问题:单选题Company.com wants to build two Dynamic Logical Partitions (DLPAR) on a p5-520. They have a requirement for communication between the two DLPARs. Which feature of virtualization will satisfy this requirement?()A VLANB Virtual EthernetC Virtual I/O Server SupportD Capped and Uncapped Partitions
查看答案
问题:单选题A technical specialist has a requirement to implement a 4-way POWER5 server with a small Web server partition and a high performance database server partition. The Web server provides a client front-end to the database server. The most important concerns are speed of communication between the Web server and the database and I/O speed of the database. Which of the following virtualization features would be most appropriate?()A Virtual SCSIB Virtual EthernetC Virtual I/O ServerD Micro-Partitioning
问题:单选题A hosting company recently purchased an IBM p5-570 to use in their data center. The company intends to use the server to run several different client workloads. Which of the following features of the IBM p5 servers addresses the need for the isolation of workloads?()A Workload ManagerB Support for AIX 5.3C Logical partitioningD 64-bit or 32-bit kernel support
问题:单选题Company.com has ordered an 8-way p5-570 and plans to deploy four AIX 5L v5.3 LPARs. The pre-installation system design has all eight processors being placed in the shared processor pool, and four Micro-Partitions being assigned resources from the pool. Prior to the implementation of the system, the customer informs the technical specialist that one of the applications is only supported on AIX 5L 5.2. Which of the following changes to the system design should the technical specialist make to accommodate this change?()A Create all the partitions as AIX 5.2, each having two dedicated processors.B Purchase a system with two additional processors that can be assigned to the AIX 5.2 Partition.C Specify an AIX 5.2 partition using dedicated processors, reducing the number of processors in the shared pool.D Use the virtual I/O server to manage the disks and network connections removing the need for different levels of device drivers.
问题:单选题A user has an application server LPAR with a physical Ethernet adapter. They want to have a database LPAR also connected to the application LPAR via virtual Ethernet. Their security policies require a firewall between the application LPAR and database LPAR. Which of the following virtual Ethernet configurations satisfies the customer’s requirements?()A The application server,firewall,and database server on the same VLANB The application server and firewall on one VLAN,and the database server on a second VLANC The application server on one VLAN,and the database server and firewall on a second VLAND The application server and firewall on one VLAN,and the firewall and database server on a second VLAN
问题:单选题Company.com would like to have the processor resources on their system efficiently shared between logical partitions, but does not require management of memory or I/O resources. Which of the following would accomplish this requirement?()A HMC command lineB Uncapped processorsC Partition Load ManagerD Enterprise Workload Manager
问题:单选题Which of the following commands is used to restore the VIO server from a backup image?()A ddB tarC restoreD installios
问题:单选题Company.com wants to put two Micro-Partitions on a p5-570 and attach to a SAN. What is the best LPAR configuration to maximize SAN availability using four Host Bus Adapters (HBAs)?()A Two HBAs assigned to each redundant VIOS which provides VSCSI access to LUNsB Two HBAs assigned to each LPAR with each LPAR owning HBAs on the same PCI bussesC Two HBAs assigned to each LPAR with each LPAR owning HBAs on separate PCI bussesD One HBA assigned to each LPAR and two HBAs assigned to a VIOS providing VSCSI access to LUNs
问题:单选题When creating a Virtual Ethernet adapter, which of the following steps is done FIRST?()A Generate a unique MAC address.B Run cfgmgr to create device special files.C Create a virtual device with smitty vlan.D Add a virtual Ethernet adapter to the partition profile.
问题:单选题Which of the following allows the user to have two separate Ethernet networks share the same network adapter?()A VLAN tagsB EtherChannelC Virtual EthernetD Shared Ethernet Adapter
问题:单选题The Information Technology (IT) department wants to consolidate two 4-way p5-550 servers onto an 8-way p5-570. However, the departments using the p5-550 servers are concerned about quality of service after consolidation. Which per-partition processor allocation would provide comparable performance while still allowing the POWER5 hypervisor to optimize the processing workload of the server?()A 4.0 processing units, 4 virtual processors, capped modeB 4.0 processing units, 4 virtual processors, uncapped modeC 4.0 processing units, 8 virtual processors, capped modeD 4.0 processing units, 8 virtual processors, uncapped mode
问题:单选题After creating a virtual Ethernet adapter in slot #3 of logical partition #5, the user needs to configure the adapter in AIX. Which of the following location codes matches this virtual Ethernet adapter?()A U9111.520.1000000-V5-C3-T1B U9111.520.1000000-V3-C5-T1C U9111.520.1000000-V5-C1-T3D U9111.520.1000000-V1-C3-T5
问题:单选题After rebuilding the list of virtual devices used by the VIO server using the "cfgdev" command, which command would be run to verify that a newly configured virtual SCSI adapter is available?()A lsdev -virtualB lsdev -Cs scsiC lscfg -vlD lsdev -adapter
问题:单选题Company.com would like to configure a virtual Ethernet between an AIX V5.3 LPAR and an AIX V5.2 LPAR. Which of the following options is necessary to complete this task?()A Remove the physical Ethernet adapters from the LPARsB Activate Advanced POWER VirtualizationC Update microcode for the virtual adaptersD Upgrade AIX V5.2 LPAR to AIX V5.3
问题:单选题When doing capacity planning for the Virtual I/O Server,what is the most important consideration?()A The I/O workload needs of the client LPARsB The processing requirements of the client LPARsC The memory requirements of the client LPARsD The virtual Ethernet requirements between client LPARs
问题:单选题ompany.com has recently received a new p5-570 in the data center and wants to connect it to an existing HMC environment where each of the existing POWER5 servers has been assigned a static IP address. Which of the following actions should the technical specialist perform to set the service processor network address for a static IP?()A Configure the IP address through the first client partition.B Configure the IP address through the ASMI menus.C Configure the POWER5 service processor for DHCP from the HMC DHCP server.D Configure the HMC to use the default IP address on the service processor when acquiring the managed server.
问题:单选题A technical specialist defined a virtual Ethernet ent2 on the VIO server that has a physical adapter, ent0. Which of the following commands should be used to configure the Shared Ethernet Adapter?()A mkvdev -sea ent2 -vadapter ent0 -default ent0 -defaultid 1B mkdev -virtual ent0 -adapter ent3 -default en2 -defaultid 1C mkvdev -sea ent0 -vadapter ent2 -default ent2 -defaultid 1D mkvdev ent0 -sea -vadapter ent2 -default ent2 -defaultid 1
问题:单选题Company.com has recently received a new p5-570 in the data center and wants to Micro-Partition the server. The customer already has an existing HMC connected to a p690. Which of the following actions should the technical specialist take?()A Order a POWER5 HMCB Connect to the existing HMCC Install an 8-port asynchronous card in the managed server to connect to the existing HMCD Install an additional network card to the existing HMC and connect to the POWER5 service processor