20 Which of the following events occurring after the balance sheet date are classified as

题目

20 Which of the following events occurring after the balance sheet date are classified as adjusting, if material?

1 The sale of inventories valued at cost at the balance sheet date for a figure in excess of cost.

2 A valuation of land and buildings providing evidence of an impairment in value at the year end.

3 The issue of shares and loan notes.

4 The insolvency of a customer with a balance outstanding at the year end.

A 1 and 3

B 2 and 4

C 2 and 3

D 1 and 4

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

You’re going to have a quiz ( )by another two in the ( )month.

A. followed,followed

B. followed,following

C. following,followed

D. following,following


参考答案:B

第2题:

阅读下面代码 class InterestTest ______ ActionListener { … public void actionPerformed(ActionEvent event) { double interest=balance * rate/100: balance+=interest: NumberFormat format=NumberFormat.getCurrencyInstance(); System.out.printlb("balance="+Formatter.format(balance)); } Private double rate; } 在下画线处,应填入的正确选项是

A.implementation

B.inheritance

C.implements

D.extends


正确答案:C
解析:关键字extends指明该类是子类,它的父类名紧跟在后,子类与父类之间有继承关系。关键字implements指明该类实现的接口,后跟接口名列表。因为ActionListener是时间监听器,是接口,所以这里要填入implements,故答案为C。

第3题:

The basic terminology for networks includes:

A.Activities, events, manpower, skill levels and slack.

B.Activities, documentation, events, manpower and skill levels.

C.Slack, activities, events, and time estimates.

D.Time estimates, slack, sponsorship involvement, and activities.

E.Time estimates, slack time, report writing, life cycle phases, and crashing times.


正确答案:C
C

第4题:

MatDEM中迭代计算函数主要包括d.balance和d.mo.balance,语句d.balance(20,20)表示_____

A.平衡计算400次,其中每平衡计算20次,记录一次模型状态。

B.仅平衡计算400次

C.平衡计算400s,其中每平衡计算20s,记录一次模型状态。

D.标准平衡步数为400次


A

第5题:

20.

A.how

B.when

C.why

D.which


正确答案:C
20.C【解析】句意;告诉他们为什么在外边待得晚一些对你来说很重要。

第6题:

Excel2010中,要用Sheet1的D2单元格的内容乘以20%,再加上Sheet3的B4单元格内容乘以80%作为Sheet2的A6单元格的内容,则应该在Sheet2的A6单元格输入()。

A.=Sheet1!D2*20%+Sheet3!B4*80%

B.=D2*20%+B4*80%

C.=Sheet1!D2*20%+B4*80%

D.=Sheet2!D2*20%+Sheet3!B4*80%


正确答案:A

第7题:

某数据库表中有一个工作时间字段,查找20天之内参加工作的记录的准则可以是( )。

A.BetweenDate()OrDate()一20

B.BetweenDate()AndDate()一20

C.<;Date()And>;Date()-20

D.<;Date()Or>;Date()-20


正确答案:B
暂无解析,请参考用户分享笔记

第8题:

113 The basic terminology for networks includes:

A. Activities, events, manpower, skill levels and slack.

B. Activities, documentation, events, manpower and skill levels.

C. Slack, activities, events, and time estimates.

D. Time estimates, slack, sponsorship involvement, and activities.

E. Time estimates, slack time, report writing, life cycle phases, and crashing times


正确答案:C

第9题:

在下列表达式中,运算结果为日期的是

A.DATE( )一CTOD(′05/20/98′)
B.DATE( )+10
C.CTOD(′05/20/99′)一DATE( )
D.YEAR(DATE( ))

答案:B
解析:
DATE( )返回当前的系统日期,所以DATE( )+10的运算结果为日期。其他几个选项进行了混合运算,结果不是日期。

第10题:

1、MatDEM中迭代计算函数主要包括d.balance和d.mo.balance,语句d.balance(20,20)表示_____

A.平衡计算400次,其中每平衡计算20次,记录一次模型状态。

B.仅平衡计算400次

C.平衡计算400s,其中每平衡计算20s,记录一次模型状态。

D.标准平衡步数为400次


正确