A customer requires two 12X loops on their new POWER7 system

题目
单选题
A customer requires two 12X loops on their new POWER7 system. What is the smallest system that will support two loops?()
A

Power 710

B

Power 720

C

Power 730

D

Power 740

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

A customer needs a new 4-way p630 with three partitions to support three AIX 5.2 applications.  Each partition requires two of the following:  OS boot drives, fiber adapters, and gigabit Ethernet adapters.  The customer has an HMC with an available serial port.  In addition to the model 6C4, which of the following is required to meet the customer’s requirements?()

  • A、One 7311-D20 drawer
  • B、Two 7311-D20 drawers
  • C、Two 7311-D10 drawers
  • D、One 7311-D10 drawers

正确答案:B

第2题:

A customer has an existing DS5300 system attached to two Brocade switches with eight Windowsservers. The customer wants to add their System i p750 server to this SAN. From the followingchoices what is the simplest and least expensive solution for this customer?()

  • A、add twofibre HBAs to the System i and connect to the SAN
  • B、add twofibre HBAs to the System i and connect to the Windows Servers
  • C、add twofibre HBAs to the System i and connect to the System i using VIOS
  • D、add two SAS HBAs to the Systemi array and connect directly to the DS5300

正确答案:A

第3题:

A customer needs to create a number of LPARs on a new POWER6 server with some LPARs requiring a dedicated network and other LPARs utilizing Virtual Ethernet via a VIO server.Which limitation must be considered when planning the system configuration?()

A.A VIO server requires a dedicated LHEA port.

B.There is a limit of 32 LPARs per virtual LAN.

C.Two VIO servers will be required. A single VIO server can only provide virtual storage or virtual Ethernet.

D.Two VIO servers will be required. One to provide virtual networking and another to provide dedicated networking.


参考答案:A

第4题:

A customer has a new Power 720 with PowerVM Standard Edition.  They plan to migrate their single-partition POWER5 550 to the new Power 720.   How can the customer migrate from the POWER5 550 to the Power 720 with minimal effort and down time?()

  • A、Perform Live Partition Mobility between the two systems.
  • B、Move the boot disks from the old system to the new system.
  • C、Use Tivoli Storage Manager to back up the POWER5 550 and restore on the Power 720.
  • D、Upgrade AIX to the latest level on the POWER5 550 and clone using the mksysb command.

正确答案:D

第5题:

A customer is consolidating seven IBM i partitions onto a POWER7 system, using VIO Server to virtualize resources.Which of the following PowerVM editions is appropriate for this customer?()

  • A、IBM i Edition
  • B、Express Edition
  • C、Standard Edition
  • D、Enterprise Edition

正确答案:C

第6题:

A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()

  • A、operator training
  • B、cache size of the two clusters
  • C、fibre bandwidth capability between the sites
  • D、number of stacked tape drives attached to each cluster

正确答案:C

第7题:

A customer needs a new Microsoft Windows 2003 Server.  They are running an application that requires substantial memory.  They would like a rack mountable system, which will support four Xeon processors with 2MB of L3 cache.  Which of the following is the minimum configuration to satisfy the customer’s requirements?()

  • A、x445 with four Xeon MP processors and 8GB of memory
  • B、x445 with four Xeon MP processors and 16GB of memory in a single SMP module
  • C、x445 with four Xeon DP processors and 16GB of memory in a single SMP module
  • D、x445 with two SMP modules each containing two Xeon DP processors and 8GB of memory

正确答案:A

第8题:

Which two features prevent routing loops between the OSPF sites of a customer when the sites aremultihomed or a backdoor link is used between the sites? ()

  • A、sham link
  • B、down bit
  • C、virtual link
  • D、Site of Origin
  • E、domain tag

正确答案:B,E

第9题:

A customer requires management capabilities for installed pSeries systems via a Microsoft Windows system. Which of the following should be considered?()

  • A、TSM
  • B、PSSP
  • C、WebSM
  • D、LoadLeveler

正确答案:C

第10题:

A customer requires two 12X loops on their new POWER7 system. What is the smallest system that will support two loops?()

  • A、Power 710
  • B、Power 720
  • C、Power 730
  • D、Power 740

正确答案:D