A VIO server requires a dedicated LHEA port.
There is a limit of 32 LPARs per virtual LAN.
Two VIO servers will be required. A single VIO server can only provide virtual storage or Virtual Ethernet.
Two VIO servers will be required. One to provide virtual networking and another to provide dedicated networking.
第1题:
When doing capacity planning for the Virtual I/O Server,what is the most important consideration?()
第2题:
Companycom has a p5 590 that has their production LPAR, their Tivoli Storage Manager (TSM) LPAR, and several other LPARs. What method would provide connectivity between the production LPAR, and the TSM LPAR, but be isolated from the other LPARs in the system without utilizing a Virtual IO Server or physical adapter resources?()
第3题:
A customer needs to create a number of LPARs on a new POWER6 server with some LPARs requiring a dedicated network and other LPARs utilizing Virtual Ethernet via a VIO server.Which limitation must be considered when planning the system configuration?()
A.A VIO server requires a dedicated LHEA port.
B.There is a limit of 32 LPARs per virtual LAN.
C.Two VIO servers will be required. A single VIO server can only provide virtual storage or virtual Ethernet.
D.Two VIO servers will be required. One to provide virtual networking and another to provide dedicated networking.
第4题:
A customer is planning to buy a two enclosure Power 770, and will implement 4 LPARs with the following requirements:Each LPAR must have a private, dedicated connection to the network.The adapter for this network connection must be hot-swappable.The customer wants to minimize the number of I/O slots used. Which of the following fulfills the customer requirements?()
第5题:
While using virtualization to share SAN adapters on a server, how does Node Port ID Virtualization (NPIV) differ from Virtual SCSI (vSCSI) related to the use of multipathing software?()
第6题:
A system is being designed with many LPARs which will be clients of dual VIO Servers. The VIO Servers must be redundant so that, in the event of scheduled maintenance, the clients do not need to be shut down. Which of these strategies could be used to ensure that the client LPARs continue to be able to use the network in the event of a VIO Server being shut down?()
第7题:
A customer has an entry level Power System that is currently partitioned and managed by a Hardware Management Console (HMC). For operational reasons, it must be disconnected from the HMC and configured as a new development system. How should the customer proceed to implement PowerVM Express and Integrated Virtualization Manager (IVM) on this Power System? ()
第8题:
A.Virtualize network and memory to LPARs.
B.Virtualize network and storage to LPARs.
C.Virtualize memory and processors to LPARs.
D.Virtualize storage and processors to LPARs.
第9题:
A customer is planning on having a single Virtual I/O Server (VIOS) configuration in a Power 750. They haveselected a 4-port 1Gb Integrated Virtual Ethernet (IVE). There will be no other network cards installed in the system. One IVE logical port will be used in the VIO Server and will be used as the physicalport in a Shared Ethernet Adapter (SEA). What is the maximum number of IVE logical ports available to use inother LPARs?()
第10题:
Companycom has five LPARs, but only one CD drive. How should the CD drive be shared among all the users without system administrator action?()