You plan to control the sessions performing a huge number of

题目
单选题
You plan to control the sessions performing a huge number of I/O operations. Your requirement is to kill the session when it exceeds a specified number of I/Os. Which statement describes a solution to the above?()
A

Set a threshold for the default system-defined moving window baseline.

B

Add directives to the Automatic Database Diagnostic Monitor (ADDM).

C

Modify the profile for the targeted users for which control needs to be imposed.

D

Implement the database resource manager to add the SWITCH_IO_REQS and SWITCH_GROUP directives.

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

You have 50 subscribers accessing a LAC to connectto ISP1.com.What is the L2TP Control Connections and Sessions for the subscribers?()

A.A single Control Connection and a single Session

B.A single Control Connection and multiple Sessions(one pers ubscriber)

C.Multiple Control Connections and a single Session

D.Multiple Control Connections and multiple Sessions(one per subscriber)


参考答案:B

第2题:

You‘re the systems administrator at Testing, and you create the following access control lists.You then enter the command "ip access-group 101 in" to apply access control list 101 to router TK1s e0 interface.Which of the following Telnet sessions will be blocked as a result of your access lists?()

A. Telnet sessions from host A to host 5.1.1.10

B. Telnet sessions from host A to host 5.1.3.10

C. Telnet sessions from host B to host 5.1.2.10

D. Telnet sessions from host B to host 5.1.3.8

E. Telnet sessions from host C to host 5.1.3.10

F. Telnet sessions from host F to host 5.1.1.10


参考答案:D, F

第3题:

You plan to control the sessions performing a huge number of I/O operations. Your requirement is to kill the session when it exceeds a specified number of I/Os. Which statement describes a solution to the above?()

A. Set a threshold for the default system-defined moving window baseline.

B. Add directives to the Automatic Database Diagnostic Monitor (ADDM).

C. Modify the profile for the targeted users for which control needs to be imposed.

D. Implement the database resource manager to add the SWITCH_IO_REQS and SWITCH_GROUP directives.


参考答案:D

第4题:

You are maintaining your database in Oracle10g. You are performing an incomplete recovery because the tablespace, DATA1, was dropped and purged from the Recycle Bin. After performing an incomplete recovery, you open the database with the RESETLOGS option.  What will NOT be the impact of using the RESETLOGS option?()

  • A、 The log sequence for the database will restart from 1.
  • B、 The log sequence number will be written to the control file.
  • C、 The log sequence number will be written to the datafile headers.
  • D、 The log sequence number will be written to the initialization parameter file.

正确答案:D

第5题:

You have 50 subscribers accessing a LAC to connectto ISP1.com.What is the L2TP Control Connections and Sessions for the subscribers?()

  • A、A single Control Connection and a single Session
  • B、A single Control Connection and multiple Sessions(one pers ubscriber)
  • C、Multiple Control Connections and a single Session
  • D、Multiple Control Connections and multiple Sessions(one per subscriber)

正确答案:B

第6题:

Perform. Quality Control is the process of monitoring and recording results of executing the Quality Plan activities to assess performance and recommend necessary changes. ______ are the techniques and tools in performing quality control.. ① Statistical sampling ② Run chart ③ Control charts ④ Critical Path Method ⑤ Pareto chart ⑥ Cause and effect diagrams

A.①②③④

B.②③④⑤

C.①②③⑤⑥

D.①③⑤⑥


正确答案:C

第7题:

Perform Quality Control is the process of monitoring and recording results*of executing the Quality Plan activities to assess performance and recommend necessary changes.() are the techniques and tools in performing quality control① Statistical sampling ② Run chart③ Control charts ④ Critical Path Method⑤ Pareto chart⑥ Cause and effect diagrams

A.①②③④
B.②③④⑤
C.①②③⑤⑥
D.①③④⑤⑥

答案:C
解析:
实现项目质量控制的方法、技术和工具包括统计抽样(Statistical sampling)、运行图 (Run chart)、控制图(Control charts)、帕累托图(Pareto chart),以及因果图(Cause and effect diagrams)等。关键路径法(Critical Path Method)是制定项目进度计划的方法,因此选C。

第8题:

● Perform Quality Control is the process of monitoring and recording results of executing the Quality Plan activities to assess performance and recommend necessary changes.(74) are the techniques and tools in performing quality control.

Statistical sampling ① Run chart ②

Control charts ③ Critical Path Method ④

Pareto chart ⑤ Cause and effect diagrams ⑥

(74)

A.①②③④

B.②③④⑤

C.①②③⑤⑥

D.①③④⑤⑥


正确答案:C
试题(74)分析
实现项目质量控制的方法、技术和工具包括统计抽样Statistical sampling,运行图Run chart、控制图Control charts、帕累托图Pareto chart,以及因果图Cause and effect diagrams等。
关键路径法Critical Path Method是制定项目进度计划的方法,因此选C
参考答案
(74)C

 

第9题:

When you are performing media recover, and an archived log is lost or corrupt, which type of recover must you perform?()

  • A、Until SCN
  • B、Until time
  • C、Until cancel
  • D、Recover using backup control file.

正确答案:C

第10题:

You recently activated a resource plan named OLTP_PLAN in your database. Several users are concurrently running long transactions. You decide to monitor the resource manager to determine if the resource allocation formulated in the OLTP_PLAN is sufficient for peak database hours. Which dynamic performance view should you use to display the CPU time consumed by all the sessions within the resource groups?()  

  • A、 V$SYSSTAT
  • B、 V$SESSSTAT
  • C、 V$RSRC_PLAN
  • D、 V$RSRC_CONSUMER_GROUP

正确答案:D

更多相关问题