第1题:
Which of the following disaster recovery sites requires power and cabling to be run before it can be used?()
第2题:
A global customer’s IT strategy is based upon two DS8000 systems and an N series gateway. They want to protect their business by implementing a disaster recovery solution. The storage specialist has recommended cascaded mirroring. Which of the following is the business benefit of cascaded replication()
第3题:
A customer has an IBM System Storage DS8100 at their primary site and a DS6800 at their recovery site, 9.5 kilometers away. They want to replicate data for disaster recovery backup with the least impact on performance.Which of the following products best accomplishes this task?()
A. Global Copy
B. Metro Mirror
C. Global Mirror
D. Metro/Global Mirror
第4题:
A customer has a large amount of data stored on three database servers and is concerned that at present there is no disaster recovery plan in place. They have an existing tape backup solution that meets their backup window. In order to analyze potential disaster recovery plans, which of the following questions is the most important?()
第5题:
A customer has an IBM System Storage DS8700 at their primary site and an XIV system at their recovery site, which is 9.5 kilometers away. They want to replicate data for disaster recovery backup. Which factor is a primary consideration when proposing a solution for this customer()
第6题:
When doing the Solution Assurance for a p5 570 with several LPARs, it is discovered that the customer plans to back the system up using mksysb. The customer would like to do unattended automated system backups and incorporate them into their off-site data recovery system. Which mksysb solution should be implemented?()
第7题:
A customer has two data centers, 500 kilometers apart. The customer requests a proposal for new storage subsystems and a disaster recovery solution that provides consistent data in the event of a disaster at the local site. Which IBM System Storage DS8000 solution should the storage specialist propose to the client()
第8题:
A System z customer is planning to deploy the IBM System Storage DS6800 in each of threesmall data centers located around a large city. A backup data center with an IBM System StorageDS8100 will serve as the disaster recovery facility. Which advanced function can the customerimplement to meet disaster recovery requirements?()
第9题:
A customer has a mission-critical application with redundant fabrics. The customer plans to replace older EMC Symmetrix 8830 systems with an IBM System Storage DS8700 and an IBM SAN Volume Controller (SVC). Which statement best describes the way to minimize the impact of data migration on the production environment()
第10题:
A customer plans to deploy a disaster recovery site and requires a complete mirror of their production and test environments. They have an excellent relationship with the business partner who helped them with their initial deployment. Which of the following will help with a successful implementation?()