多选题Which three elements can a job chain process involve?()Aan eventBa scheduleCa programDanother chainEa lightweight job

题目
多选题
Which three elements can a job chain process involve?()
A

an event

B

a schedule

C

a program

D

another chain

E

a lightweight job

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

Which three elements can a job chain process involve?()

A. an event

B. a schedule

C. a program

D. another chain

E. a lightweight job


参考答案:B, D, E

第2题:

Which two statements are true about a job chain? ()(Choose two.)

A. A job chain can contain a nested chain of jobs.

B. The jobs in a job chain cannot have more than one dependency.

C. A job of the CHAIN type can be run using event-based or time-based schedules.

D. The jobs in a job chain can be executed only by using the events generated by the Scheduler


参考答案:A, C

第3题:

There are a variety of elements that contribute to the qualities of a good language teacher. These elements can be categorized into three groups: ____________.

A.loving students

B.loving his or her job and have good command English

C.ethic devotion

D.rofessional qualities and personal styles


参考答案:B

第4题:

An operator notices that a job on the system is causing poor performance. The job is a root process and the administrator has concluded it is not important and can be stopped. Shortly after stopping the process, it starts again. Which of the following commands will list repeating scheduled tasks?()

  • A、at -l
  • B、jobs -l
  • C、sched -l
  • D、crontab -l

正确答案:D

第5题:

An operator notices that a job on the system is causing poor performance. The job is a root process and the administrator has concluded it is not important and can be stopped. Shortly after stopping the process, it starts again. Which of the following commands will list repeating scheduled tasks?()

A. at -l

B. jobs -l

C. sched -l

D. crontab -l


参考答案:D

第6题:

Which of the following Scheduler elements encourage object reuse?()

A. Schedule objects

B. Program arguments

C. Job classes

D. Job arguments

E. All of the above


参考答案:A, B, D

第7题:

Which three statements are true about windows? ()(Choose three.)

A. Only one window can be open at any given time

B. Consumer groups are associated with windows

C. Windows work with job classes to control resource allocation

D. The database service name must be provided during windows creation

E. Windows can automatically start job or change resource allocation among jobs for various time periods.


参考答案:A, C, E

第8题:

Which three statements are true about windows?()

A. Only one window can be open at any given time

B. Consumer groups are associated with windows

C. Windows work with job classes to control resource allocation

D. The database service name must be provided during windows creation

E. Windows can automatically start job or change resource allocation among jobs for various time periods.


参考答案:A, C, E

第9题:

Which of the following are valid program types for a lightweight job?()

  • A、 PLSQL_BLOCK
  • B、 EXECUTABLE
  • C、 JAVA_STORED_PROCEDURE
  • D、 STORED_PROCEDURE
  • E、 EXTERNAL

正确答案:A,D

第10题:

Using Job Scheduling Console, how can the external successor chain  be viewed when a job needs to be canceled?()

  • A、 using the Hyperbolic Viewer
  • B、 opening the Impact view and displaying the successors
  • C、 opening the Job Stream Instance editor for its Job Stream Instance
  • D、 opening the Dependencies window and drilling down to the successors

正确答案:B

更多相关问题