The I/O workload needs of the client LPARs
The processing requirements of the client LPARs
The memory requirements of the client LPARs
The virtual Ethernet requirements between client LPARs
第1题:
When doing capacity planning for the Virtual I/O Server,what is the most important consideration?()
第2题:
A technical specialist has a requirement to implement a 4-way POWER5 server with a small Web server partition and a high performance database server partition. The Web server provides a client front-end to the database server. The most important concerns are speed of communication between the Web server and the database and I/O speed of the database. Which of the following virtualization features would be most appropriate?()
第3题:
—What______you _______at ten o' clock yesterday﹖ —I_______ in class.
A、were doing studied
B、was doing was studying
C、were doing was studying
D、was doing studied
第4题:
Which of the following functions can be performed using the Integrated Virtualization Manager?()
第5题:
A customer is planning on having a single Virtual I/O Server (VIOS) configuration in a Power 750. They haveselected a 4-port 1Gb Integrated Virtual Ethernet (IVE). There will be no other network cards installed in the system. One IVE logical port will be used in the VIO Server and will be used as the physicalport in a Shared Ethernet Adapter (SEA). What is the maximum number of IVE logical ports available to use inother LPARs?()
第6题:
When planning an SVC environment with the customer, the storage specialist finds that they wishto include iSCSI storage into the cluster. In this situation what is needed to place the storage intoproduction?()
第7题:
What is the minimum number of virtual I/O server partitions needed to ensure high availability of the disks when utilizing the Virtual I/O server in a micro-partitioned solution?()
第8题:
第9题:
The database on a p5-570 Micro-Partition has grown and backups are not meeting the Service Level Agreement. There are several partitions using the Virtual I/O Server to access the storage array. The database backup has high CPU utilization while the others have low CPU utilization. What adjustment can the technical specialist make to ensure that the Service Level Agreement is achieved?()
第10题:
Company.com is running a p5-550 system with inactive processors. The system is managed using the Integrated Virtualization Manager. How would the system administrator activate two additional processors?()