also called GM
the void portion of the ship below the waterline which is enclosed and watertight
affected by the number of transverse watertight bulkheads
the watertight portion of a vessel above the waterline
第1题:
Serious loss of reserve buoyancy resulting from flooding any compartment of a ship will always ______.
A.increase the trim
B.change the free surface effect
C.cause a serious list
D.decrease ship stability
第2题:
A.algorithm=failover
B.algorithm=round_robin
C.reserve_policy=no_reserve
D.reserve_policy=single_path
第3题:
There are two major types of reserves used on projects. The _____ is for (usually major) scope changes that were not considered as part of the original plan, whereas the _____ is to compensate for minor changes in estimating, escalation factors.
A . Management reserve, unplanned allowance fund.
B . Management reserve, contingency.
C . Contingency fund, management reserve.
D . Unplanned allowance fund, budgetary reserve.
E . Unplanned reserve, planned reserve.
第4题:
When configuring dual VIO servers to connect to SAN based disk in failover mode, what setting must be applied? ()
第5题:
Could you()the times of flights to Atlanta and reserve me a seat?
A find through
B find
C find over
D find out
第6题:
The amount of freeboard affects the ______.① amount of reserve buoyancy of a vessel ② range of stability of a vessel.
A.① only
B.② only
C.Both ① and ②
D.Neither ① nor ②
第7题:
One of the contributions of Woodrow Wilson was()
Anatural conservation
Bthe construction of irrigation projects
Cthe setting-up of the Federal Reserve Board and twelve Federal Reserve Banks
Dthe introduction of tariff increase and a low income tax
第8题:
第9题:
PDCH分为哪两种状态的信道:()
第10题:
submerged hulls
quarters
columns and upper structure
submerged connecting structures