When building a NIC team (virtual port channel) between a ho

题目
单选题
When building a NIC team (virtual port channel) between a host and a pair of Cisco Nexus 5000 Series Switches that will carry FCoE traffic, what is the maximum number of physical links that can exist in the team?()
A

 1

B

 2

C

 4

D

 5

E

 16

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

Which two features prevent routing loops between the OSPF sites of a customer when the sites aremultihomed or a backdoor link is used between the sites? ()

  • A、sham link
  • B、down bit
  • C、virtual link
  • D、Site of Origin
  • E、domain tag

正确答案:B,E

第2题:

When building a NIC team (virtual port channel) between a host and a pair of Cisco Nexus 5000 Series Switches that will carry FCoE traffic, what is the maximum number of physical links that can exist in the team?()

  • A、 1
  • B、 2
  • C、 4
  • D、 5
  • E、 16

正确答案:B

第3题:

SUCCESSFUL TEAM WORK AND TEAM BUILDING Team building skills are critical for your effectiveness as a manager or entrepreneur. And even if you are not in a management or leadership role yet, better understanding of team work can make you a more effective employee and give you an extra edge in your corporate office. Team building success is when your team can accomplish something much bigger and work more effectively than a group of the same individuals working on their own. There are two critical factors in building a high performance team. The first factor in team effectiveness is the diversity of skills and personalities. It means people use their strengths in full, but can compensate for each other's weaknesses. Or, different personality types balance and complement each other. The other critical element of team work success is that all the team efforts are directed towards the same clear goals, the team goals. This relies heavily on good communication in the team and harmony in member relationships. In real life, team work success rarely happens by itself if there are no focused team building efforts or activities. There is simply too much room for problems. For example, different personalities may build up conflicts. Or even worse, some people with similar personalities may start fighting for authority and dominance in certain areas of expertise. Even if the team goals are clear and accepted by everyone, there may be no team commitment to the group goals, or no consensus on the means of achieving those goals. There may be a lack of trust and openness which may block the critical communication and lead to loss of coordination in the individual efforts. This is why every team needs a good leader who is able to deal with all team work issues.

1. Team building skills are not so critical if you are only an employee.()

2. To form. a high performance team, you need many important factors.()

3. A good team should have a diversity of personalities.()

4. Team work success is quite common in practice.()

5. To solve all the problems, you need a capable leader.()


参考答案: 1:F; 2:F; 3:T; 4:F; 5:T

第4题:

When doing capacity planning for the Virtual I/O Server,what is the most important  consideration?()

  • A、The I/O workload needs of the client LPARs
  • B、The processing requirements of the client LPARs
  • C、The memory requirements of the client LPARs
  • D、The virtual Ethernet requirements between client LPARs

正确答案:A

第5题:

What interface is created when an FC Port Channel is created on a Cisco Unified Computing System?()

  • A、 An interface ’san-port-channel’ in NXOS
  • B、 An interface ’port-channel’ in NXOS
  • C、 An interface ’port-channel’ with ’mode fc’ configured
  • D、 An interface ’fc-port-channel’ in NXOS

正确答案:A

第6题:

A virtual port channel (vPC) allows links that are physically connected to two different Cisco Nexus devices to appear as a single port channel to a third device. Which are the mandatory steps for configuring vPC? ()   

  • A、 Enable feature vPC
  • B、 Define domains
  • C、 Establish peer keepalive connectivity
  • D、 Create a peer link
  • E、 Configure the peer link as a trunk port
  • F、 Create port channels and vPCs
  • G、 Define port channel load-balancing method
  • H、 Make sure configurations are consistent

正确答案:A,C,D,F,H

第7题:

When configuring Cisco IOS login enhancements for virtual connections, what is the "quiet period"?()

  • A、The period of time in which virtual login attempts are blocked, following repeated failed login attempts
  • B、The period of time in which virtual logins are blocked as security services fully initialize
  • C、A period of time when no one is attempting tolog in
  • D、The period of time between successive login attempts

正确答案:A

第8题:

WhatinterfaceiscreatedwhenanFCPortChanneliscreatedonaCiscoUnifiedComputingSystem?()

A.Aninterface’san-port-channel’inNXOS

B.Aninterface’port-channel’inNXOS

C.Aninterface’port-channel’with’modefc’configured

D.Aninterface’fc-port-channel’inNXOS


参考答案:A

第9题:

Virtual PortChannels (vPCs) allow links that are physically connected to two different Cisco switches to appear to a third downstream device as coming from a single device and as part of a single port channel. Which of the following are components of a Virtual PortChannel system? ()

  • A、 Two peer devices: the vPC peers of which one is primary and one is secondary and are part of a vPC domain.
  • B、 A Layer 3 Gigabit Ethernet link called peer-keepalive link to resolve dual-active scenarios
  • C、 A redundant 10 Gigabit Ethernet PortChannel called a peer link to carry traffic from one system to the other when needed
  • D、 vPC member ports forming the PortChannel
  • E、 A dot1q trunk between the vPC peers
  • F、 A management port that can be used as peer-keepalive link to resolve dual-active scenarios.

正确答案:A,B,C,D

第10题:

What does the number one 1 represent for interface fe-0/0/1?()

  • A、port number
  • B、PCI slot number
  • C、channel number
  • D、virtual PIC number

正确答案:A

更多相关问题