单选题Company.com wants to reassign a host bus adapter (HBA) from one partition to another to  handle increased I/O workload on that partition. What needs to be done to dynamically move the card?()A Use the rmdev command to remove the card from the current p

题目
单选题
Company.com wants to reassign a host bus adapter (HBA) from one partition to another to  handle increased I/O workload on that partition. What needs to be done to dynamically move the card?()
A

Use the rmdev command to remove the card from the current partition before doing the DLPAR process.

B

Take the source partition down and do the DLPAR function on the target partition.

C

Assign the card to the required section of the target partition and run cfgmgr.

D

Dynamically remove the card from the source and add to target profile then reactivate the target profile.

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

Company.com wants to reassign a host bus adapter (HBA) from one partition to another to  handle increased I/O workload on that partition. What needs to be done to dynamically move the card?()

  • A、Use the rmdev command to remove the card from the current partition before doing the DLPAR process.
  • B、Take the source partition down and do the DLPAR function on the target partition.
  • C、Assign the card to the required section of the target partition and run cfgmgr.
  • D、Dynamically remove the card from the source and add to target profile then reactivate the target profile.

正确答案:A

第2题:

Companycom will be using Virtual IO Server to share Ethernet adapters. What can be done to prevent network failure of the client if a Virtual IO Server goes down?()

  • A、Create two virtual adapters on the client, each one from a separate Virtual IO Server
  • B、Enable dead gateway detection on the client so that the network traffic can be rerouted
  • C、Have a spare network card on standby in the client in case the Virtual IO Server goes down
  • D、Create an etherchannel adapter on the client using one Virtual Ethernet adapter from two  separate Virtual IO Servers

正确答案:A

第3题:

A system has two configured fibre channel cards, one of which, fsc0, has failed and must be replaced.Which command should an administrator use to remove the card device and attached child devices?()

A.rmdev -Rdl fcs0

B.rmdev -cdl fcs0

C.rmdev -cdl fscsi0

D.rmdev -Rdl fscsi0


参考答案:A

第4题:

A system administrator for a business recovery service center needs to test disaster recovery strategies for their clients running Linux. Each client has a different system configuration. Each time a client comes in, the system configuration of the managed system must change. What is the best way to handle this using LPAR?()

  • A、Create a system profile. Reconfigure the managed system by activating and deactivating the system profiles. 
  • B、Create one partition profile for each client. Reconfigure the managed system by activating the partition profiles for that client. 
  • C、Dynamically move processors and memory as needed into each logical partition. Reconfigure the managed system by activating and deactivating partition profiles. 
  • D、Dynamically move processors and memory into each logical partition on the server if additional resources are needed. Reconfigure the managed system by activating and deactivating the system profiles.

正确答案:B

第5题:

A system has two configured fibre channel cards, one of which, fsc0, has failed and must be replaced. Which command should an administrator use to remove the card device and attached child devices?()

  • A、rmdev -Rdl fcs0
  • B、rmdev -cdl fcs0
  • C、rmdev -cdl fscsi0
  • D、rmdev -Rdl fscsi0

正确答案:A

第6题:

Company.com wants to create four partitions on a pSeries p5-570 8-way with one SCSI PCI adapter connected to an external LTO tape drive. The partitions are to be created from an existing system image backup tape.  Which of the following actions will enable the creation of the partitions with minimal intervention?()

  • A、Install a VIO partition to share the tape drive.
  • B、Purchase three external SCSI adapters and physically move the tape drive when needed.
  • C、Create the partition definitions with the SCSI adapter as a desired resource and use DLPAR commands to move the tape drive.
  • D、Create the partition definitions with the SCSI adapter as a required resource for all partitions and use DLPAR commands to move the tape drive.

正确答案:C

第7题:

A technical specialist has installed a Host Bus Adapter (HBA) on a p5-550 server. The system has four AIX 5L V5.3 partitions and a Virtual I/O server. The HBA will be used to connect all four partitions to a DS8000 storage array. What else must be performed to make the storage available to the partitions?()

  • A、Allocate the HBA to a client partition.
  • B、Restart the Virtual I/O Server to detect the changes.
  • C、Install the device driver for the DS8000 in each of the four AIX partitions.
  • D、Allocate the HBA to the VIO server partition and install necessary drivers.

正确答案:D

第8题:

Companycom has a 16 way 1.65 GHz p5 590 and wants to install a i5/OS partition on their server. The customer wants to keep installation costs to a minimum by sharing devices between all LPARs. Before the operating system can be installed in this partition, the customer was told that there are certain limitations that must be observed. What are these limitations?()

  • A、When the i5/OS partition is housed in the p5 590, the HMC allows seamless installation in a partition as long as the minimum one processor, 256 MB of memory, one Ethernet and one boot adapter/disk is available from internal hardware. 
  • B、V5R3 and later releases of i5/OS can be installed on a POWER5 server partition. Only one processor can be assigned to the i5/OS. A special expansion tower must be ordered. This expansion tower and its devices can be shared with other OS partitions. 
  • C、When the i5/OS partition is housed in the p5 590, the 5250 Twinaxial console must be used to set up the partition. Only one processor can be assigned to the i5/OS partition. A special expansion tower must be ordered to house the IOPs. Devices in the special expansion tower can be shared with other Linux partitions.  
  • D、V5R3 and later releases of i5/OS can be installed on IBM eServer p5 servers. i5/OS can run on two processors in the p5 590. A special expansion tower must be ordered. This expansion tower and its devices cannot be shared with other OS partitions. The iSeries expansion towers are seen by the IBM eServer p5 server as an I/O subsystem.

正确答案:D

第9题:

A System p customer is planning to implement virtualization and is concerned about how to respond  to an increased workload and what limitations there are for very small workloads.  Which of the following describes the minimum size for an LPAR and the minimum amount that can be transferred from on LPAR to another()

  • A、Smallest partition 10% of all available processors, as small as 1% of all available processors may be transferred.
  • B、Smallest partition 10% of a processor, as small 1% of a processor may be transferred.
  • C、Smallest partition one processor, as small 1% of a processor may be transferred.
  • D、Smallest partition one core, as small 10% of a processor may be transferred.

正确答案:B

第10题:

What is a design consideration when using existing PCIe I/O drawers in a maximum bandwidth/throughput configuration on a new Power 750 system?()

  • A、The new system requires 1 installed processor card for the GX++ bus adapter
  • B、The new system requires a minimum of 2 installed processor cards for the GX++ bus adapter
  • C、The new system requires a minimum of 3 installed processor cards and the HPC InfiniBand cluster adapter
  • D、The new system requires 1 installed processor card for the GX++ bus adapter and the HPC InfiniBand  cluster adapter

正确答案:B

更多相关问题