单选题What is the correct procedure to update the UEFI on HX5 with MAX5 blades without using the AMM?()A Insert the ServerGuide CD/DVD, boot the HX5 blade and follow the prompts B Boot the blade from the HX5 Bootable Media Creator (BoMC) and follow the promp

题目
单选题
What is the correct procedure to update the UEFI on HX5 with MAX5 blades without using the AMM?()
A

Insert the ServerGuide CD/DVD, boot the HX5 blade and follow the prompts 

B

Boot the blade from the HX5 Bootable Media Creator (BoMC) and follow the prompts 

C

Press F1 when the HX5 system is booting, select Update UEFI, insert the CD/DVD and select OK

D

Mount the IMM virtual disk

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

A customer asks the sales professional how to update the UEFI on the HX5. They do not want to use AMM. Which is the procedure of the following?()

  • A、InstallServerGuide CD/DVD,boot the HX5 blade and follow the prompts
  • B、Boot the blade from the HX5 Bootable Media Creator (BoMC) and follow the prompts
  • C、Press F1 while the HX5 is booting,incert the CD/DVD and select "OK"
  • D、Mount the IMM virtual disk

正确答案:B

第2题:

A blade server has been configured to boot from SAN.  After an HBA firmware upgrade the blade was rebooted and cannot find the operating system.  Which of the following should the administrator do NEXT to troubleshoot the issue?()

  • A、Verify all HBA settings.
  • B、Upgrade the blade firmware.
  • C、Upgrade the OS level HBA drivers.
  • D、Set the system to boot from the local disk.

正确答案:A

第3题:

A manufacturing customer has an IBM BladeCenter H chassis with four, HX5 with MAX5 4-socket blades installed. Each blade has the optional Fibre Channel Expansion card. The customer wants redundancy and is going to install the following configuration:  (1)two Brocade 20-Port SAN Switch Modules  (2)two Nortel Networks 1/10 GB Uplink ESM  (3)a redundant AMM  What is the minimum number of power supplies needed for this configuration to have full redundancy?()

  • A、4
  • B、3
  • C、2
  • D、8

正确答案:A

第4题:

A customer has the following equipment installed in their data center:  (1)an IBM BladeCenter H chassis (2)two power supplies  (3)six HS22V blades (4)three Nortel 1/10 GB ESMs The retail customer purchased a new HX5 with MAX5.  Which of the following must be added to install the HX5 with MAX5?()

  • A、Two additional power supplies
  • B、Fibre Channel (FC) switches and SAN storage
  • C、A Nortel 1/10 GB ESM
  • D、SSD for the HX5

正确答案:A

第5题:

During system boot, the system hangs at LED 0C31. What is the first step the system administrator should take to correct the problem?()

  • A、Check system console connections
  • B、Check system network connections
  • C、Boot in service mode and change the bootlist
  • D、Boot from the AIX installation media and mount rootvg filesystems

正确答案:A

第6题:

Which of the following Blade servers offer hot swap internal hard drives?()

  • A、HS21
  • B、HS22
  • C、HS22V
  • D、HX5

正确答案:B

第7题:

What is the correct procedure to update the UEFI on HX5 with MAX5 blades without using the AMM?()

  • A、Insert the ServerGuide CD/DVD, boot the HX5 blade and follow the prompts 
  • B、Boot the blade from the HX5 Bootable Media Creator (BoMC) and follow the prompts 
  • C、Press F1 when the HX5 system is booting, select Update UEFI, insert the CD/DVD and select OK
  • D、Mount the IMM virtual disk

正确答案:B

第8题:

A banking customer plans to implement a BladeCenter H chassis. They plan for seven HS22 blades, six HX5 blades with MAX5, one 1U external Fibre Channel switch, and two 3U Fibre Channel storage devices with fourteen 146GB drives. Which is the minimum amount of rack space required to implement the solution of the following?()

  • A、32U
  • B、21U
  • C、25U
  • D、22U

正确答案:C

第9题:

A customer wants to boot from an iSCSI SAN with their IBM BladeCenter infrastructure running Microsoft Windows Server 2000.  What is required for the customer to be able to perform this?()

  • A、Fibre Channel Expansion Card for each Blade Server
  • B、cKVM Card for each Blade Server
  • C、iSCSI Expansion Card for each Blade Server
  • D、4Gb Modular Flash Drive

正确答案:C

第10题:

Which of the following is the correct procedure to update the BIOS on LS42 blades without using the AMM?()

  • A、Insert the Update eXpress Service Pack Installer (UXSPI) CD, boot the LS42 blade and follow the prompts 
  • B、Boot the blade to the Bootable Media Creator (BoMC) CD and follow the prompts 
  • C、Press F1 when the LS42 system is booting, select Update BIOS, insert the diskette into the diskette drive, and select OK 
  • D、Use the Remote Supervisor Adapter virtual disk

正确答案:B