单选题Two MAG4610s are running in an active/passive cluster configuration. The system administrator is planning to apply a service package to the cluster.Which process should the administrator follow?()A Perform the upgrade on the active node of the cluster.

题目
单选题
Two MAG4610s are running in an active/passive cluster configuration. The system administrator is planning to apply a service package to the cluster.Which process should the administrator follow?()
A

Perform the upgrade on the active node of the cluster. When completed, the node reboots and then pushes the service package to the passive node automatically.

B

Perform the upgrade on the passive node of the cluster. When completed, the node reboots and then pushes the service package to the active node automatically.

C

On the clustering status page, disable the active node. Perform the upgrade on the disabled node. When completed and the node reboots, enable the node on the clustering status page.Repeat the process on the passive node.

D

On the clustering status page, disable the passive node. Perform the upgrade on the disabled node. When completed and the node reboots, enable the node on the clustering status page.Repeat the process on the active node.

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

An administrator is planning an upgrade of a major software package on an application server.The software has been identified, the project approved and the upgrade purchased. Which of the following steps should the administrator take NEXT?()

  • A、Create a test environment for the new version.
  • B、Determine system requirements for the upgrade.
  • C、Request bids from other competing vendors in the product space.
  • D、Document the upgrade.

正确答案:A

第2题:

An administrator is planning an upgrade of a major software package on an application server.The software has been tested successfully in a test environment and it is ready to go into production. Which of the following steps should the administrator take next?()

  • A、Identify necessary operating system updates
  • B、Implement the change
  • C、Document the change
  • D、Schedule system down time

正确答案:D

第3题:

A new HACMP maintenance level has recently been released. An administrator is creating a  project plan that is required for applying the updates for a three-node production cluster.  To minimize downtime,what is the best way to accomplish the updates on all cluster nodes?()  

  • A、 Perform a graceful takeover one node at a time and apply the updates.
  • B、 Perform the updates on all nodes simultaneously using C-SPOC utilities.
  • C、 Perform the updates on node at a time with the cluster software active.
  • D、 Perform a graceful stop of all cluster nodes and apply updates to all nodes.

正确答案:A

第4题:

An administrator has a two node cluster, Node1 and Node2, running resource group rg1. The resource groupis active on Node1. The administrator stopped cluster services and unmanaged the resource group on Node1to work on a problem. Now the administrator needs to move rg1 to Node2. Which of the following will achievethis?()

  • A、Perform a clstart on Node1 with ’Manage Resource Groups’ set to ’Manually’ and select the destination ofNode2
  • B、Perform a resource group move operation from Node1 to Node2 and select the option to ’Re-manageResource Groups’ set to ’Automatically’
  • C、Perform a clstop on Node1 with option to move resource groups, this will release the resource group fromNode1 and accquire the resource group on Node2.
  • D、Perform a clstart on Node1 with ’Manage Resource Groups’ set to ’Automatically’, then perform a resourcegroup move operation to move rg1 from Node1 to Node2

正确答案:D

第5题:

An administrator has made several topology and resource group changes on one node in a running cluster.During verification and synchronization, using the "Emulate" option, many errors are reported. Theadministrator decided the best course of action was to roll back the changes. Prior to the changes beingmade, a cluster snapshot was taken. Which of the following actions will roll back the changes with the least disruption?()

  • A、Perform a synchronization from a node without the changes.
  • B、Apply the cluster snapshot on both nodes while the cluster is running.
  • C、"Restore HACMP Configuration Database from Active Configuration" on the node where the changes weremade
  • D、Stop the cluster using the option "Unmanage Resource Groups" and apply the cluster snapshot on thenode where the changes were made

正确答案:C

第6题:

An administrator is planning to bring a newly purchased server online. Which of the following should the administrator do FIRST?()

  • A、Follow the pre-installation plan and procedures.
  • B、Review the system logs to check for errors.
  • C、Notify all users that the old system will be taken offline.
  • D、Apply all security updates to the system.

正确答案:A

第7题:

An administrator has a 2 node cluster running PowerHA version 5.5. They remove a resource group from theactive cluster configuration. When performing a verify and synchronize of the cluster, the administrator getsthe following error: "migcheck[471]: cl_connect() error, nodename=Node1, rc=-1 cldare: A communication error prevents obtaining the VRMF from remote nodes. A DARE event cannot be run until this is corrected. Please ensureclcomd is running." What is the most likely cause of this error?()

  • A、There is a DARE lock in place
  • B、A PowerHA migration is in progress
  • C、Cluster services is not active on the other node
  • D、The other cluster node is running a different version of RSCT

正确答案:C

第8题:

During a cluster functionality test, and administrator performs a graceful stop for Node ’B’ in a three-node cluster. What is the expected state of the cluster after Node ’B’successfully completes?()  

  • A、 All cluster resources halt on Node ’B’,and one or both surviving nodes will gracefully acquire the resources.
  • B、 All cluster processes halt on Node ’B’,the cluster resources remain active,and the remaining  nodes take no action.
  • C、 All cluster processes stay active on Node ’B’,cluster resources are halted,and the remaining nodes take no action.
  • D、 All cluster resources will stop,cluster processes halt on Node ’B’,and the remaining cluster nodes take no action.

正确答案:D

第9题:

An administrator is planning for a six node cluster but is concerned about the administration needed tomanage user accounts throughout the cluster. What PowerHA feature could the administrator use to reducethe administration overhead?()

  • A、LDAP Authentication Module
  • B、Smart Assist for Active Directory
  • C、C-SPOC for user and password management
  • D、File Collections designating one node as the primary authentication node

正确答案:C

第10题:

An administrator has a two-node PowerHA cluster in a mutual takeover configuration. He needs to updatefrom 5.5 service pack 1 to 5.5 service pack 2. Which of the following actions will perform the updates with norisk of disruption to applications running in the cluster?()

  • A、Unmanage resource groups on all nodes, update the cluster filesets, start cluster services on all nodes,ensure cluster services stabilize
  • B、Update the cluster filesets on all nodes. Run ’refresh -s clstrmgrES’ on one node, wait for the cluster tostabilize, repeat for all other nodes
  • C、Unmanage resource groups on one node, update the cluster filesets, start cluster services. Wait for thecluster to stabilize and repeat for all other nodes.
  • D、Bring resource groups (RGs) online on all nodes concurrently, bring RGs offline on one node, update thecluster filesets, bring RGs online, repeat for all other nodes

正确答案:C

更多相关问题