10
45
50
100
第1题:
In the process of communication requirement analysis, the project manager should consider the number of potential communication channels or paths as an indicator of the complexity of a project‘s communication. According to Metcalfe‘s Law, a project with 10 stakeholders has()potential communication channels.
A.10
B.45
C.50
D.100
第2题:
System analysis is traditionally done top-down using structured analysis based on( ). Object-oriented analysis focuses on creation of models. The three types of theanalysis model are( ). There are two substages of object-oriented analysis.( )focuses on real-world things whose semantics the application captures. The object constructedin the requirement analysis shows the( )of the real-world system and organizes it intoworkable pieces.( )addresses the computer aspects of the application that are visible tousers. The objects are those which can be expected to vary from time to time quite rapidly.
A.functional decomposition B.object abstraction C.data inheritance D.information generalization A.function model,class model and state model B.class model,interaction model and state model C.class model,interaction model and sequence model D.function model,interaction model and state model A.Static analysis B.Semantic analysis C.Scope analysis D.Domain analysis A.static structure B.system components C.data flows D.program procedures A.Program analysis B.Function requirement C.Application analysis D.Physical model
第3题:
"Paraphrasing" is most closely associated with which part of the communication process?
A encoding
B decoding
C barriers
D feedback
E None of the above.
第4题:
● Plan Quality is the process of identifying quality requirements and standards for the project and product, and documenting how the project will demonstrate compliance.(75) is a method that analyze all the costs incurred over the life of the product by investment in preventing nonconformance to requirements, appraising the product or service for conformance to requirement, and failing to meet requirements.
(75)
A.Cost-Benefit analysis
B.Control charts
C.Quality function deployment
D.Cost of quality analysis
第5题:
The( )process ascertains which risks have the potential of affecting the project and documenting the risks’characteristics. A.Risk Identification B.Quantitative Risk Analysis C.Qualitative Risk Analysis D.Risk Monitoring and Control
第6题:
●Models drawn by the system analysts during the process of the structured analysis are(72).
(72) A.PERTs
B.EMV
C.UMLs
D. DFDs
第7题:
● In the process of communication requirement analysis, the project manager should consider the number of potential communication channels or paths as an indicator of the complexity of a project' s communications. According to Metcalfe's Law, a project with 10 stakeholders has ( 73 ) potential communication channels.
(73) A. 10
B. 45
C. 50
D. 100
第8题:
Things that distort, distract, or muddle the communication process are called:
A noise
B selective filtering
C selective perception
D medium problems
E All of the above.
第9题:
()is the process of formalizing acceptance of the completed project deliverables. The key benefit of this process is that it brings objectivity to the acceptance process and increases the probability of final product, service,or result acceptance by validating each deliverable。
A、Validate scope
B、Define scope
C、Control scope
D、Collect requirement
第10题:
The development process in the software (74) involves four phases: analysis,design, implementation, and testing.
A.maintenance
B.lifecycle
C.programming
D.upgrading