Create and install the NIM server
Create and install the Virtual I/O Server
Create and install the application servers
Activate Advanced POWER Virtualization
第1题:
Companycom will be using Virtual IO Server to share Ethernet adapters. What can be done to prevent network failure of the client if a Virtual IO Server goes down?()
第2题:
You need to design a solution for deploying the custom wine production application. Your solution must make as few configuration changes as possible. Which three actions should you perform?()
第3题:
A customer has 4 application and 2 database servers that will be installed in partitions on a Power 750. They are concerned that the database software vendor will charge based on every processor core in the server. Which action will reduce the potential vendor software costs?()
第4题:
When creating a Virtual Ethernet adapter, which of the following steps is done FIRST?()
第5题:
Which of the following would be the FIRST step to configure a Virtual I/O Server(VIOS)?()
第6题:
A technical specialist has installed a Host Bus Adapter (HBA) on a p5-550 server. The system has four AIX 5L V5.3 partitions and a Virtual I/O server. The HBA will be used to connect all four partitions to a DS8000 storage array. What else must be performed to make the storage available to the partitions?()
第7题:
Company.com wants to build two Dynamic Logical Partitions (DLPAR) on a p5-520. They have a requirement for communication between the two DLPARs. Which feature of virtualization will satisfy this requirement?()
第8题:
You work as the IT professional in an international company which is named Wiikigo. You are experiencedin implementing and administering a network operating system. You are specialized in deploying servers,configuring Windows Server 2008 Terminal services and network application services, and configuring aweb services infrastructure. Your company has a server named VS1 that runs Windows Server 2008 andHyper-V. You want to create eight virtual servers that run Windows Server 2008 and configure the virtual servers asan Active Directory forest for testing purposes. You find that VS1 has only 30 GB of free hard disk space.You need to have the eight new virtual servers installed on VS1. 1.Perform the installation of Windows Server 2008. 2.Activate undo disks on all virtual servers. 3.Create a virtual server that has a 10-GB fixed-size virtual hard disk. 4.Create eight virtual servers that have a differencing virtual hard disk attached. 5.Create eight virtual servers that have a dynamically expanded virtual hared disk attatched. What action should you perform?()
第9题:
For NIM to install client machines located in a non-adjacent network, which routing must be defined?()
第10题:
Which of the following steps should be done FIRST when deploying a Virtual I/O server on a p5-550, which will host three logical partitions: a NIM server and two application servers?()