Changes may be requested by any stakeholder involved with the project,but changes can be authorized only by ( ) .

题目
Changes may be requested by any stakeholder involved with the project,but changes can be authorized only by ( ) .

A.executive IT manager
B.project manger
C.change control board
D.project sponsor
如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

Configuration management system can be used in defining approval levels for authorizing changes and providing a method to validate approved changes.()is not a project configuration management tool.

A.RationalClearcase

B.QualityFunctionDeployment

C.VisualSourceSafe

D.ConcurrentVersions System


参考答案:B

第2题:

The author predicts that _________.

A. advances in new technologies will lead to great changes of society

B. the single invention, the chip, will lead to great changes in society

C. the future picture of the world can only be imagined by looking back

D. the use of personal computer and factory robots will be widespread


正确答案:A
作者态度题。A项“advances in new technologies will lead to great changes of society”(新的科技进步将会给社会带来巨大的进步),根据文章第三段的分析是最符合题意的;B项“the single invention,the chip,will lead tO great changes of society”(硅片的发明将会给社会带来巨大的进步),命题本身正确,但不属于是作者推测的;C项“the future picture of the world can only be imagined by looking back”(对未来的猜想不能只靠回忆和思索过去).这句话意思正确,但不符合原文,更不属于作者的推测;D项“the use of personal computer and factory robots will be widespread”(个人计算机和工厂机器人的应用将会很广泛),意思正确,但不符合题意;所以,正确答案为A。

第3题:

The scope statement provides

A . A basis for future decisions about a project.

B . A baseline to accomplish verification measures.

C . A baseline to evaluate potential scope changes.

D . All of the above

E . B and C only


正确答案:D

 

第4题:

Only a very delicate thermometer can ________ such tiny changes in temperature in a precise way.

A、count

B、relate

C、measure

D、number


正确答案:C

第5题:

● Configuration management system can be used in defining approval levels for authorizing changes and providing a method to validate approved changes.(74) is not a project configuration management tool.

(74)

A.Rational Clearcase

B.Quality Function Deployment

C.Visual SourceSafe

D.Concurrent Versions System


正确答案:B
试题(74)分析
 配置管理的目的在于运用配置标识、配置控制、配置状态统计和配置审计,建立和维护工作产品的完整性。常用的配置管理工具有Visual SourceSafe、Rational Clearcase,以及Concurrent Versions System等。
 Quality Function Deployment质量功能展开是把顾客或市场的要求转化为设计要求、零部件特性、工艺要求、生产要求的多层次演绎分析方法,与配置管理无关,所以选B。
参考答案
(74)B

第6题:

● During the project, requirements change for a variety of reasons. As needs change and as work proceeds, additional requirements are derived and changes may have to be made to the existing requirements. It is essential to manage these additions and changes efficiently and effectively. To effectively analyze the impact of the changes, it is necessary that the source of each requirement is known and the rationale for any change is documented. The project manager may, however, want to track appropriate measures of requirements volatility to judge whether new or revised (75)are necessary.

(75)

A. proceedings

B. controls

C. forecasting’s

D. prelibations


正确答案:B

第7题:

● Changes may be requested by any stakeholder involved with the project, but changes can be authorized only by (73).

(73)

A.executive IT manager

B.project manger

C.change control board

D.project sponsor


正确答案:C
试题(73)分析
 项目变更可以由IT经理executive IT manager、项目管理者project manager、项目发起人project sponsor等任意项目干系人发起,但只有变更控制委员会change control board授权通过,所以选C。
参考答案
(73)C

第8题:

Project cash reserves are often used for adjustment in escalation factors which may be beyond the control of the project manager. Other than possibly financing (interest) costs and taxes, the three most common escalation factors involve changes in:

A . Overhead rates, labor rates and material costs.

B . Overhead rates, schedule slippages, and rework.

C . Rework, cost-of-living adjustments, and overtime.

D . Material costs, shipping cost, and scope changes.

E . Labor rates, material costs, and cost reporting.


正确答案:A

第9题:

are individuals and organizations that are actively involved in the project, or whose interests may be affected as a result of project execution or project completion; they may also exert influence over the project and its results.

A.Controls

B.Baselines

C.Project stakeholders

D.Project managers


正确答案:C
解析:项目干系人是积极参与到项目中,或其利益可能会受项目执行或完成结果影响的个人或组织:他们可能会对项目及其结果施加影响。

第10题:

According to the author, teenage rebellion ( ).

A. may be a false belief

B. is common nowadays

C.existed only in the 1960s

D. resulted from changes in families


正确答案:A
A[解析]根据最后一段第二句It is possible that the idea of teenage rebellion is not rooted in real facts.可推断出A项正确。