A customer wants to install an IBM BladeCenter infrastructure but is concerned about the cost of the full fabric internal fibre switches. Consequently, the customer is considering an N_Port ID Virtualization (NPIV) capable switch.Which of the following sh

题目

A customer wants to install an IBM BladeCenter infrastructure but is concerned about the cost of the full fabric internal fibre switches. Consequently, the customer is considering an N_Port ID Virtualization (NPIV) capable switch.Which of the following should be mentioned to the customer regarding the NPIV switch?()

  • A、You can not use an NPIV switch in the same IBM BladeCenter chassis as a Cisco Intelligent Ethernet Switch 
  • B、Using blade servers with the NPIV switch will require more fibre ports on the external fibre switch 
  • C、Storage devices like Fibre Channel Tape and Disk cannot be attached to the NPIV Switch but must connect to a core fabric switch
  • D、The NPIV switch will count against the number of domains in a fabric
如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

A banking customer orders three IBM BladeCenter E chassis and thirty-four HS22 blades. The customer wants to fully populate the chassis with blades where possible. Which of the following is the minimum number of power cables required to provide redundancy?()

  • A、6
  • B、8
  • C、10
  • D、12

正确答案:C

第2题:

A customer wants to install an IBM BladeCenter infrastructure but is concerned about the cost of the full fabric internal fibre switches. Consequently, the customer is considering an N_Port ID Virtualization (NPIV) capable switch. Which of the following should be mentioned to the customer regarding the NPIV switch?()

  • A、Youcan not use an NPIV switch in the same IBM BladeCenter chassis as a Cisco Intelligent Ethernet Switch
  • B、Using blade servers with the NPIV switch will require morefibre ports on the external fibre switch
  • C、Storage devices likeFibre Channel Tape and Disk cannot be attached to the NPIV Switch but must connect to a core fabric switch.
  • D、The NPIV switch will count against the number of domains in a fabric

正确答案:C

第3题:

A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()

A. operator training

B. cache size of the two clusters

C. fibre bandwidth capability between the sites

D. number of stacked tape drives attached to each cluster


参考答案:C

第4题:

A customer wants to expand their current storage environment, but has floor space for only two machine frames or two racks. Their environment consists of IBM SAN Volume Controllers and IBM DS4000 systems. The DS4000 systems are at end of lease. The customer wants the maximum number of disks possible in two frames. Which of the following solutions is best for this customer?()

  • A、add one SVC
  • B、install one DS8700
  • C、install one DS8800
  • D、install one XIV system

正确答案:C

第5题:

A customer is interested in reducing energy consumption and infrastructure consolidation for space. The customer needs a maximum of 14 servers in 7U rack.  Which IBM BladeCenter Chassis should be recommended? ()

  • A、BladeCenter E
  • B、BladeCenter H
  • C、BladeCenter T
  • D、BladeCenter HT

正确答案:A

第6题:

A customer wants to boot from SAN with their IBM BladeCenter infrastructure.  What is required for the customer to be able to perform this? ()

  • A、4GB Modular Flash Drive for each Blade Server and Dual 15.8GB 2.5 Solid State Drive for each Blade Server 
  • B、Cisco Intelligent Gb Ethernet Switch Module and IBM BladeCenter Copper Pass-thru Module 
  • C、Fibre Channel Expansion Card for each Blade Server and Fibre Channel SAN Switch Module 
  • D、Cisco Intelligent Gb Ethernet Switch Module and Dual 15.8GB 2.5 Solid State Drive for each Blade Server

正确答案:C

第7题:

A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()

  • A、operator training
  • B、cache size of the two clusters
  • C、fibre bandwidth capability between the sites
  • D、number of stacked tape drives attached to each cluster

正确答案:C

第8题:

A manufacturing customer has an IBM BladeCenter H chassis with four, HX5 with MAX5 4-socket blades installed. Each blade has the optional Fibre Channel Expansion card. The customer wants redundancy and is going to install the following configuration:  (1)two Brocade 20-Port SAN Switch Modules  (2)two Nortel Networks 1/10 GB Uplink ESM  (3)a redundant AMM  What is the minimum number of power supplies needed for this configuration to have full redundancy?()

  • A、4
  • B、3
  • C、2
  • D、8

正确答案:A

第9题:

A customer is considering an Intel processor-based blade solution from a competitor. The customer is willing to share only the information that the competitor offers 96 Xeon processors per rack.  Which of the following IBM BladeCenter E benefits should the Sales Specialist emphasize first?()

  • A、Redundant Blowers
  • B、Availability of AMD and Intel Processors
  • C、Processor density
  • D、Advanced Management Module

正确答案:C

第10题:

A customer wants to deploy VMWare ESX on four-way Intel systems.  They are considering IBM and Dell.Which of the following is an advantage IBM has over the competition?()

  • A、IBM provides optional Remote Technical Support for hardware, NOS, and VMWare.
  • B、The IBM xSeries EXA chipset has extensions to provide better efficiency for the VMFS file system.
  • C、IBM servers can address larger LUNs on SAN storage than Dell.
  • D、IBM provided VMWare with the majority of their internal drivers for ESX.

正确答案:A