U
  • B、21U
  • C、25U
  • D、22U

正确答案:C

第2题:

A customer needs to add three JS22 blade servers. The customer currently has three HS21 Blade servers and one LS41 4-socket Blade Server. Based upon this information,  what additional items does the customer need to purchase? ()

  • A、An IBM BladeCenter H chassis for the JS22 Blade servers
  • B、A concurrent KVM daughter card
  • C、A pair of IBM BladeCenter Power Supplies
  • D、A second Management Module

正确答案:C

第3题:

A customer has ordered a rack, a p650, two p630s, and two p615s.  During a conversation on installation planning, the pSeries technical specialist recognizes that the customer expects the rack to arrive as one unit.  However, the specialist knows that the p650 will be racked, but the other systems will arrive separately.  In fact, the other systems are CSU (Customer Set Up). Why should the specialist immediately inform the customer that additional racking is the customer’s responsibility?()

  • A、Because additional systems would require more power receptacles
  • B、Because the customer may need to do additional facilities planning
  • C、Because the customer needs additional funding to cover the services
  • D、Because postponing the eventual discussion will likely lead to customer dissatisfaction

正确答案:D

第4题:

A banking customer has the following requirements for an IBM BladeCenter solution with high speed fibre channel: (1)four 4-socket Microsoft SQL servers with two hot swap SAS drives  (2)two physical Microsoft Active Directory Servers  (3)twenty-two physical Citrix servers  (4)three physical Web servers (5)one physical vCenter server   (6)eight vSphere hosts  Which configuration minimally satisfies these requirements?()

  • A、Three IBMBladeCenter S chassis, three Brocade Fibre modules, six Ethernet modules
  • B、Three IBMBladeCenter E chassis, three Brocade Fibre modules, six Ethernet modules
  • C、Four IBMBladeCenter H chassis, four QLogic Fibre Channel modules, eight Ethernet modules
  • D、Three IBMBladeCenter H chassis, three QLogic Fibre Channel modules, six Ethernet modules

正确答案:D

第5题:

A retail customer is looking at ways to reduce power requirements. They are considering deploying two hundred IBM HS22 blades running Red Hat Linux in the IBM BladeCenter E chassis. The customer has already chosen Intel L5640 CPUs to reduce power. Which on-board storage option allows the customer to reduce power consumption of each blade?()

  • A、One 50 GB SATA 1.8 inch SSD
  • B、Two 73GB 10K SAS HDD SFF
  • C、Two 31 GB SATA 2.5 inch SSD
  • D、Two 50GB SATA 1.8 inch SSD

正确答案:C

第6题:

A customer is interested in reducing energy consumption and infrastructure consolidation for space. The customer needs a maximum of 14 servers in 7U rack.  Which IBM BladeCenter Chassis should be recommended? ()

  • A、BladeCenter E
  • B、BladeCenter H
  • C、BladeCenter T
  • D、BladeCenter HT

正确答案:A

第7题:

An insurance customer installs two BladeCenter chassis in a rack with glass doors. After a short time, the blowers in both BladeCenters increase to full speed, and then one fails. Apart from replacing the broken blower, which additional action is required for a long term fix of the following?()

  • A、Add Rear Door HeateXchanger
  • B、Add fans to the top of the racks
  • C、Increase circulation from Data Center raised floor
  • D、Change to perforated doors

正确答案:D

第8题:

A medical customer has a rack with four BladeCenter H chassis that have been operating normally for several months. After installing a new rack of servers in the data center, the system administrator notices the blowers in the BladeCenters have increased their speed. Which of the following caused this problem? ()

  • A、The room temperature has reached 23C (73.4F). 
  • B、A Blade within the chassis has been shut down. 
  • C、The ambient temperature in the data center has increased 
  • D、One of the additional System X servers in the BladeCenter rack has failed.

正确答案:C

第9题:

A banking customer plans to implement a BladeCenter H chassis. They plan for seven HS22 blades, six HX5 blades with MAX5, one 1U external Fibre Channel switch, and two 3U Fibre Channel storage devices with fourteen 146GB drives. Which of the following is the minimum amount of rack space required to implement the solution?()

  • A、32U 
  • B、25U 
  • C、22U 
  • D、21U

正确答案:B

第10题:

A customer has the following equipment installed in their data center:  (1)an IBM BladeCenter H chassis (2)two power supplies  (3)six HS22V blades (4)three Nortel 1/10 GB ESMs The retail customer purchased a new HX5 with MAX5.  Which of the following must be added to install the HX5 with MAX5?()

  • A、Two additional power supplies
  • B、Fibre Channel (FC) switches and SAN storage
  • C、A Nortel 1/10 GB ESM
  • D、SSD for the HX5

正确答案:A