单选题Companycom recently ordered a p5 570 and an HMC. Prior to delivery, two additional p5 570 servers were added to the order. Upon installation, the system administrator noticed that they do not have a method to connect the p5 570 servers to the HMC. Whic

题目
单选题
Companycom recently ordered a p5 570 and an HMC. Prior to delivery, two additional p5 570 servers were added to the order. Upon installation, the system administrator noticed that they do not have a method to connect the p5 570 servers to the HMC. Which of the following will allow them to connect all servers to the HMC?()
A

An 8-port adapter to the HMC

B

A hub for the private network

C

An additional Ethernet card to the HMC

D

An additional Ethernet card for each partition

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

Companycom is buying an application solution that bases its software licensing on the number of CPUs per machine. They will be running two instances of this application and will require 8 CPUs each. A second application is priced based on CPUs per LPAR as well as the class of machine. That application will require 8 CPUs. What is the best hardware to propose to keep the software cost low?()

  • A、A 24 way p5 595 with 3 LPARs
  • B、A 24 way p5 595 with 2 LPARs
  • C、One p5 570s 16 way and one p5 570 8 way
  • D、One p5 595 12 way active and 12 way inactive, and one p5 570 8 way

正确答案:C

第2题:

One of the key decision making factors in a very competitive opportunity will be cost. Companycom needs an aggregate rPerf rating of 120. What is the best solution?()

  • A、Two p5 570 16 way 1.9 MHz machines
  • B、One p5 590 32 way 1.65 MHz machines
  • C、One p5 595 32 way 1.65 MHz machines
  • D、Two p5 570 16 way 1.65 MHz machines

正确答案:D

第3题:

An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC.Which infrastructure is required for the new HMC?()

A.An additional switch for the new HMC

B.Asynchronous adapters on the new HMC

C.The two 570 servers are directly connected to the new HMC

D.One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC


参考答案:A

第4题:

A client has an existing p5 570 that is directly connected to a HMC. The customer will be purchasing another p5 570. Which of the following solutions would be appropriate to provide HMC connectivity to the second p5 570?()

  • A、Implement a proxy server to provide multiple sources to one destination 
  • B、Purchase an additional Ethernet adapter for each p5 570 to provide connectivity between the two 
  • C、Purchase a network hub or switch so both p5 570s can connect to the single HMC 
  • D、Purchase an additional HMC since multiple HMC are required when more than one POWER5 Enterprise class server is used Purchase an additional HMC since multiple HMC? are required when more than one POWER5 Enterprise class server is used

正确答案:C

第5题:

Companycom has several CR3 HMCs managing their p690 servers. They have purchased a new p5 570 and would like to manage the new system with an existing HMC. What is required to support this environment?()

  • A、Free up one HMC and update the software for use with the p5 570
  • B、Connect the new p5 570 server to an existing HMC and manage the p690s and p5 570 from that HMC
  • C、Order a new HMC to support the new p5 570 server since the CR3 HMC is not supported for a p5 570
  • D、Backup the HMC to DVD-RAM and select HMC migrate to move all the profile data to the new HMC software

正确答案:A

第6题:

An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()

  • A、An additional switch for the new HMC
  • B、Asynchronous adapters on the new HMC
  • C、The two 570 servers are directly connected to the new HMC
  • D、One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC

正确答案:A

第7题:

Companycom recently ordered a p5 570 and an HMC. Prior to delivery, two additional p5 570 servers were added to the order. Upon installation, the system administrator noticed that they do not have a method to connect the p5 570 servers to the HMC. Which of the following will allow them to connect all servers to the HMC?()

  • A、An 8-port adapter to the HMC
  • B、A hub for the private network
  • C、An additional Ethernet card to the HMC
  • D、An additional Ethernet card for each partition

正确答案:B

第8题:

An administrator has an existing HMC and POWER6 570 connected to a network switch.  The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()

  • A、An additional switch for the new HMc  
  • B、Asynchronous adapters on the new HMc
  • C、The two 570 servers are directly connected to the new HMc  
  • D、One 570 is directly connected to the new HMC and the other is directly connected to the existing HMc

正确答案:A

第9题:

A system administrator is installing a p5 590 server with an HMC. After pulling the websm client down, it is not possible to connect to the HMC. The HMC can be pinged from the client. Which of the following settings should be verified next?()

  • A、The routes on the HMC
  • B、The firewall setting of the LAN adapter
  • C、The name resolution protocol on the p5 590 server
  • D、The subnet mask settings on the Ethernet adapters

正确答案:B

第10题:

A customer currently has five partitioned POWER4 systems and is adding new systems.  When the pSeries technical specialist introduces the first p5 system with CoD into this environment, how should the HMC be handled?()

  • A、Order a new HMC to support the p5 system.
  • B、Attach the new p5 system to the existing HMC.
  • C、Upgrade the existing HMC to accommodate both the POWER4 and p5 systems.
  • D、Do nothing.  This system does not require an HMC.

正确答案:A

更多相关问题