Begin with a dual DP x445 and scale in the same chassis
Begin with a dual MP x445 and scale in the same chassis
Begin with a dual DP x445 and scale out in an extra chassis
Begin with a dual MP x365 and scale to a different machine
第1题:
A customer wants to purchase a Windows 2003 DataCenter Edition system to run an application. The application benefits the most by caching a vast amount of data in RAM so the user does not have to wait for disk I/O while editing. Processing is second in importance. If cost is not an issue, what machine will have the best performance?()
第2题:
You are evaluating the deployment of a Hyper-V host named Host1 that will host 10 VMs. Each VM will have the following configurations: - 10 GB of memory - Two virtual processors - One 300-gigabit fixed VHD - Two virtual network adapters You need to recommend changes to the standard server build to support the planned deployment. Which hardware components should be changed?()
第3题:
A. It will only become active after a software failure.
B. It will only become active after a hardware failure.
C. It requires that Cisco NSF be enabled in order to work successfully.
D. It synchronizes the MAC, FIB, and adjacency tables between Active and Standby Route Processors.
第4题:
A customer needs a new Microsoft Windows 2003 Server. They are running an application that requires substantial memory. They would like a rack mountable system, which will support four Xeon processors with 2MB of L3 cache. Which of the following is the minimum configuration to satisfy the customer’s requirements?()
第5题:
A recently ordered server came standard with one 3.0GHz processor. It is capable of handling fourtotal processors. Which of the following processor combinations can be used in this server?()
第6题:
You are installing Windows 2000 Professional on 100 MPS compliant computers. You have created an image of this computer and copied the image to two test computers, which have two processors installed on them. When you run the test computers, you find out that the second processor on both the computers is not being used. What should you do to enable the second processor?()
第7题:
You are evaluating the deployment of a Hyper-V server that will host 10 VMs. Each VM will have the following configurations: - 8 GB of memory - Two virtual processors - One 200-gigabit fixed VHD - Two virtual network adapters You need to recommend changes to the standard server build to support the planned deployment. Which hardware components should be changed?()
第8题:
An administrator has set up three partitions using a shared processor pool with 2 processors and SMT turned on. The partitions are activated in the following sequence: Partition one: Min = 0.5, max = 3.0, desired = 1.0; Partition two: Min = 1.0, max = 3.0, desired = 1.5 Partition three: Min = 1, max = 0.5, desired = 2. What is the outcome?()
第9题:
A database administrator wants to design a multi-partition database that can take advantage of both intra-partition parallelism and inter-partition parallelism. Which configuration will allow the use of these types of parallelism while using the least number of hardware components (servers, processors)? ()
第10题:
The pSeries technical specialist is designing a two LPAR p5-570 with eight total processors. The system is a test system to run AIX 5.2. The customer has stated a preference for internal disks for the boot devices. The customer has said they may later need to run three or four LPARs without increasing the number of processors. What should the pSeries technical specialist tell the customer about the ability of the p5-570 to meet their requirements?()