Software quality assurance is now an emerging sub - discipline of(36). As Buckly and oston

题目

Software quality assurance is now an emerging sub - discipline of(36). As Buckly and oston point out,(37) software quality assurance is likely to lead to an ultimate(38) of software costs. However, the major hurdle in the path of software management in this area is the lack of usable software(39). The development of accepted and generally applicable standards should be one of the principal goals of(40) in software engineering.

A.software engineering

B.software design

C.coding

D.testing

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

The quality objectives are approved in the conceptual stage of the project by the:

A . Project Engineer

B . Project Manager

C . Functional Manager

D . Quality Assurance Manager

E . Project Owner


正确答案:E

第2题:

The auditing function that provides feedback about the quality of output is referred to as:

A . quality control.

B . quality planning.

C . quality assurance.

D . quality improvement

E . All of the above.


正确答案:C

第3题:

The key ingredient to a successful quality management program are _____.

A . management's quality philosophy, operational quality assurance and operational quality control.

B . quality evaluation methods and functional quality integrators.

C . technical quality administration, the technical quality specifications, and the quality process review.

D . quality evaluation methods, quality progress reviews and the technical quality specifications.

E . All of the above.


正确答案:A

第4题:

● (73)is the application of planned, systematic quality activities to ensure that the project will employ all processes needed to meet requirements.

(73)

A. Quality assurance (QA)

B. Quality planning

C. Quality control (QC)

D. Quality costs


正确答案:A

第5题:

121 The quality objectives are approved in the conceptual stage of the project by the:

A. Project Engineer

B. Project Manager

C. Functional Manager

D. Quality Assurance Manager

E. Project Owner


正确答案:E

第6题:

Of the following, who has the ultimate responsibility for meeting project quality objectives?

A . Project Engineer

B . Project Manager

C . Functional Manager

D . Quality Assurance Manager

E . Project Owner


正确答案:B

第7题:

100 The auditing function that provides feedback about the quality of output is referred to as:

A. quality control.

B. quality planning.

C. quality assurance.

D. quality improvement

E. All of the above


正确答案:C

第8题:

Non-conformance penalties are a form. of _____.

A . quality incentive

B . risk sharing

C . contract negotiations

D . quality assurance programs

E . None of the above.


正确答案:C

第9题:

87 The key ingredient to a successful quality management program are _____.

A. management's quality philosophy, operational quality assurance and operational quality control. B. quality evaluation methods and functional quality integrators.

C. technical quality administration, the technical quality specifications, and the quality process review. D. quality evaluation methods, quality progress reviews and the technical quality specifications.

E. All of the above


正确答案:A

第10题:

●To ensure the project team provides the functionality the customerexpects in a new piece of software, the project manager ask the customer forsign-off on the design criteria. These documents are(75).

(75) A. technical specifications

B. performance specifications

C. product descriptions

D. quality assurance


正确答案:A

更多相关问题