A heavy,thick-walled tube,usually steel,used between the drill pipe and the bit in the dri

题目

A heavy,thick-walled tube,usually steel,used between the drill pipe and the bit in the drill stem to weight the bit in order to improve its performance is called a ______.

A.heavy-walled drill pipe

B.tool joint

C.down hole tool

D.drill collar

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

A large valve,usually installed above the ram preventers,that forms a seal in the annular space between the pipe and wellbore or,if no pipe is present,on the wellbore itself is called the ______.

A.annular blowout preventer

B.annulus

C.accumulator

D.automatic choke


正确答案:A

第2题:

A heavy steel device that is set on the sea floor and used as a drilling template in offshore drilling operations is called a ______.

A.temporary guide base

B.permanent guide base

C.guide frame

D.foundation template


正确答案:A

第3题:

Which can be used for transferring a heavy patient between bed and trolley? ()

A. sliding sheet

B. sliding board

C. banana board

D. sling


参考答案:ABC

第4题:

重吊杆用于吊大的重件。()

  • A、Heavy derrick is used for lifting large heavy cargo.
  • B、Derrick is used for lifting large heavy cargo.
  • C、Heavy derrick is used for lifting dry bulk cargo.
  • D、Derrick is used for lifting dry bulk cargo.

正确答案:A

第5题:

The following tells us how to reuse the used water.Which is the right order of the passage

A.to have the used water filtered
B.to put chemicals in it
C.to pipe it to the users
D.to pipe the used water to be purified to a factory

答案:A
解析:

第6题:

A set of clamps that are latched onto the drill pipe to allow the driller to raise or lower the drill string out of or into the hole are the ______.

A.lifts

B.collars

C.elevators

D.clamps


正确答案:C

第7题:

The connected joints of pipe,usually made of three joints of pipe approximately 90 feet long,racked in the derrick when making a trip are called a ______.

A.String

B.Stand

C.Joint

D.Standpipe


正确答案:B

第8题:

A frame with two,or sometimes four,arms through which are threaded the guidelines and which is used to keep the drill stem and bit in line with the center opening in the temporary guide base is the ______.

A.drill stem guide

B.guide frame

C.drill string frame

D.casing guide


正确答案:B

第9题:

测深管()

  • A、sounding pipe
  • B、steel pipe
  • C、plastic pipe
  • D、wooden pipe

正确答案:A

第10题:

单选题
A carling is used aboard ship().
A

as a connecting strap between the butted ends of plating

B

to stiffen areas under points of great stress between beams

C

to prevent the anchor from fouling when the brake is released

D

to provide an extra heavy fitting in a heavy lift cargo rig


正确答案: A
解析: 暂无解析

更多相关问题