While installing a new IBM System Storage DS5100 into a customer’s data center, it is discoveredthat the customer does not have enough available Fibre Channel ports on their switches. Which ofthe following should have been used to avoid this situation?()A

题目

While installing a new IBM System Storage DS5100 into a customer’s data center, it is discoveredthat the customer does not have enough available Fibre Channel ports on their switches. Which ofthe following should have been used to avoid this situation?()

  • A、IBM DS5000 Cabling Tool
  • B、IBM e-Configurator Tool
  • C、IBM Pre-Installation TDA Checklist
  • D、IBM Standalone Solutions Configuration Tool
如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

An IBM XIV system with nine modules and 2 TB disks is being proposed to a customer who needs to increase disk capacity in the data center. The customer is concerned about data growth andcost after the initial purchase. Which of the following factors of the solution should be stressed to the customer to address data growth?()

A. the XIV system can be scaled by the addition of modules

B. XIV offers thin provisioning for all available host operating systems

C. reduced operating costs will pay for another XIV system in less than two years

D. the management GUI allows the administrator tovirtualize the entire storage system quickly


参考答案:A

第2题:

A customer wants to collect performance data from a newly installed IBM System Storage DS8300 to determine if the system meets expected benchmarks using their application test data.  Which tool best gathers the performance data()

  • A、IBM DS Storage Manager
  • B、IBM Tivoli Storage Resource Manager
  • C、IBM TotalStorage Productivity Center for Disk
  • D、IBM TotalStorage Productivity Center for Data

正确答案:C

第3题:

A customer has an existing high availability SAN environment with CLARiiON, which has been stable for 16 months. They have recently experienced several outages with their current storage systems. They need to purchase additional storage and have asked about tier 1 storage. They are concerned with connecting their existing storage and servers without trouble.Which resource should be consulted while developing the solution options?()

A. Disk Magic

B. TPC for Data

C. CLARiiON Procedure Generator

D. System Storage Interoperability Center


参考答案:D

第4题:

A customer wants to install an IBM BladeCenter infrastructure but is concerned about the cost of the full fabric internal fibre switches. Consequently, the customer is considering an N_Port ID Virtualization (NPIV) capable switch. Which of the following should be mentioned to the customer regarding the NPIV switch?()

  • A、Youcan not use an NPIV switch in the same IBM BladeCenter chassis as a Cisco Intelligent Ethernet Switch
  • B、Using blade servers with the NPIV switch will require morefibre ports on the external fibre switch
  • C、Storage devices likeFibre Channel Tape and Disk cannot be attached to the NPIV Switch but must connect to a core fabric switch.
  • D、The NPIV switch will count against the number of domains in a fabric

正确答案:C

第5题:

A medical customer has a rack with four BladeCenter H chassis that have been operating normally for several months. After installing a new rack of servers in the data center, the system administrator notices the blowers in the BladeCenters have increased their speed. Which of the following caused this problem? ()

  • A、The room temperature has reached 23C (73.4F). 
  • B、A Blade within the chassis has been shut down. 
  • C、The ambient temperature in the data center has increased 
  • D、One of the additional System X servers in the BladeCenter rack has failed.

正确答案:C

第6题:

A customer is looking to add disk storage. They are not satisfied with their existing EMCCLARiiON CX4-240. Instead of adding storage to the CX4, the customer wants to add a newsystem and migrate the LUNs from the EMC to the new storage system over a 6 month period,and not have any system disruption during this time. They are also interested in consolidating diskstorage management. Given these specifications, which of the following solutions would satisfythis customer’s requirements?()

  • A、DS5100 and SAN Volume Controller
  • B、DS5100 and Tivoli Storage Manager
  • C、2 DS5100 systems with Remote Mirroring
  • D、DS5100 and Tivoli Storage Productivity Center for Data

正确答案:A

第7题:

The customer is considering an IBM System Storage DS8000. Which of the following indicates a requirement for the Business Partner to perform a TDA?()

  • A、capacity above 500 TB
  • B、first in customer location
  • C、a new model has been released
  • D、sold without implementation service

正确答案:B

第8题:

A customer has installed an IBM System Storage DS8700 with 20 TB of storage, 32 GB cache, and 16 Fibre Channel ports. The customer is beginning to experience throughput performance issues since they have added new workloads. The customer asks the storage specialist for guidance.Which of the following actions should be recommended as a first step?()

A. install the Performance Accelerator feature

B. review the DS Storage Manager Major Event Log (MEL)

C. add an expansion frame with additionalFibre Channel ports

D. review the latest TPC for Disk study to identify the source of the performance issue


参考答案:D

第9题:

A customer is interested in purchasing a new IBM System Storage TS3500 Tape Library. Which ofthe following documents should be used first to guide the Business Partner to verify theenvironment?()

  • A、TS3500 Redbook
  • B、TS3500 Operators Manual
  • C、Solution Assurance Product Review (SAPR) Guide
  • D、TS3500 Product Installation and Planning Guide

正确答案:D

第10题:

An IBM XIV system with nine modules and 2 TB disks is being proposed to a customer who needs to increase disk capacity in the data center. The customer is concerned about data growth andcost after the initial purchase. Which of the following factors of the solution should be stressed to the customer to address data growth?()

  • A、the XIV system can be scaled by the addition of modules
  • B、XIV offers thin provisioning for all available host operating systems
  • C、reduced operating costs will pay for another XIV system in less than two years
  • D、the management GUI allows the administrator tovirtualize the entire storage system quickly

正确答案:A