Use the Advanced Systems Management Interface to enter the Capacity on Demand Enablement code.
Use the Web-based System Manager Interface to enter the Capacity on Demand enablement code.
Use smitty or smit interface to enter the Capacity on Demand enablement code.
Use oem_setup_env on the Virtual I/O Server to enter the Capacity on Demand enablement code.
第1题:
Company.com has ordered an 8-way p5-570 and plans to deploy four AIX 5L v5.3 LPARs. The pre-installation system design has all eight processors being placed in the shared processor pool, and four Micro-Partitions being assigned resources from the pool. Prior to the implementation of the system, the customer informs the technical specialist that one of the applications is only supported on AIX 5L 5.2. Which of the following changes to the system design should the technical specialist make to accommodate this change?()
第2题:
Company.com is running a p5-550 system with inactive processors. The system is managed using the Integrated Virtualization Manager. How would the system administrator activate two additional processors?()
第3题:
A customer has two Power 770 systems with 4 enclosures each. Thirty two cores and 1TB of memory are activated on each system. Each system has 3 database partitions and each partition has 10 cores and 300GB of memory. Which solution will provide automated recovery of unplanned outages at least cost?()
第4题:
Which of the following interfaces is required to implement Workload Partition Mobility? ()
第5题:
A large shipping company that is standardized on Fibre Channel storage has just acquired a regional shipping company that is using an IBM XIV system. The large company would like to integrate the XIV system into the environment and manage all data through a single management interface. Which product should be suggested so that all data can be managed?()
第6题:
Which of the following can deploy system plans generated by the IBM System Planning Tool (SPT)?()
第7题:
A system administrator for a business recovery service center needs to test disaster recovery strategies for their clients running Linux. Each client has a different system configuration. Each time a client comes in, the system configuration of the managed system must change. What is the best way to handle this using LPAR?()
第8题:
A customer has an entry level Power System that is currently partitioned and managed by a Hardware Management Console (HMC). For operational reasons, it must be disconnected from the HMC and configured as a new development system. How should the customer proceed to implement PowerVM Express and Integrated Virtualization Manager (IVM) on this Power System? ()
第9题:
A customer needs a system supporting four partitions, each with the following requirements: ? 0.6 1.65GHz processors ? 2GB memory ? AIX 5.2 They also need the ability to grow the system in the future. Which pSeries system would be positioned best to meet this customer’s requirements?()
第10题:
A POWER6 595 LPAR has two dedicated processors. The LPAR is active and running AIX 6.1. What must be done to donate any unusedprocessing capacity to the shared processor pool?()