A banking customer orders three IBM BladeCenter E chassis and thirty-four HS22 blades. Theustomer wants to fully populate the chassis with blades where possible. Which of the following is the minimum number of power cables required to provide redundancy? ()
A

12 

B

10 

C

8 

D

6

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

A banking customer plans to implement a BladeCenter H chassis. They plan for seven HS22 blades, six HX5 blades with MAX5, one 1U external Fibre Channel switch, and two 3U Fibre Channel storage devices with fourteen 146GB drives. Which is the minimum amount of rack space required to implement the solution of the following?()

  • A、32U
  • B、21U
  • C、25U
  • D、22U

正确答案:C

第2题:

A banking customer has a firewall between their AMM and the remote console which is used to configure the chassis and blades. Due to security concerns, port 80 (http) is being blocked, denying any http access to the AMM. Which of the following would facilitate remote communication with the AMM using a GUI interface?()

  • A、port 443 - SSL connection 
  • B、port 8080 ?http 
  • C、port 22 - SSH CLI 
  • D、port 427 - SLP connection

正确答案:A

第3题:

A manufacturing customer has an IBM BladeCenter H chassis with four, HX5 with MAX5 4-socket blades installed. Each blade has the optional Fibre Channel Expansion card. The customer wants redundancy and is going to install the following configuration:  (1)two Brocade 20-Port SAN Switch Modules  (2)two Nortel Networks 1/10 GB Uplink ESM  (3)a redundant AMM  What is the minimum number of power supplies needed for this configuration to have full redundancy?()

  • A、4
  • B、3
  • C、2
  • D、8

正确答案:A

第4题:

A customer needs to add three JS22 blade servers. The customer currently has three HS21 Blade servers and one LS41 4-socket Blade Server. Based upon this information,  what additional items does the customer need to purchase? ()

  • A、An IBM BladeCenter H chassis for the JS22 Blade servers
  • B、A concurrent KVM daughter card
  • C、A pair of IBM BladeCenter Power Supplies
  • D、A second Management Module

正确答案:C

第5题:

What is the maximum number of 220V power supplies that can be in a UCS chassis?()

  • A、two
  • B、four
  • C、twice the non-redundant configuration required to power the chassis
  • D、three times the non-redundant configuration required to power the chassis

正确答案:B

第6题:

A banking customer orders three IBM BladeCenter E chassis and thirty-four HS22 blades. The customer wants to fully populate the chassis with blades where possible. Which of the following is the minimum number of power cables required to provide redundancy?()

  • A、6
  • B、8
  • C、10
  • D、12

正确答案:C

第7题:

A banking customer orders three IBM BladeCenter E chassis and thirty-four HS22 blades. Theustomer wants to fully populate the chassis with blades where possible. Which of the following is the minimum number of power cables required to provide redundancy? ()

  • A、12 
  • B、10 
  • C、8 
  • D、6

正确答案:B

第8题:

A customer wants to implement the following Blades in BladeCenter H:Two POWER Blades running IBM i partitions.Two POWER Blades running AIX and LinuxFour x86 Blades running Windows. Which of the following design consideration statements is correct?()

  • A、The Blades must use the same CIOv and CFFh expansion adapter types.
  • B、Two physical BladeCenter H chassis will be required. One for the POWER Blades, the other for the x86  Blades.
  • C、The x86 Blades and POWER Blades may use different expansion adapters provided the POWER Blades  are in bays 1-7 and the x86 Blades are in slots 8-14.
  • D、The x86 Blades and POWER Blades may use different expansion adapters, provided the corresponding I/O modules to Blade midplane connections are configured in the Advanced Management Module (AMM).

正确答案:A

第9题:

A customer is interested in reducing energy consumption and infrastructure consolidation for space. The customer needs a maximum of 14 servers in 7U rack.  Which IBM BladeCenter Chassis should be recommended? ()

  • A、BladeCenter E
  • B、BladeCenter H
  • C、BladeCenter T
  • D、BladeCenter HT

正确答案:A

第10题:

A retail customer is looking at ways to reduce power requirements. They are considering deploying two hundred IBM HS22 blades running Red Hat Linux in the IBM BladeCenter E chassis. The customer has already chosen Intel L5640 CPUs to reduce power. Which on-board storage option allows the customer to reduce power consumption of each blade?()

  • A、One 50 GB SATA 1.8 inch SSD
  • B、Two 73GB 10K SAS HDD SFF
  • C、Two 31 GB SATA 2.5 inch SSD
  • D、Two 50GB SATA 1.8 inch SSD

正确答案:C