When doing capacity planning for the Virtual I/O Server,what

题目
单选题
When doing capacity planning for the Virtual I/O Server,what is the most important  consideration?()
A

The I/O workload needs of the client LPARs

B

The processing requirements of the client LPARs

C

The memory requirements of the client LPARs

D

The virtual Ethernet requirements between client LPARs

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

When doing capacity planning for the Virtual I/O Server,what is the most important  consideration?()

  • A、The I/O workload needs of the client LPARs
  • B、The processing requirements of the client LPARs
  • C、The memory requirements of the client LPARs
  • D、The virtual Ethernet requirements between client LPARs

正确答案:A

第2题:

A technical specialist has a requirement to implement a 4-way POWER5 server with a small Web server partition and a high performance database server partition. The Web server provides a client front-end to the database server. The most important concerns are speed of communication between the Web server and the database and I/O speed of the database. Which of the following virtualization features would be most appropriate?()

  • A、Virtual SCSI
  • B、Virtual Ethernet
  • C、Virtual I/O Server
  • D、Micro-Partitioning

正确答案:B

第3题:

—What______you _______at ten o' clock yesterday﹖ —I_______ in class.

A、were doing studied

B、was doing was studying

C、were doing was studying

D、was doing studied


正确答案:C

第4题:

Which of the following functions can be performed using the Integrated Virtualization Manager?()

  • A、Concurrent firmware updates
  • B、Management of virtual storage
  • C、Hot add/remove of I/O drawers
  • D、Management of Capacity on Demand

正确答案:B

第5题:

A customer is planning on having a single Virtual I/O Server (VIOS) configuration in a Power 750. They haveselected a 4-port 1Gb Integrated Virtual Ethernet (IVE). There will be no other network cards installed in the system. One IVE logical port will be used in the VIO Server and will be used as the physicalport in a Shared Ethernet Adapter (SEA). What is the maximum number of IVE logical ports available to use inother LPARs?()

  • A、1
  • B、7
  • C、15
  • D、31

正确答案:D

第6题:

When planning an SVC environment with the customer, the storage specialist finds that they wishto include iSCSI storage into the cluster. In this situation what is needed to place the storage intoproduction?()

  • A、a RAID card
  • B、IQN of the host
  • C、amount of storage
  • D、number of I/O groups

正确答案:B

第7题:

What is the minimum number of virtual I/O server partitions needed to ensure high availability of the disks when utilizing the Virtual I/O server in a micro-partitioned solution?()

  • A、1
  • B、2
  • C、3
  • D、4

正确答案:B

第8题:

He asked me what ____________ when he came the next day.

A.I would do
B.I would be doing
C.would I do
D.would I be doing

答案:B
解析:
考查宾语从句的时态及语序。句意为“他问我当他第二天来的时候我会在做什么”。结合语境可知从句中表示的是就过去某时而言,将来某时正在进行的动作,故用过去将来进行时态,结构为would be+现在分词。宾语从句中一般为陈述语序。故选B。

第9题:

The database on a p5-570 Micro-Partition has grown and backups are not meeting the Service Level Agreement. There are several partitions using the Virtual I/O Server to access the storage array. The database backup has high CPU utilization while the others have low CPU utilization. What adjustment can the technical specialist make to ensure that the Service Level Agreement is achieved?()

  • A、Add memory to the database partition to improve response time.
  • B、Add additional Host Bus Adapters to the server to improve IO throughput.
  • C、Modify CPU allocations to favor the database partition.
  • D、Increase CPU allocations to the Virtual I/O Server.

正确答案:C

第10题:

Company.com is running a p5-550 system with inactive processors. The system is managed using the Integrated Virtualization Manager. How would the system administrator activate two additional processors?()

  • A、Use the Advanced Systems Management Interface to enter the Capacity on Demand Enablement code.
  • B、Use the Web-based System Manager Interface to enter the Capacity on Demand enablement code.
  • C、Use smitty or smit interface to enter the Capacity on Demand enablement code.
  • D、Use oem_setup_env on the Virtual I/O Server to enter the Capacity on Demand enablement code.

正确答案:A

更多相关问题