To enhance the availability of an application running under 

题目
单选题
To enhance the availability of an application running under HACMP, a decision was made to use  The application monitoring facility. The application consists of several components and can take several minutes to initialize. The components use socket communication and can be initialized in any order as long as it is a serial order. The customer’s concern is that if the application stop and start scripts are used during application monitoring recovery,it may take an extraordinary length of time to reset all of the application components.  What can be done to ensure the best recover time?()
A

 Use a process monitor that restarts the named processes in the original start order.

B

 Use the defined application start and stop scripts to control the application if there is a failure.

C

 Use multiple application monitors for this resource group to enable the monitoring of the specific components of the resource group.

D

 Use application cleanup and restart scripts designed to determine the state of the various components of the application and start only the parts required.

参考答案和解析
正确答案: D
解析: 暂无解析
如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

● TCP/IP (71) layer protocols provide services to the application (72) running on a computer. The application layer does not define the application itself, but rather it defines (73) that applications need—like the ability to transfer a file in the case of HTTP. In short, the application layer provides an (74) between software running on a computer and the network itself. The TCP/IP application layer includes a relatively large number of protocols, with HTTP being only one of those. The TCP/IP (75) layer consists of two main protocol options—the Transmission Control Protocol (TCP) and the User Datagram Protocol (UDP).


正确答案:A,B,A,C,D

第2题:

Which three of the following are valid CRS deployment scenarios? ()

  • A、High Availability CRS Engines running on hardware from different server classes 
  • B、High Availability CRS Engines running on similar hardware from the same server class but from different vendors 
  • C、High Availability CRS Engines and database and a simplex Recording Server 
  • D、High Availability CRS Engines and four simplex VoIP Monitoring Servers 
  • E、CCM co-resident deployment on an MCS 7815

正确答案:B,D,E

第3题:

TCP/IP(71)layer protocols provide services to the application(72)running on a computer. The application layer does not define the application itself, but rather it defines(73)that applications need--like the ability to transfer a file in the case of HTTP. In short, the application layer provides an(74)between software running on a computer and the network itself. The TCP/IP application layer includes a relatively large number of protocols, with HTTP being only one of those. The TCP/IP(75)layer consists of two main protocol options--the Transmission Control Protocol(TCP) and the User Datagram Protocol(UDP).

A.application

B.transport

C.link

D.network


正确答案:A

第4题:

To enhance the availability of an application running under HACMP, a decision was made to use  The application monitoring facility. The application consists of several components and can take several minutes to initialize. The components use socket communication and can be initialized in any order as long as it is a serial order. The customer’s concern is that if the application stop and start scripts are used during application monitoring recovery,it may take an extraordinary length of time to reset all of the application components.  What can be done to ensure the best recover time?()   

  • A、 Use a process monitor that restarts the named processes in the original start order.
  • B、 Use the defined application start and stop scripts to control the application if there is a failure.
  • C、 Use multiple application monitors for this resource group to enable the monitoring of the specific components of the resource group.
  • D、 Use application cleanup and restart scripts designed to determine the state of the various components of the application and start only the parts required.

正确答案:D

第5题:

Which layer in the OSI reference model is responsible for determining the availability of the receiving program and checking to see if enough resources exist for that communication?()

  • A、transport
  • B、network
  • C、presentation
  • D、session
  • E、application

正确答案:E

第6题:

Which layer in the OSI reference model is responsible for determining the availability of the receiving program and checking to see if enough resources exist for that communication?()

A.transport

B.network

C.presentation

D.session

E.application


参考答案:E

第7题:

The CTI Port Group is configured under which Subsystem?()

  • A、ICD  
  • B、CMT  
  • C、JTAPI  
  • D、Application

正确答案:C

第8题:

Which two requirements would lead towards a high availability solution?()

A.When uptime is critical

B.When data must be refactored

C.When application concurrency is static

D.When data loss is unacceptable

E.When application is a single point of failure


参考答案:A, D

第9题:

A customer had been given a proposal for a p5-570 6-way 32GB system running in Full Partition mode.  After review, the customer asked that the configuration be modified to enhance the reliability and availability of the solution.  However, the customer does not want to pay for HACMP or additional machines.  What change would be most likely to improve the reliability of the solution?()

  • A、Add CUoD memory.
  • B、Provide CUoD processors.
  • C、Provide redundant disks on separate SCSI buses.
  • D、Add redundant power supplies in the p5-570 CEC (Central Electronics Complex).

正确答案:C

第10题:

During an internal IT organization planning session, it is decided that a new cluster node would  Enhance the performance of a distributed corporate application. Planning details have been assigned to the administrator. System outages are limited to one weekend per month; therefore, availability will be a key issue in the planning process.  How much cluster downtime will need to be allocated for adding a new node?()  

  • A、 None,everything can be done with the cluster active.
  • B、 Minimal downtime will be required to import the volume groups.
  • C、 Several hours are required for testing before final synchronization.
  • D、 Minimal downtime will be required to connect and test the serial network.

正确答案:A

更多相关问题