The administrator will need to perform an rg_move operation
The administrator will need to un-manage and re-manage the resource group
The administrator will need to execute the new start script from the command line
The new start script will be executed as part of the DARE operation to synchronize the cluster
第1题:
A cluster administrator decides ti implement application monitoring in order to monitor both a web application and its supporting database. The plan is to use a single resource group prod_rg and to configure one monitor method for the web app and one monitor method for the database. Which of the following statements best describes the need for custom resource monitor?()
第2题:
Company.com has a six-node concurrent resource group with an application that is accessed by a web connection to the cluster nodes. How is the workload moved to another cluster node during a node failure?()
第3题:
A client has a temporary deployment of a new static application that needs to run for a short period of time and is not going to change.How can this deployment be achieved with a minimum of effort and time?()
A.Run a system WPAR and deploy the application.
B.Create a new LPAR and deploy the application.
C.Create an application WPAR to deploy the application.
D.Create an LPAR hosted by a VIO server and deploy the application.
第4题:
To enhance the availability of an application running under HACMP, a decision was made to use The application monitoring facility. The application consists of several components and can take several minutes to initialize. The components use socket communication and can be initialized in any order as long as it is a serial order. The customer’s concern is that if the application stop and start scripts are used during application monitoring recovery,it may take an extraordinary length of time to reset all of the application components. What can be done to ensure the best recover time?()
第5题:
An administrator has integrated a new application into an existing resource group. An application server withstart and stop scripts was defined and added to the resource group definition. The cluster was thensynchronized. How can the new application be started with minimal downtime?()
第6题:
An administrator is configuring an application monitor. Upon encountering an unrecoverable error the administrator does not want the resource group to failover. How can the application monitor be configured toachieve this?()
第7题:
An administrator uses C-SPOC to change the user password for all nodes that belong to a Resource group. The administrator must perform this operation on a node that is:()
第8题:
During a planning meeting, Company.com indicates that they intend to make a relational Database highly available. The application has a pre-requisite that a kernel extension be loaded from /etc/inittab. How would this be managed in an HACMP environment?()
第9题:
During initial cluster planning session, a requirement is mandated that application monitoring will Be used to monitor the production database and three application servers. Since all the application servers rely on the database being active, only one resource group has been planned to manage the starting/stopping of the cluster resources. How ill the initial design impact the use of application monitoring?()
第10题:
A cluster administrator has decided to add a cluster verification to the weekly maintenance scripts That are run from corn. When a cluster verification is performed,which of the following will require a custom verification method?()