单选题An application is upgraded and it has been determined that the AccessAgent no longer properly responds to the application. It is understood that for a certain amount of time both the current version and the upgraded version of the application will be u

题目
单选题
An application is upgraded and it has been determined that the AccessAgent no longer properly responds to the application. It is understood that for a certain amount of time both the current version and the upgraded version of the application will be used by the end-users. The executables for both versions are the same. What should be the next step?()
A

Open AccessStudio and change the existing AccessProfile to use only the new signatures for Windows, control IDs, or HTML elements.

B

Open AccessStudio and create a new AccessProfile for the upgraded version and overwrite the existing AccessProfile on the IMS Server.

C

Open AccessStudio and edit the existing AccessProfile by using new triggers/actions associated with the new signatures for Windows, control IDs, or HTML elements.

D

Open AccessStudio and create a new AccessProfile for the upgraded version and upload it to the IMS Server so that two separate AccessProfiles may be used by the AccessAgent.

参考答案和解析
正确答案: B
解析: 暂无解析
如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

You create a Microsoft ASP.NET application by using the Microsoft .NET Framework version 3.5. When you access the application in a Web browser, you receive the following error message: "Service Unavailable".  You need to access the application successfully.  What should you do?()

  • A、Start Microsoft IIS 6.0. 
  • B、Start the Application pool. 
  • C、Set the .NET Framework version. 
  • D、Add the Web.config file for the application.

正确答案:B

第2题:

The Company switches have all been upgraded to use VTP version 2. What are two benefits  provided in VTP Version 2 that are not available in VTP Version 1?()

  • A、VTP version 2 supports Token Ring VLANs
  • B、VTP version 2 allows VLAN consistency checks
  • C、VTP version 2 allows active redundant links when used with spanning tree
  • D、VTP version 2 reduces the amount of configuration necessary
  • E、VTP version 2 saves VLAN configuration memory

正确答案:A,B

第3题:

Before installing a new, upgraded version of the IOS, what should be checked on the router, and which command should be used to gather this information?()

A. the amount of available ROM

B. the amount of available flash and RAM memory

C. the version of the bootstrap software present on the router

D. show version

E. show processes

F. show running-config


参考答案:B, D

第4题:

A customer has a pSeries that needs to be upgraded from AIX Version 5.1 to AIX Version 5.2. The customer wants to retain /etc/passwd. Which of the following installation types should be used?()

  • A、Preservation Install
  • B、Retention Install
  • C、Overwrite Install
  • D、Migration Install

正确答案:D

第5题:

An application is upgraded and it has been determined that the AccessAgent no longer properly responds to the application. It is understood that for a certain amount of time both the current version and the upgraded version of the application will be used by the end-users. The executables for both versions are the same. What should be the next step?()

  • A、Open AccessStudio and change the existing AccessProfile to use only the new signatures for Windows, control IDs, or HTML elements.
  • B、Open AccessStudio and create a new AccessProfile for the upgraded version and overwrite the existing AccessProfile on the IMS Server.
  • C、Open AccessStudio and edit the existing AccessProfile by using new triggers/actions associated with the new signatures for Windows, control IDs, or HTML elements.
  • D、Open AccessStudio and create a new AccessProfile for the upgraded version and upload it to the IMS Server so that two separate AccessProfiles may be used by the AccessAgent.

正确答案:C

第6题:

Before installing a new, upgraded version of the IOS, what should be checked on the router, and which command should be used to gather this information?()

  • A、the amount of available ROM
  • B、the amount of available flash and RAM memory
  • C、the version of the bootstrap software present on the router
  • D、show version
  • E、show processes
  • F、show running-config

正确答案:B,D

第7题:

An existing cluster has an application node and database node. Changes in the application  require both nodes to have access to the other’s data all of the time.  Which facility managed by HACMP can be implemented with the least amount of impact?()   

  • A、 NFS
  • B、 AFS
  • C、 DFS
  • D、 GPFS

正确答案:A

第8题:

An application that needs to use a shared library has a deployment descriptor that only specifies the Specification-Version and Extension-Name of the shared library. When the application is deployed, which shared library will be used?()

  • A、The application will go into an ADMIN state and fail to deploy because the Implementation- Version is required.
  • B、The application will be deployed but the classes in the shared library will not be available.
  • C、If you are using the WebLogic Admin Console, you will be prompted for the version you want to  use; otherwise, the application will fail to deploy.
  • D、If there are multiple versions of the shared library deployed, WebLogic will use the one with the highest Implementation-Version.
  • E、If there are multiple versions of the shared library deployed, WebLogic will use the one that was  deployed most recently.

正确答案:D

第9题:

An application vendor wants to choose a fault tolerant platform for their new application.  The application benefits from multiple processors and has been tested on Red Hat Advanced Server 3.  To determine the memory requirements for the application, which of the following is the best procedure?()

  • A、The application should be tested and baselines should be measured with simulated user loads.
  • B、The application should be tested with the minimum amount of memory then increase the memory in increments until an acceptable response is achieved.
  • C、The application should be tested with differing amounts of memory and the fastest response time is reached it should be used as the acceptable configuration.
  • D、The application should be tested with the maximum amount of memory then decrease the memory in increments until an acceptable price/performance ratio is reached.

正确答案:A

第10题:

Companycom is moving their application to a p5 590 and at the same time moving to a new version of the application. The customer knows only about the resource requirements of the old version. Which of the following is the best method to migrate their application to POWER5?()

  • A、Add CPU and memory COD so they have room to grow if required
  • B、Make the server configuration twice as large as the current requirement
  • C、Configure the server for the current capacity requirements
  • D、Make the server configuration a little larger than the current capacity requirements

正确答案:A

更多相关问题