问答题Can you find the missing value on the roof of the following house? Each of the numbers on the windows and door must be used only once and no number can be reversed.

题目
问答题
Can you find the missing value on the roof of the following house? Each of the numbers on the windows and door must be used only once and no number can be reversed.
参考答案和解析
正确答案: 175
解析: 310=(17+14)×10,即:两个窗户的数字相加再乘以门上的数字,因此很容易算出屋顶上的数字为(12+23)×5=175。
如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

Betty’s suggestion that you () once more sounds reasonable.

A、try

B、tries

C、must try

D、can try


参考答案:A

第2题:

Which of the following constraint types can be used to ensure the value of an INTEGER column references only positive values?()

A.Unique

B.Check

C.Referential

D.Informational


参考答案:B

第3题:

●Which one of these statements about connecting to the Internet is true? (68) .

(68) A.The Internet can only be used to link computers with same operating system

B.The Internet can be used to connect computers with different ISP

C.You must have a telephone line to connect to the Internet

D.You must have a modem to connect to the Internet


正确答案:B
【解析】译文:下列关于连接到Internet的说法中,哪一个是正确的?
B选项的译文是:Internet能够连接使用不同ISP(Internet服务提供商)的计算机,因此B是正确的。

第4题:

Building a house costs quite a lot of money. Suppose you plan to build a house. Your first step will be to find a right piece of land. Your choice will depend on many different things. You will probably try to find a sunny place, with pleasant surroundings near shops and bus stops, not too far from your friends and the place where you work.
Next you will find a good builder, and together with the builder you will work out a plan. The builder will draw the plan. It will show the number of rooms, their position and size, and other parts, which must be noticed, such as windows, doors, and electric outlets. The builder will work out how much money is needed to build your house. He will work out the cost of the wood, bricks, the glass, and everything else that must be used in building the house. Later on, when he starts to build, this estimate must be corrected and revised. His estimate is based on existing prices, but prices of such things may change, and many other things may happen between the time when he makes the estimate and the time when he builds the house.
When the builder gives his estimate, you may wish to change your plan. (You may also wish to change your builder, if his estimate is too high! ) You may find that the house you wanted at first costs too much, or that you can spend a little more and add something to your plan. The builder's estimate depends on the plan, but the final plan depends on the builder's estimate.
The best title of this passage is ________

A.Building a House Costs Much Money
B.Estimate Is Important
C.Planning a House
D.Depend on the Builder

答案:C
解析:
本题考查对整篇短文中心思想的理解。A项讲的是“盖一幢房子要花很多钱”,这是本文的第一句话,但它只讲了上述三段的盖房子要花很多钱这一项内容,所以其概括不准确。B项是说“预算是重要的”.同样犯了以偏概全的毛病。D项讲的是“依靠建筑工”,这与短文内容是相矛盾的.故此三者皆否定之。

第5题:

根据下列内容,回答191-195题。
Building a house costs quite a lot of money. Suppose you plan to build a house. Your first stepwill be to find a right piece of land. Your choice will depend on many different things. You willprobably try to find a sunny place, with pleasant surroundings near shops and bus stops, not toofar from your friends and the place where you work.
Next you will find a good builder, and together with the builder you will work out a plan. Thebuilder will draw the plan. It will show the number of rooms, their position and size, and otherparts, which must be noticed, such as windows, doors, and electric outlets. The builder will workout how much money is needed to build your house. He will work out the cost of the wood, bricks,the glass, and everything else that must be used in building the house. Later on, when he starts tobuild, this estimate must be corrected and revised. His estimate is based on existing prices, butprices of such things may change, and many other things may happen between the time when hemakes the estimate and the time when he builds the house.
When the builder gives his estimate, you may wish to change your plan.(You may also wish tochange your builder, if his estimate is too high! ) You may find that the house you wanted at firstcosts too much, or that you can spend a little more and add something to your plan. The builder'sestimate depends on the plan, but the final plan depends on the builder's estimate.
The best title of this passage is

A.Building a House Costs Much Money
B.Estimate Is Important
C.Planning a House
D.Depend on the Builder

答案:C
解析:
本题考查对整篇短文中心思想的理解能力。A项讲的是“盖一幢房子要花很多钱”,这是本文的第一句话,但它只讲了上述三段的盖房子要花很多钱这一项内容,所以其概括不准确。B项是说“预算是重要的”.同样犯了以偏概全的毛病。D项讲的是“依靠建筑工”,这与短文内容是相矛盾的,故此三者皆否定之。

第6题:

Which of the following tools can be used prior to installing Windows Vista to find hardware compatibility issues?()

A. Upgrade Advisor

B. Window Aero

C. Task Manager

D. Device Manager


参考答案:A

第7题:

