A pSeries technical specialist has completed a server consol

题目
单选题
A pSeries technical specialist has completed a server consolidation study of a customer’s environment.   An LPAR worksheet was produced, which details the resource (CPU, memory, disk, adapters) requirements for each OS image (partition) based on workload.   What is the most appropriate next step?()
A

Update Siebel to include the study results.

B

Review the study results and LPAR worksheet with the customer.

C

Design detailed system configurations around the study results.

D

Work with the client executive and the brand manager to establish discounts.

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

A customer has requested the most cost-effective p5 solution allowing for growth.  Which of the following should the pSeries technical specialist consider doing when configuring each p5 system using eConfig?()

  • A、Implementing CoD
  • B、Using Express Configurations with processor upgrades
  • C、Meeting the minimum Value Pak rules
  • D、Engaging the pSeries representative to identify appropriate discounts

正确答案:C

第2题:

The pSeries technical specialist has been invited to a briefing on the latest POWER technology as a representative of their team.  What should the specialist offer to do upon return from class in order to best prepare the rest of the team for the introduction of the new technology?()

  • A、Archive the materials in the team’s library.
  • B、Act as the sole technical resource for the team.
  • C、Summarize the information and make it available to the team.
  • D、Evaluate the class and recommend attendance to other team members.

正确答案:C

第3题:

The customer has recently installed a pSeries p5-570 with EMC attached disk storage.  After installation, the customer complained that the disk access appeared to be too slow.  How should the pSeries technical specialist best assist the customer?()

  • A、Recommend the customer call EMC.
  • B、Recommend the customer call IBM hardware support.
  • C、Recommend the customer contact SupportLine.
  • D、Recommend the customer re-creates the volume groups.

正确答案:C

第4题:

A pSeries technical specialist has been asked to provide a server consolidation solution to replace several AIX servers running typical commercial database workloads.  Benchmarks for SPECint, SPECfp, SPECjbb as well as estimates of ROLTP and rPerf are available for all the current systems. Which of the following could be used as a first approximation of total performance required for one large server?()

  • A、Sum of SPECfp values
  • B、Sum of rPerf values only
  • C、Sum of rPerf and ROLTP values
  • D、Sum of SPECint and SPECjbb values

正确答案:B

第5题:

A customer has two locations that host their pSeries servers.  Traffic is being routed through the public Internet.  The customer needs to exchange confidential financial data between the servers.  Which of the following solutions should the pSeries technical specialist propose to the customer to secure the data?()

  • A、A DCE domain
  • B、A Kerberos domain
  • C、A PPP tunnel between the servers
  • D、An IPSEC tunnel between the servers

正确答案:D

第6题:

A customer is having problems after an AIX version upgrade from 5.2 to 5.3.  Which of the following should the pSeries technical specialist recommend that the customer call?()

  • A、IBM Techline
  • B、IBM Supportline
  • C、IBM Software Distribution
  • D、IBM Hardware Support

正确答案:B

第7题:

A customer has a large UNIX environment and has engaged a pSeries technical specialist to work on a solution with them.  Which of the following statements would best establish UNIX credibility with a knowledgeable customer?()

  • A、The technical support specialist has completed a UNIX course at college.
  • B、The technical specialist has supported several similar projects and has earned an IBM AIX certification.
  • C、The technical support specialist’s company sells $3M of UNIX computer systems every year.
  • D、The technical support specialist has sold and installed at least a dozen Apple and iSeries systems with POWER processors.

正确答案:B

第8题:

A financial industry customer will consolidate their Intel-based servers to a p5-550 running AIX, and needs experienced technical services.  What information should the account executive provide to the customer to assure them that the technical specialist has the required experience?()

  • A、The technical specialist has supported multiple Cluster 1350 environments. References will be provided.
  • B、The technical specialist is Linux-certified by two industry groups. Certificate copies will be provided.
  • C、The technical specialist has worked on multiple UNIX consolidation projects.  References will be provided.
  • D、The technical specialist has worked on Linux consolidation efforts.  References will be provided.

正确答案:C

第9题:

The pSeries technical specialist is designing a two LPAR p5-570 with eight total processors.  The system is a test system to run AIX 5.2.  The customer has stated a preference for internal disks for the boot devices.  The customer has said they may later need to run three or four LPARs without increasing the number of processors. What should the pSeries technical specialist tell the customer about the ability of the p5-570 to meet their requirements?()

  • A、It will require additional SCSI adapters and I/O drawers or external disks to support more than two LPARs.
  • B、It has sufficient built-in SCSI controllers and disk enclosures to support four total LPARs by only adding the necessary additional disks.
  • C、It is unable to use internal disks for LPARs and therefore additional adapters I/O drawers or external disks must be used to support all LPARs.
  • D、It can support six LPARs with internal disks but will require special features, cables and an adapter to support the additional LPARs with internal disks.

正确答案:B

第10题:

The pSeries technical specialist has been asked to verify a solution that has six servers connecting to a 7316-TF3 rack-mounted flat-panel console.   Each server will connect into the 4202 Keyboard/Video/Mouse (LCM Switch).   What is the minimum number of KVM Conversion Cable Options (FC 4268) required to complete this installation?()

  • A、1
  • B、2
  • C、6
  • D、8

正确答案:B

更多相关问题