问题:单选题AIX 5L v5.3 provides initial support for which of the following new features?()A Workload Manager,POWER5 supportB 64-bit kernel support,JFS2 supportC Dynamic LPAR,Capacity upgrade on demandD Micro-Partitioning,Virtual I/O Server
查看答案
问题:单选题A customer is very concerned about maintaining a competitive advantage through the use of state-of-the-art technology. Assuming all solutions meet the customer’s technical requirements, which solution should the IBM team propose to maximize customer satisfaction?()A p690 with Dynamic LPARB Grid of SP switch-attached p5-550sC p690 with Advanced POWER VirtualizationD p5-570 with Advanced POWER Virtualization
问题:单选题The pSeries technical specialist is designing a two LPAR p5-570 with eight total processors. The system is a test system to run AIX 5.2. The customer has stated a preference for internal disks for the boot devices. The customer has said they may later need to run three or four LPARs without increasing the number of processors. What should the pSeries technical specialist tell the customer about the ability of the p5-570 to meet their requirements?()A It will require additional SCSI adapters and I/O drawers or external disks to support more than two LPARs.B It has sufficient built-in SCSI controllers and disk enclosures to support four total LPARs by only adding the necessary additional disks.C It is unable to use internal disks for LPARs and therefore additional adapters I/O drawers or external disks must be used to support all LPARs.D It can support six LPARs with internal disks but will require special features, cables and an adapter to support the additional LPARs with internal disks.
问题:单选题A customer needs both a database and application server to communicate over a network. The new systems will be connected to the same network as the current IBM equipment with known IBM serial numbers. How could a pSeries technical specialist best determine which type of network card is appropriate, without making an additional call to the customer?()A Use an Inventory Services retrieval to show adapter features.B Retrieve previous eConfig proposals to see what others had shown.C Call the Account Executive to ask what the customer has used in the past.D Query the Supportline problem record database for the customer and LAN keyword matches.
问题:单选题A customer needs three 2-way application servers and is evaluating the purchase of three p5-520s versus one partitioned 6-way p5-570. They like the benefits provided with dynamic processor sparing. What information should the pSeries technical specialist emphasize to the customer?()A The p5-570 offers CoD processors.B The p5-570 requires more rack space than the three p5-520s.C Redundant power is standard on the p5-570 and is optional on the p5-520.D Operating system charges will be less expensive with the p5-520 solution.
问题:单选题What is a key advantage of the POWER5 technology over all other competitive offerings?()A POWER5 supports multiple operating systems.B POWER5 supports more nodes in a clustered environment.C POWER5 hypervisor has significantly less overhead than hardware partitioning.D POWER5 has greater granularity of resources such as memory, processors and I/O.
问题:单选题The customer has recently installed a pSeries p5-570 with EMC attached disk storage. After installation, the customer complained that the disk access appeared to be too slow. How should the pSeries technical specialist best assist the customer?()A Recommend the customer call EMC.B Recommend the customer call IBM hardware support.C Recommend the customer contact SupportLine.D Recommend the customer re-creates the volume groups.
问题:单选题The pSeries technical specialist has a number of tasks to perform and does not have time to do them all. It is a week before the end of quarter and the account executives all state that their individual requests are the highest priority. How should the following task list be prioritized? () 1. Return a call from customer seeking compatibility information. 2. Configure three p690 servers to be ordered in two weeks. 3. Prepare a POWER5 presentation to give to a customer in two weeks. 4. Configure three p690 servers to be ordered this quarter.A 4,2,1,3B 4,3,1,2C 2,4,3,1D 2,3,4,1
问题:单选题The account team designed a p5-570 solution to strategically position the customer for future IBM announcements. The customer was dissatisfied upon implementing the solution. An AIX v5.1 partition was added to the requirements halfway through the solution design process and it was not considered in the final design. What should the pSeries technical specialist have done to prevent this situation?()A Submitted an RPQ (Request for Quote) for AIX v5.1 support on a p5-570B Designed a p670 because it supports AIX 5.1 partitionsC Initially designed a solution supporting AIX 5.1 partitionsD Gained customer approval for the final design prior to ordering the system
问题:单选题During a presentation on the p5 machines, a customer asks the pSeries technical specialist a question regarding the differences between POWER4+ and POWER5. In addition to new advanced power management, SMT, and larger L2 and L3 caches in POWER5, which of the following describes some of the key improvements in POWER5?()A Micro-Partitioning support and the L3 controller is now between L2 and main memory.B Dynamic partitioning support and the L3 controller is now between L2 and main memory.C Micro-Partitioning support and the L3 controller is no longer between L2 and main memory.D Dynamic partitioning support and the L3 controller is no longer between L2 and main memory.
问题:单选题A bank is interested in technology that will enhance competitiveness and flexibility in the financial trading market by harnessing the typically unused power of idle machines. The pSeries technical specialist should make the customer aware of which IBM offering?()A IBM Grid ToolboxB IBM Capacity on DemandC IBM Cluster Systems ManagementD IBM Global Solutions Directory
问题:单选题A customer is putting together a high-performance computing cluster of p655 nodes. They need a total of 48 processors and want to get the best performance possible out of those systems. They are evaluating four options and have asked the pSeries technical specialist to recommend which one would provide the best performance based on total rPerf. Their workload may grow over time. Which of the following should the pSeries technical specialist recommend?()A Twelve 4-way p655 nodes and add more as neededB Six 8-way p655 nodes and add more as neededC Six 4-way p655 nodes with four processors CoD on each node in case of growthD Three 8-way p655 nodes with eight processors CoD on each node in case of growth
问题:单选题A customer asks the pSeries technical specialist to recommend which remote access (SSH or Telnet) method to use. What question should the customer be asked to best determine the proper recommendation?()A Is there a need for a PKI Management System?B Is there a need for end-to-end encryption?C Do they currently have a Kerberos domain in place?D Which clients are installed on their desktops -- SSH, Telnet or both?
问题:单选题A p5-550 with AIX 5.3 is being designed for availability. In addition to providing redundant adapters, which of the following should also be provided?()A Redundant processor pools, UPS, and HACMPB Redundant service processors, HACMP, and mirrored AIX drivesC Redundant processor pools, redundant service processors, and HACMPD Redundant power, redundant Virtual I/O Servers, and mirrored AIX drives
问题:单选题A customer wants to upgrade an existing pSeries system. In addition to retrieving the IBM configuration records, what else should be done to ensure an accurate upgrade quote is provided?()A Request that the pSeries technical specialist provide the discount percentage to the customer.B Run both eConfig and PCRS6000 to ensure that both configurators provide the same upgrade quote.C Confirm with the customer that the installed inventory accurately reflects what is actually installed.D Provide options to the customer so they can choose the most appropriate upgrade for their environment.
问题:单选题A pSeries technical specialist has completed a server consolidation study of a customer’s environment. An LPAR worksheet was produced, which details the resource (CPU, memory, disk, adapters) requirements for each OS image (partition) based on workload. What is the most appropriate next step?()A Update Siebel to include the study results.B Review the study results and LPAR worksheet with the customer.C Design detailed system configurations around the study results.D Work with the client executive and the brand manager to establish discounts.
问题:单选题A customer is evaluating the purchase of a new p570 8-way Express to replace their current set of ten 2-way database and application servers that are more than five years old. In addition to savings potential in the areas of operating system and database charges, what other significant savings component should be highlighted?()A Maintenance savings due to warranty on new machinesB Reliability savings of using one machine versus tenC Financial savings due to cash outlays now versus laterD Power savings even if the current power usage is unknown