单选题During the project, requirements change for a variety of reasons. As needs change and as work proceeds, additional requirements are derived and changes may have to be made to the existing requirements. It is essential to manage these additions and chan

题目
单选题
During the project, requirements change for a variety of reasons. As needs change and as work proceeds, additional requirements are derived and changes may have to be made to the existing requirements. It is essential to manage these additions and changes efficiently and effectively. To effectively analyze the impact of the changes, it is necessary that the source of each requirement is known and the rationale for any change is documented. The project manager may, however, want to track appropriate measures of requirements volatility to judge whether new or revised()are necessary.
A

proceedings

B

controls

C

forecastings

D

Prelibations

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

By which means is a contractor able to control cost overruns due to changing requirements?

A Project data review

B Change order

C Purchase order amendment

D Change control

E None of the above.


正确答案:D

第2题:

139 By which means is a contractor able to control cost overruns due to changing requirements? A. Project data review

B. Change order

C. Purchase order amendment

D. Change control

E. None of the above


正确答案:D

第3题:

The purpose of configuration management is to:

A.insure drawings are updated

B.control change throughout the project

C.control change during the production only

D.generate engineering change proposals

E.inform. the project manager of changes


正确答案:B
B

第4题:

● During the project, requirements change for a variety of reasons. As needs change and as work proceeds, additional requirements are derived and changes may have to be made to the existing requirements. It is essential to manage these additions and changes efficiently and effectively. To effectively analyze the impact of the changes, it is necessary that the source of each requirement is known and the rationale for any change is documented. The project manager may, however, want to track appropriate measures of requirements volatility to judge whether new or revised (75)are necessary.

(75)

A. proceedings

B. controls

C. forecasting’s

D. prelibations


正确答案:B

第5题:

● The purpose of configuration management is to:

A insure drawings are updated

B control change throughout the project

C control change during the production only

D generate engineering change proposals

E inform. the project manager of changes


正确答案:B

第6题:

The "buy or make" decision is usually made during the:

A acquisition cycle

B contract evaluation cycle

C requirements cycle

D pre-award cycle

E at any time that is convenient for the project manager


正确答案:C

第7题:

33 The purpose of configuration management is to:

A. insure drawings are updated

B. control change throughout the project

C. control change during the production only

D. generate engineering change proposals

E. inform. the project manager of changes


正确答案:B

第8题:

● The project (73)is a key input to quality planning since it documents major project deliverables, the project objectives that serve to define important stakeholder requirements, thresholds, and acceptance criteria.

(73)

A. work performance information

B. scope statement

C. change requests

D. process analysis


正确答案:B

第9题:

● The project maintains a current and approved set of requirements ovethe life of the project by doing the following:

· (73) all changes to the requirements

· Maintaining the relationships among the requirements, the project plansand the work products

· ……

(73)

A. Monitoring

B. Managing

C. Gathering

D. Reducin


正确答案:B

第10题:

● Changes may be requested by any stakeholder involved with the project, but changes can be authorized only by (73).

(73)

A.executive IT manager

B.project manger

C.change control board

D.project sponsor


正确答案:C
试题(73)分析
 项目变更可以由IT经理executive IT manager、项目管理者project manager、项目发起人project sponsor等任意项目干系人发起,但只有变更控制委员会change control board授权通过,所以选C。
参考答案
(73)C