问题:单选题A Technical and Delivery Assessment (TDA) is a structured technical inspection of a completed solution design. After the inspection is complete, what deliverable can the customer expect?()A Verification of the expected performance of the new solution.B A document used by IBM manufacturing to build and ship the system solution.C An IBM Quality Assurance Certificate which is supplied to the customer with the system.D A list of actions that are recommended to reduce risk and create a successful implementation.
查看答案
问题:单选题A customer has a POWER6 520 system with 6 partitions. They plan to upgrade their system and need to determine the current hardware configuration of the partitions before making any upgrade decisions. What is needed to read the exported system plan and design the new system?()A e-ConfigB System Planning Tool (SPT)C IBM Workload Estimator (WLE)D IBM Performance Monitor (PM)
问题:单选题A customer is deploying a new database on a PS701 Blade in a BladeCenter H, and requires redundant network and SAN adapters. Which configuration supports the customer requirement?()A Configure 2 CFFh combination fibre channel / gigabit Ethernet adaptersB Configure 1 CFFh 2-port fibre channel adapter and 1 CIOv 2-port gigabit Ethernet adapterC Configure 1 CIOv 2-port fibre channel adapter and 1 CFFh combination fibre channel / gigabit Ethernet adapterD Configure 1 CIOv 2-port gigabit Ethernet adapter and 1 CFFh combination fibre channel / gigabit Ethernet adapter
问题:单选题A customer requires two 12X loops on their new POWER7 system. What is the smallest system that will support two loops?()A Power 710B Power 720C Power 730D Power 740
问题:单选题A customer has a 32-core Power 770 with 4 AIX partitions and 2 IBM i partitions. They want to improve network availability and allow for concurrent maintenance. What will support the customer requirement at least cost?()A Build the logical partition infrastructure based on 6 or more VLANs.B Build the logical partition infrastructure based on two or more IVEs.C Build the logical partition infrastructure based on Partition Mobility.D Build the logical partition infrastructure based on redundant VIO Servers.
问题:单选题A customer requires their application to have high availability within a data center, and also the ability to recover at a data center located 600km away in the event of an outage. Which system software solution component supports the customer requirement?()A PowerHA SystemMirror Basic EditionB PowerHA SystemMirror Express EditionC PowerHA SystemMirror Standard EditionD PowerHA SystemMirror Enterprise Edition
问题:单选题Which operating system can directly host managed storage for IBM i, AIX, Linux, VMware and Windows on a Power Systems server?()A AIXB IBM iC LinuxD VIO Server
问题:单选题Which of the following items in a single enclosure Power 770 improves Reliability, Availability, and Serviceability?()A Redundant system clocksB Redundant service processorsC eDRAM chips have redundant L3 cacheD Main memory DIMMs contain a redundant DRAM chip
问题:单选题What describes the difference between NPIV and vSCSI in the way fibre-channel attached disk and tape are presented when VIO Server is used?()A NPIV presents Virtual HBA addresses and vendor specific information for disk and tape devices.vSCSI presents generic disk and tape device interfaces.B NPIV presents generic disk and tape device interfaces on virtual HBA addresses.vSCSI presents HBA addresses as SCSI with vendor specific information for disk and tape devices.C NPIV presents HBA addresses and vendor specific device information directly to the client partition.vSCSI presents vendor specific disk information and generic tape device interfaces through VIO server.D NPIV presents virtual HBA addresses with generic device information for SCSI based disk and tape devices.vSCSI presents vendor specific information for disk and tape device devices attached via SCSI hardware interfaces.
问题:单选题A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750. Which action allows the most efficient use of existing equipment?()A Populate the Power 750 first then add a GX+ adapter to support PCI-X andPCIe I/O drawer loops.B Populate the Power 750 first then add 2 GX+ adapters to support PCI-X andPCIe I/O drawer loops.C Populate the Power 750 first then add a GX++ adapter to support PCI-X andPCIe I/O drawer loops.D Populate the Power 750 first then add GX+ and GX++ adapters to support PCI-X andPCIe I/O drawer loops.
问题:单选题While using virtualization to share SAN adapters on a server, how does Node Port ID Virtualization (NPIV) differ from Virtual SCSI (vSCSI) related to the use of multipathing software?()A NPIV andvSCSI both require multipathing in VIO Server only.B NPIV requiresmultipathing software on client LPARs, vSCSI requires multipathing software on VIO Server.C NPIV requiresmultipathing software on VIO Server, vSCSI requires multipathing software on client LPARs.D NPIV requiresmultipathing and MPIO software on VIO Server LPARs, vSCSI requires multipathing software on VIO Server and MPIO on client LPARs.
问题:单选题An end user is deploying Blade servers to replace obsolete rack mounted servers. In addition to AIX Web server and database workloads, they also have Windows workloads. Which Blade is designed for Windows workloads?()A HS22B JS43C QS21D PS701
问题:单选题Which of the following uses compression/decompression to increase the memory available for client workloads?()A PowerVMB VMControlC Active Memory SharingD Active Memory Expansion
问题:单选题When a customer attempts to manage virtual machines, virtual images and system pools with the VMControl Express Edition, all operations fail except for managing virtual machines. What is recommended to resolve this situation?()A Upgrade to VMControl Standard EditionB Upgrade to VMControl Enterprise EditionC Upgrade to latest version of VMControl Express EditionD Download the latest fixes for VMControl Express Edition
问题:单选题What is the primary purpose of the Technical and Delivery Assessment (TDA)?()A Identify, assess, and mitigate technical risks.B Verify pricing and gather components for special bid submission.C Verify the proposed solution will fit within the customer's budget.D Review competitive offerings, system performance and delivery schedules.
问题:单选题A customer is buying 10 new Power 720 servers and will integrate them into their existing data center which also has two Power 595s and five Power 750s, taking the total number of systems to 17. All currently installed systems are managed by a single HMC.All the machines will have dual VIO Servers for redundancy, and 10 client LPARs. How can they manage the new machines for the least cost?()A Purchase a second HMC and use this to manage the new servers.B Connect all of the new servers to the existing private HMC network.C Configure a second private network on their existing HMC for the new servers.D Connect 9 of the new servers to the existing HMC and use Integrated Virtualization Manager on the 10th.