The Perform. Integrated Change Control process is conducted from project lnception through completion and is the ultimate responsibility of the(75)
A.change control board
B. project management office
C.project manager
D.configuration management officer
第1题:
33 The purpose of configuration management is to:
A. insure drawings are updated
B. control change throughout the project
C. control change during the production only
D. generate engineering change proposals
E. inform. the project manager of changes
第2题:
● A project manager believes that modifying the scope of the project may provide added value for the customer. The project manager should:
A Change the scope baseline
B Prepare a variance report
C Call a meeting of the configuration control board
D Change the project's objectives
E Postpone the modification until a separate enhancement project is funded after this project is completed according to the original baseline
第3题:
The purpose of configuration management is to:
A.insure drawings are updated
B.control change throughout the project
C.control change during the production only
D.generate engineering change proposals
E.inform. the project manager of changes
第4题:
A project manager believes that modifying the scope of the project may provide added value service for the customer.The project manager should______.
A.assign change tasks to project members
B.call a meeting of the configuration control board
C.change the scope baseline
D.postpone the modification until a separate enhancement project is funded after this project is completed according to the original baseline
第5题:
● Scope management is:
A a project control function.
B employs change control.
C a work authorization process.
D considers Cost, Quality and Schedule.
E All of the above.
第6题:
66 A project manager believes that modifying the scope of the project may provide added value for the customer. The project manager should:
A. Change the scope baseline
B. Prepare a variance report
C. Call a meeting of the configuration control board
D. Change the project's objectives
E. Postpone the modification until a separate enhancement project is funded after this project is completed according to the original baseline
第7题:
● The purpose of configuration management is to:
A insure drawings are updated
B control change throughout the project
C control change during the production only
D generate engineering change proposals
E inform. the project manager of changes
第8题:
Scope management is:
A.a project control function.
B.employs change control.
C.a work authorization process.
D.considers Cost, Quality and Schedule.
E.All of the above.
第9题:
● Project manager believes that modifying the project scope may provide added value for the customer. The project manager should (73) .
(73) A. change the scope baseline
B. contact the customer to determine if the change adds value
C. call a meeting of the change control board
D. change the project' s objectives
第10题:
A. Add a Web Control Library project to your solution. Define a class that inherits from CompositeControl.
B. Add a Windows Control Library project to your solution. Define a class that inherits from UserControl.
C. Add a Web User Control to your project. Define a class that inherits from UserControl.
D. Add a Mobile Web User Control to your project. Define a class that inherits from MobileUserControl.