问题:单选题A Power 770 customer needs to add additional I/O adapters. There is no room for the cards, so an I/O drawer must be added. What resource will help identify supported I/O drawers and the maximum number of drawers permitted per loop?()A I/O Planning GuideB Power Systems data sheetC Power Systems Facts and FeaturesD Run FLRT to recommend I/O features
查看答案
问题:单选题A customer is evaluating using the PCIe SSD adapter for the system boot in their new Power 750. Redundancy and hot-swap capability are required. What configuration supports the customer requirements?()A Configure the PCIe SSD adapter and drive modules as a JBODB Configure a pair of mirrored PCIe SSD adapters and drive modulesC Configure the PCIe SSD adapter and drive modules in a RAID-6 arrayD Configure the PCIe SSD adapter and drive modules in a RAID-5 array
问题:单选题A customer wants to run a Domino e-mail application,a Business Intelligence database,and a batch processing application on Linux.The workloads have different behaviors and do not have peaks at the same time. What is a benefit of running these applications on a Power Systems server instead of running on separate x86 servers?()A Each Linux application can run in a Workload Partition, reducing the management efforts.B Total cost of Linux applications on Power Systems is more cost effective than on x86 because of platform licensing.C Memory cloning can be used on the Power Systems to have a single image of the Linux kernel shared by all partitions.D Using micro-partitions on Power Systems allow the workloads to share the processing resources, increasing the overall system utilization.
问题:单选题A company runs very large database applications on multiple HP-UX servers. They recently upgraded the device drivers for their fibre channel HBAs and have suffered numerous crashes on several systems. Which feature of Power Systems running AIX would help eliminate this problem during pre-release testing of a new device driver?()A Redundant VIO serversB Storage Protection KeysC Electronic Service AgentD NPIV support in the kernel
问题:单选题An IT manager needs to deploy multiple applications simultaneously. Which virtualization technology will reduce the number of operating system maintenance tasks?()A Workload partitionsB Dynamic logical partitionsC Dedicated logical partitionsD Virtualized logical partitions
问题:单选题A customer is moving from an HP-UX environment to an AIX environment. They will be producing a master image of the environment and will need to install it into hundreds of LPARs and WPARs. Which AIX tool will be of most use in this case?()A NIMB smitC SUMAD netboot
问题:单选题An electrician needs to know what type of receptacle is required. What is the most up-to-date resource to identify the plug type for the feature code ordered?()A InfocenterB ITSO RedbooksC Facts and FeaturesD System Planning Tool
问题:单选题A financial company is auditing to ensure their systems are safe from external attack.They have just purchased new Power 750 servers. Which features of AIX 6.1 will help in the auditing process?()A IPSec and Kerberos AuthenticationB Secure By Default and AIX Security ExpertC Trusted Execution and Role Based Access ControlD First Failure Data Capture and Storage Protection Keys
问题:单选题Which of the following is a correct statement about rPerf?()A It can only be used on systems running without partitions.B It is relevant for IBM systems running the AIX operating system.C It is the main benchmark for sizing systems that will run HPC applications.D It has a direct relationship with other benchmarks like TPC-C and SpecjAppServer2004.
问题:单选题Which of the following is a correct statement about Workload Partitions (WPARs)?()A WPARs use dedicated cores and shared memory.B WPARs are restricted to using dedicated resources.C WPARs share the resources of a single AIX instance.D WPARs use shared cores, memory, and dedicated network adapters.
问题:单选题The systems administrator of a large manufacturer has POWER5 and POWER6 servers, each with LPARs running AIX 6.1. They are running several workloads including SAP, DNS, Oracle, DB2 and WebSphere Application Server, and plan to consolidate onto one POWER7 server. How can the system administrator determine how much benefit Active Memory Expansion (AME) could provide for the consolidated system?()A Run amepat now on all of the existing LPARs.B Run amepat after consolidation on all LPARs.C Run amepat now on all existing LPARs running on the POWER6 servers.D Run amepat now on all existing LPARs running database applications.
问题:单选题A customer has a requirement to eliminate single points of failure for an application. They have allocated one Ethernet adapter to each VIO server on the system. Which features of PowerVM and AIX will support the customer requirement?()A Etherchannel and trunkingB Network Interface Backup and EtherchannelC Shared Ethernet Adapter (SEA) Failover and EtherchannelD Network Interface Backup and Shared Ethernet Adapter failover
问题:单选题A proposed server architecture includes SAN LUNs being presented to client LPARs using shared HBAs to reduce infrastructure cost. The customer requires minimal management efforts for the dual VIO Servers. Which technology is recommended for this proposal?()A NPIVB vSCSIC Arbitrated loopD Converged adapter
问题:单选题A customer would like to consolidate multiple database workloads to a single server to reduce TCO. What is the effect of PowerVM on TCO?()A Reduces SAN costB Reduces network costC Reduces administration costsD Reduces software licensing cost
问题:单选题A customer has systems with AIX 6.1 and 5.3 distributed across two data centers located 8km apart. They want to implement high availability with automated application restart and synchronous data replication between the IBM Systems Storage DS8700 systems which are installed in each datacenter. Which solution addresses the customer requirements?()A Use the Geographic Logical Volume Manager (GLVM) for MetroMirror, and Live Partition Mobility to automate partition migration upon failureB Use MetroMirror for the AIX volumes and High Availability Disaster Recovery (HADR) to automate partition migration and restart upon failure.C Use the Geographic Logical Volume Manager (GLVM) for MetroMirror to replicate the data between the two sites and automate application recovery.D Use MetroMirror for the AIX volumes, and PowerHA SystemMirror Enterprise Edition to automate failover of MetroMirror pairs and automate application recovery.
问题:单选题A Power Systems customer would like to upgrade their HMC to the latest version of software tosupport a new hardware feature. What resource will help identify dependencies for firmware and system software for their upgrade?()A ITSO RedbooksB Facts and FeaturesC System Planning ToolD Fix Level Recommendation Tool
问题:单选题System software for the Power 780 server is licensed at which tier?()A LargeB SmallC MediumD Enterprise
问题:单选题What advantages do WPARs have over LPARs?()A Security is isolated by the HMCB Support Live Partition MobilityC Operating system faults are isolatedD Reduced system management during upgrades
问题:单选题A Power 720 has AIX 6.1 and Linux partitions.During normal workloads there is more than enough memory available to the LPARs. During month-end processing one partition becomes memory constrained. What can help overcome this situation?()A Active Memory Sharing (AMS)B Active Memory Expansion (AME)C Integrated Virtual Memory (IVM)D Memory Capacity on Demand (CoD)