多选题A company wants to consolidate 20 existing dual processor Pentium III servers, all running a web server application on Windows Server 2003.  They are considering consolidating to a single x445 running VMWare ESX.  Which TWO of the following questions w

题目
多选题
A company wants to consolidate 20 existing dual processor Pentium III servers, all running a web server application on Windows Server 2003.  They are considering consolidating to a single x445 running VMWare ESX.  Which TWO of the following questions will provide enough information to determine the correct processor configuration?()
A

Do the web servers require SMP capability?

B

Is the web content static or dynamic information?

C

What is the average CPU utilization of the existing web servers?

D

Will the servers need a SCSI or Fibre Channel storage solution?

E

What are the expected growth rates for the web servers?

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

The systems administrator of a large manufacturer has POWER5 and POWER6 servers, each with LPARs running AIX 6.1.  They are running several workloads including SAP, DNS, Oracle, DB2 and WebSphere Application Server, and plan to consolidate onto one POWER7 server.   How can the system administrator determine how much benefit Active Memory Expansion (AME) could provide for the consolidated system?()

  • A、Run amepat now on all of the existing LPARs.
  • B、Run amepat after consolidation on all LPARs.
  • C、Run amepat now on all existing LPARs running on the POWER6 servers.
  • D、Run amepat now on all existing LPARs running database applications.

正确答案:A

第2题:

A customer is considering consolidating their file servers by moving them into a virtual environment using VMWare ESX Server running on an x445 system.  The ratio of consolidation is expected to be about 15:1.  Which TWO of the Total Cost of Ownership factors are the key benefits of this solution?()

  • A、VMWare is licensed per system so no extra charge for SMP support
  • B、Lowering administration cost while providing better remote management tools
  • C、The x445 provides high availability options designed to minimize system outages
  • D、The x445 provides no single point of failure
  • E、The x445 provides SAN Connectivity right out of the box without needing to purchase extra hardware

正确答案:B,C

第3题:

A company wants to replace an existing UNIX database server with a new application running on Microsoft SQL Server.  Sizing analysis shows that a system with at least eight Xeon MP processors and 24GB RAM will be required for the central database server. Which of the following will meet the requirements at the lowest cost?()

  • A、8-way x445 with Microsoft Windows Server 2003 Standard Edition
  • B、8-way x445 with Microsoft Windows Server 2003 Datacenter Edition
  • C、8-way x445 with Microsoft Windows Server 2003 Enterprise Edition
  • D、16-way x445 with VMWare ESX with SMP and Windows Server 2003 Standard Edition VMs

正确答案:C

第4题:

retail company plans to consolidate 180 existing dual processor Xeon servers, all running a web server application on Windows Server 2003. They are planning consolidating to a single x3950 X5 running vSphere.Which of the following should be discussed with this customer? ()

  • A、Is the web content static or dynamic information 
  • B、Consider two servers for redundancy and failover 
  • C、What is the average CPU utilization of the existing web servers 
  • D、Will the servers need a SCSI or Fibre Channel storage solution

正确答案:B

第5题:

You are an enterprise administrator for Cer-tech .com. The company runs Windows Server 2008 on all the servers on the network. One of the servers, Server01 has the Web Server (IIS) role installed on it. The Server01 hosts multiple websites. Which of the following options would you choose to configure the server to automatically release memory for a single web site without affecting the other Web sites?()

  • A、Modify the Physical Path Credentials on the virtual directory.
  • B、Modify the bindings for the Web site.
  • C、Modify the Recycling options from the Application Pool Defaults.
  • D、Create a new application pool and associate the Web site to the application pool.

正确答案:D

第6题:

A customer is running system management software on one of their Windows xSeries servers, and the software seems to slow down their database application over time.  The customer is running IBM Director in their environment.  Which IBM Director tool can they utilize to guarantee processor time for the different applications and optimize the server performance?()

  • A、Software Rejuvenation
  • B、Capacity Manager
  • C、Capacity Workload Manager
  • D、Aurema Application Workload Manager

正确答案:D

第7题:

A customer wants to hold all enterprise data on their DS4000 system.  Several servers were added after they purchased another company.  The servers that have to be run are:       (1)An Oracle database running on a HP-UX server   (2)Several virtual machines running on VMWare ESX server       (3)A Microsoft cluster running Exchange 2000 server   Which of these new servers can be integrated with the DS4000?()

  • A、DS4000 storage does not support HP-UX, so the HP-UX server cannot be integrated.All other new servers can be used.
  • B、An Exchange cluster needs local disks, so the DS4000 cannot be used for this.All other new servers can be used.
  • C、When equipped with proper HBA’s and subsystem device drivers, all new servers can operate with the DS4000 storage device.
  • D、VMWare ESX can use the DS4000 storage; however, the virtual machines running in it will not have access to this storage other than via a virtual disk.All other new servers can be used.

正确答案:C

第8题:

A company wants to consolidate 20 existing dual processor Pentium III servers, all running a web server application on Windows Server 2003.  They are considering consolidating to a single x445 running VMWare ESX.  Which TWO of the following questions will provide enough information to determine the correct processor configuration?()

  • A、Do the web servers require SMP capability?
  • B、Is the web content static or dynamic information?
  • C、What is the average CPU utilization of the existing web servers?
  • D、Will the servers need a SCSI or Fibre Channel storage solution?
  • E、What are the expected growth rates for the web servers?

正确答案:C,E

第9题:

A customer is considering replacement of twenty older 4U and 6U rack-based servers with one IBM x366 Server running VMWare ESX attached to one DS4300.  Which of the following represents a reduction in Total Cost of Ownership (TCO) for the customer?()

  • A、Reduction in operating system software licensing and application costs
  • B、Reduction in floor space and hardware cost saving
  • C、VMWare is licensed per system so no extra charge for SMP support
  • D、No single point of failure, reducing downtime

正确答案:B

第10题:

A customer wants to integrate an x445 running SuSE with their existing EMC storage infrastructure.  Which of the following tasks needs to be done to ensure that the solution will work properly?()

  • A、Ensure that the EMC storage is listed on the IBM Server Proven website
  • B、Ensure that the x445 is listed on the EMC Hardware Compatibility website
  • C、Ensure that the x445 and the EMC storage server are listed on Novell’s SuSE Supported Hardware website
  • D、Build a proof of concept system at the customer site to demonstrate functionality

正确答案:A