Building a house costs quite a lot of money. Suppose you plan to build a house. Your first step will be to find a right piece of land. Your choice will depend on many different things. You will probably try to find a sunny place, with pleasant surroundings near shops and bus stops, not too far from your friends and the place where you work.
Next you will find a good builder, and together with the builder you will work out a plan. The builder will draw the plan. It will show the number of rooms, their position and size, and other parts, which must be noticed, such as windows, doors, and electric outlets. The builder will work out how much money is needed to build your house. He will work out the cost of the wood, bricks, the glass, and everything else that must be used in building the house. Later on, when he starts to build, this estimate must be corrected and revised. His estimate is based on existing prices, but prices of such things may change, and many other things may happen between the time when he makes the estimate and the time when he builds the house.
When the builder gives his estimate, you may wish to change your plan. (You may also wish to change your builder, if his estimate is too high! ) You may find that the house you wanted at first costs too much, or that you can spend a little more and add something to your plan. The builder's estimate depends on the plan, but the final plan depends on the builder's estimate.
The phrase "draw a plan" in this passage means _______

A.making a picture of a building or a room
B.making a plan
C.working out a plan
D.pulling a picture out of a room

答案:A
解析:
解答该小题的重点是要准确理解“draw a plan”这个短语中的关键词plan。plan在本短文中反复出现了八次,第一次出现以动词形式出现,其他七次都是名词。作名词用时其常见用法有二:计划,方案;平面图,纸张。plan在与draw连用时,就表明:画一张建筑物的平面图。B项和C项都是把plan理解为“计划”或“方案”了,而D项则理解成“把一张图画从屋里找出来”,这是无稽之谈。由此答案非A莫属。

第8题:

Which one of these statements about connecting to the Internet is true?(68).

A.The Internet can only be used to link computers with same operating system

B.The Internet can be used to connect computers with different ISP

C.You must have a telephone line to connect to the Internet

D.You must have a modem to connect to the Internet


正确答案:B
解析:译文:下列关于连接到Internet的说法中,哪一个是正确的?B选项的译文是:Internet能够连接使用不同ISP(Internet服务提供商)的计算机,因此B是正确的。

第9题:

Building a house costs quite a lot of money. Suppose you plan to build a house. Your first step will be to find a right piece of land. Your choice will depend on many different things. You will probably try to find a sunny place, with pleasant surroundings near shops and bus stops, not too far from your friends and the place where you work.
Next you will find a good builder, and together with the builder you will work out a plan. The builder will draw the plan. It will show the number of rooms, their position and size, and other parts, which must be noticed, such as windows, doors, and electric outlets. The builder will work out how much money is needed to build your house. He will work out the cost of the wood, bricks, the glass, and everything else that must be used in building the house. Later on, when he starts to build, this estimate must be corrected and revised. His estimate is based on existing prices, but prices of such things may change, and many other things may happen between the time when he makes the estimate and the time when he builds the house.
When the builder gives his estimate, you may wish to change your plan. (You may also wish to change your builder, if his estimate is too high! ) You may find that the house you wanted at first costs too much, or that you can spend a little more and add something to your plan. The builder's estimate depends on the plan, but the final plan depends on the builder's estimate.
When the builder starts to build a house, his estimate will have to be corrected and revised because _______.

A.it is wrongly worked out by a workman
B.the future owner of the house thinks the estimate is so high that he cannot afford the building
C.the prices of building materials and the expenses of labor may be different from the original prices and expenses
D.estimates are usually mistaken in the beginning

答案:C
解析:
本题属细节考查题。考查的是在盖房的施工中,最初的预算必须更正与修改的原因。短文第二段的倒数一、二句就有相对应的部分;随后,当他开始施工时,此预算必须更改与修正。他的预算的根据是当时的价格,而建筑材料与其他东西的价格在制定预算和开始施工这一阶段很可能会有变化。A项说的是“预算经常被施工者算错”,在短文中找不到依据;B项的“未来的房主认为预算太高他支付不起”在短文中也没有体现,D项的“在开始时预算往往是错的”与A项的错误一致.

第10题:

Building a house costs quite a lot of money. Suppose you plan to build a house. Your first step will be to find a right piece of land. Your choice will depend on many different things. You will probably try to find a sunny place, with pleasant surroundings near shops and bus stops, not too far from your friends and the place where you work.
Next you will find a good builder, and together with the builder you will work out a plan. The builder will draw the plan. It will show the number of rooms, their position and size, and other parts, which must be noticed, such as windows, doors, and electric outlets. The builder will work out how much money is needed to build your house. He will work out the cost of the wood, bricks, the glass, and everything else that must be used in building the house. Later on, when he starts to build, this estimate must be corrected and revised. His estimate is based on existing prices, but prices of such things may change, and many other things may happen between the time when he makes the estimate and the time when he builds the house.
When the builder gives his estimate, you may wish to change your plan. (You may also wish to change your builder, if his estimate is too high! ) You may find that the house you wanted at first costs too much, or that you can spend a little more and add something to your plan. The builder's estimate depends on the plan, but the final plan depends on the builder's estimate.
What is the relationship between the estimate and the plan?

A.The plan depends on the estimate
B.The estimate depends on the plan
C.The plan has nothing to do with the estimate
D.The estimate and the plan depend on each other

答案:D
解析:
本题考查的仍是对短文个别段落和中心意思的理解。短文第三段集中讲的就是和建房方案之间的关系。A项只说出了建房方案对预算的依赖关系;B项只说出预算对建房方案的依赖关系,而忽略它们相互作用的一面,因此都是片面的。而c项说的是建房方案与预算毫不相干,这与短文交代的事实背道而驰.故予以排除。