Which statement(s) is/are TRUE concerning crane cargo operations?
A.Do not exceed rated load capacity of crane and container spreader or slings
B.During any cargo handling operation,the safety of personnel is paramount
C.Cargo handlers must be outfitted with adequate protection from personal injury
D.All the above
第2题:
The port State control officer will ensure that ______ is performed by all crude carriers either required to have a crude oil washing system or where the owner or operator chooses to install a crude oil washing system.
A.cargo loading operations
B.cargo unloading operations
C.cargo control operations in the transport
D.crude oil washing
第3题:
Never______stowed like this.
A.optional cargo should be
B.should optional cargo be
C.should be optional cargo
D.optional cargo must be
第4题:
When using slings,cargo handlers should take all the following precautions except ______.
A.Ensure that slings are securely fastened around the load
B.Avoid careless winch operations,especially when handling fragile cargo
C.Exercise care when using hooks,crowbars,and similar tools
D.Keep the loads as close to the rail or deck as possible
第5题:
During the planning stage of cargo operations,stress and displacement calculations should be carried out at incremental steps commensurate with the number of _____ and loading sequence of the proposed operation.
A.coefficient of loading
B.stowage factors
C.orders
D.pours
第6题:
Which safety precaution(s)should be observed during crane operations ________.
A.Checking for proper lifting from beneath the load during cargo operations
B.Using the proper slings or other lifting devices during cargo operations
C.Relaying communications to port agents on the pier during cargo hoists
D.All of the above
第7题:
During cargo operations,your vessel develops a list due to the center of gravity rising above the transverse metacenter.To correct the list,you should ______.
A.Shift weight to the high side
B.Shift weight to the centerline
C.Add weight in the lower holds or double bottoms
D.Remove weight from the lower holds or double bottoms
第8题:
Two buildings on the San Jose campus of a small company must be connected to use Ethernet with a bandwidth of at least 100 Mbps. The company is concerned about possible problems from voltage potential differences between the two buildings. Which media type should be used for the connection()。
A.UTP cable
B.STP cable
C.coaxial cable
D.fiber optic cable
第9题:
Bonding cables are used during cargo transfer to ______.
A.provide safe electrical power connection to barge equipment
B.keep the vessel from surging excessively
C.prevent an accidental discharge of static electricity
D.secure the cargo hose to a hatch when loading overall
第10题:
A bonding cable should be connected for cargo operations aboard a tank vessel as soon as the ______.
A.Cargo has been loaded or discharged
B.Cargo hose is connected
C.Cargo pumps are started
D.Vessel is ready to handle cargo