A financial customer has three data centers that are approximately five kilometers apart. Their SAP application data needs to be kept synchronized within 10 milliseconds between the three sites. Which of the following solutions satisfies the customer's recovery time objective?()
第1题:
(b) The chief executive of Xalam Co, an exporter of specialist equipment, has asked for advice on the accounting
treatment and disclosure of payments made for security consultancy services. The payments, which aim to
ensure that consignments are not impounded in the destination country of a major customer, may be material to
the financial statements for the year ending 30 June 2006. Xalam does not treat these payments as tax
deductible. (4 marks)
Required:
Identify and comment on the ethical and other professional issues raised by each of these matters and state what
action, if any, Dedza should now take.
NOTE: The mark allocation is shown against each of the three situations.
第2题:
A financial customer has three data centers that are approximately five kilometers apart. Their SAP application data needs to be kept synchronized within 10 milliseconds between the three sites.Which of the following solutions satisfies the customer‘s recovery time objective?()
A. DS8700 systems at each site running Metro Mirror
B. DS5300 systems at each site running Metro Mirror
C. DS5100 systems at each site running Global Mirror
D. XIV systems at each site running synchronous mirroring
第3题:
In a contract, the point of total assumption refers to the point where:
A . The customer incurs the total financial responsibility for each additional dollar spent.
B . The contractor incurs the total financial responsiblity for each dollar spent.
C . The schedule and cost variance are zero.
D . The customer will incur no further costs for the work the contractor performs in the completion of the contract.
E . B and D only.
第4题:
One of your customer has six sites, three of which process a large amount of traffic among them.He plans to grow the number of sites in the future. Which is the most appropriate design topology?()
第5题:
A Certificate of Financial Responsibility attests that the vessel ______.
A.has financial backing to meet any liability resulting from the discharge of oil
B.has the minimum required amount of P & I and hull insurance
C.will assume the responsibility for any damage or loss to the shipper
D.has financial reserves to meet reasonable expected crew costs of an intended voyage
第6题:
A.Network installation manager
B.Boot from installation media
C.A migration install
D.Copy the system using the HMC
第7题:
Your customer wants to build a network for a financial trading floor that has a requirement for multiple high-value transactions, which are also vital to the customer. What are the two most critical requirements? ()(Choose two.)
A. no single point of failure
B. trading database server location
C. redundant application servers location
D. deterministic response to all failures
E. determine which protocol to use
第8题:
(ii) Briefly discuss THREE disadvantages of using EVA? in the measurement of financial performance.
(3 marks)
第9题:
What are three project goals of a Technical Decision Maker? ()
第10题:
A customer has an EMC Symmetrix DMX3000 that is at the end of lease. The environment consists of IBM System p, IBM System i, and IBM System z. The customer is evaluating EMC, HDS, and IBM storage as possible replacements. They are interested in comparing the performance of all three disk subsystems. Which tool compares performance()