第1题:
Which of the following actions is an example of risk response:
A adjust project parameters (scope, time, quality ...)
B reduce the probability of potential project risk events
C reduce the consequences of potential project risk events
D wait until a problem actually happens, then deal with it in the most effective and efficient manner.
E A, B and C only
第2题:
23 Which of the following actions is an example of risk response:
A. adjust project parameters (scope, time, quality ...)
B. reduce the probability of potential project risk events C. reduce the consequences of potential project risk events
D. wait until a problem actually happens, then deal with it in the most effective and efficient manner.
E. A, B and C only
第3题:
The risk of accepting a lot of poor quality, in acceptance sampling, is referred to as:
A . buyer's risk
B . consumer's risk
C . producer's risk
D . type I error
E . B and D only
第4题:
A、number.
B、quality.
C、amount.
D、altitude.
第5题:
105 Which of the following actions is an example of risk response:
A. adjust project parameters (scope, time, quality ...)
B. reduce the probability of potential project risk events
C. reduce the consequences of potential project risk events
D. wait until a problem actually happens, then deal with it in the most effective and efficient manner.
E. A, B and C only
第6题:
100 The auditing function that provides feedback about the quality of output is referred to as:
A. quality control.
B. quality planning.
C. quality assurance.
D. quality improvement
E. All of the above
第7题:
87 The key ingredient to a successful quality management program are _____.
A. management's quality philosophy, operational quality assurance and operational quality control. B. quality evaluation methods and functional quality integrators.
C. technical quality administration, the technical quality specifications, and the quality process review. D. quality evaluation methods, quality progress reviews and the technical quality specifications.
E. All of the above
第8题:
The key ingredient to a successful quality management program are _____.
A . management's quality philosophy, operational quality assurance and operational quality control.
B . quality evaluation methods and functional quality integrators.
C . technical quality administration, the technical quality specifications, and the quality process review.
D . quality evaluation methods, quality progress reviews and the technical quality specifications.
E . All of the above.
第9题:
11 The risk of accepting a lot of poor quality, in acceptance sampling, is referred to as:
A. buyer's risk
B. consumer's risk
C. producer's risk
D. type I error
E. B and D only