第1题:
62 Make or buy decisions are usually made during the _____ phase of a project.
A. Conceptual
B. Development.
C. Implementation
D. Execution
E. Close-out
第2题:
● Make or buy decisions are usually made during the _____ phase of a project.
A Conceptual
B Development.
C Implementation
D Execution
E Close-out
第3题:
Make or buy decisions are usually made during the _____ phase of a project.
A.Conceptual
B.Development.
C.Implementation
D.Execution
E.Close-out
第4题:
●The traditional model for systems development was that an IT department used (71)which is a process-centered technique, and consulted users only when their input or approval was needed. Compared with traditional methods, many companies find that JAD allows key users to participate effectivelyin the (72). When properly used, JAD can result in a more accurate statement of system requirements, a better understanding of common goals and a stronger commitment to the success of the new system. RAD is a team-based technique that speeds up information systems development and produces a functiog.information system. Whilethe end productof jAD is a(an)(73),theendproduct of RAD is the (74) .The RAD model consists offour phases. During the(75),users interact with systems analysts and develop models and prototypes that represent all system processes, outputs, and inputs.
(71) A. structured analysis
B. object-oriented analysis
C. prototype analysis
D. process analysis
(72) A. initial scope definition
B. requirements modeling process
C. object modeling process
D. architecture design process
(73) A. data flow diagram
B. entity relationstip model
C. requirements model
D. object model
(74) A. system proposal
B. system design model
C. new system architecture
D. new information system
(75) A. requirements planning phase
B. user design phase
C. construction phase
D. cutover phase
第5题:
UML-based tools are often used for J2EE/.NET application analysis and design,both because UML's object orientation is ideal for the J2EE/.NET implementation(66) and because of the expanding scope and complexity of today's enterprise endeavors.(67) the approaches diverge at the coding/implementation phase,a common Set of analysis and design techniques applies to both J2EEand.NET.
The use of a virtual machine (VM) architecture is also common to J2EE and .NET. Application development tools(68) intermediate-level code instead of platform-specific binary code, which means the VM interprets that code in real time or performs Just-In-Time (JIT) compilation; the Microsoft VM always runs JIT-compiled code. This VM-based model results in(69)-independent applications and is conducive to the late-binding technique that's(70) to the OO approach.
A.block
B.model
C.module
D.group
第6题:
148 Network schedules are prepared during the _____ phase and updated during the _____ phase. A. Conceptual, execution.
B. Development, implementation.
C. Development, close-out.
D. Implementation, close-out.
E. Planning, finishing
第7题:
Many of the activities performed during the preliminary investigation are still being conducted in(71) , but in much greater depth than before. During this phase, the analyst must become fully aware of the(72) and must develop enough knowledge about the(73) and the existing systems to enable an effective solution to be proposed and implemented. Besides the(74) for process and data of current system, the deliverable from this phase also includes the(75) for the proposed system.
A.analysis phase
B.design phase
C.implementation phase
D.maintenance phase
第8题:
Network schedules are prepared during the _____ phase and updated during the _____ phase.
A.Conceptual, execution.
B.Development, implementation.
C.Development, close-out.
D.Implementation, close-out.
E.Planning, finishing.
第9题:
The analysis phase answers the questions of who will use the system, what the system will do, and where and when it will be used. During this phase, the project team investigates ny current system,identifies (71) , and develops a concept for the new system. This phase as three steps: first, (72) is developed to guide the project team's efforts. It usually ncludes an analysis of the current system and its problems, and the ways to design a new ystem. The next step is (73) The analysis ofthis information - in conjunction withinput rom the project sponsor and many other people - leads to the development of a concept for a ew system. The system concept is then used as a basis to develop a set ofbusiness analysis odels that describes how the business will operate if the new system were developed. The set of models typically includes models that represent the (74) necessary to support the nderlying business process. Last, the analyses, system concepts, and models are combined nto a document called the (75), which is presented to the project sponsor and other key ecision makers that decide whether the project should continue to move forward
A.improvementopportunities
B.logicalmodel
C.systemrequirements
D.systemarchitecture@@@SXB@@@A.a user manual
B.an analysis strategy
C. an analysis use case
D.a design user case@@@SXB@@@A.project scope definition
B.prob,lems analysis
C.decisionanalysis
D.requirementsgathering@@@SXB@@@A.dataandprocesses
B.systeminfrastructures
C.externalagents
D.systemsoftware@@@SXB@@@A.requirementsstatement
B.designspecification
C.systemproposal
D.project charter
第10题:
The stages within the development phase of the software life cycle are ( 71 ).
A.design, analysis, implementation, and testing
B.analysis, design, implementation, and testing
C.analysis, design, testing, and implementation
D.design, analysis, testing, and implementation