It is NOT possible to switch unless no active transaction exist in UNDO1.
It is possible to switch to UNDO2; but current active transactions will abort.
It is possible to switch to UNDO2; current active transactions will be automatically migrated to UNDO2.
It is possible to switch to UNDO2; only current active transactions will continue to execute inside UNDO1.
第1题:
A. reset of the primary supervisor
B. manual switchover from standby to active supervisor
C. manual switchover from active to standby supervisor
D. automatic switchover from active to standby on primary supervisor failure
第2题:
A new Catalyst switch is connected to an existing switch using a crossover cable. As a result of this, what would the switch port link lights display?()
第3题:
A. the difference between the current candidate configuration and the candidate configuration from one commit ago
B. the difference between the current active configuration and the current candidate configuration
C. the difference between the current active configuration and the active configuration from one commit ago
D. the difference between the current candidate configuration and the archived configuration from one commit ago
第4题:
You have just created a new VLAN on your network. What is one step that you should include in your VLAN-based implementation and verification plan? ()
第5题:
As a network administrator, you have configured a Catalyst 6500 Series Switch with redundant supervisor engine in a CIS network. What is the result of issuing the redundancy force-switchover command on that switch?()
第6题:
You have just created a new VLAN on your network for inter-VLAN routing. What is one step that you should include in your VLAN-based implementation and verification plan?()
第7题:
A VTP domain has six active VLANs. Without notice, all VLANs except VLAN1 fail. Just prior tothe failure, Switch2 was added to the network. Which three issues on Switch2 could be the cause?()
第8题:
As a network administrator, you have configured a Catalyst 6500 Series Switch with redundant supervisor engine in a CIS network. What is the result of issuing the redundancy force-switchover command on that switch?()
A. Automatic switchover from active to standby on primary supervisor failure
B. Reset of the primary supervisor.
C. Manual switchover from active to standby supervisor
D. Manual switchover from standby to active supervisor
第9题:
What does the command show | compare rollback 1 display?()
第10题:
What will happen if you issue the redundancy force-switchover command on a Catalyst 6500Series Switch with redundant supervisor modules?()