the chief engineer
the designated engineer from shipyard
the designated duty officer in charge of the engineering watch
the designated surveyor from classification society
第1题:
The officer in charge of the engineering watch shall notify the chief engineer without delay ____.
A.in any emergency or if in any doubt as to what decision or measures to take
B.in the event of any impending action in machinery spaces that may cause reduction in ship's speed
C.when isolating and bypassing machinery to be worked on
D.co-operating with any engineer in charge of maintenance work
第2题:
strength
dense
percentage
velocity
第3题:
对话理解
听力原文:W: When I want to borrow money from a hank, what should I do?
M: You should create a contract with the bank, stipulating the rate of interest, the repayment date, the amount and timing of any periodic cash interest payments, and other terms of the agreement.
Q: Which is not mentioned when creating a contract with the bank?
(11)
A.Stipulating the rate of interest.
B.Stipulating the repayment date.
C.Stipulating the amount and timing of any periodic cash interest payments.
D.Stipulating the financial sponsor.
第4题:
bilge tank
sludge tank
overflow tank
oil collecting tank
第5题:
in any emergency or if in any doubt as to what decision or measures to take
in the event of any impending action in machinery spaces that may cause reduction in ship’s speed
when isolating and bypassing machinery to be worked on
co-operating with any engineer in charge of maintenance work
第6题:
When under maneuvering conditions with the machinery being manually operated the control unit or console should be
A.automatically controlled
B.continuously manned
C.off power
D.continuously unmanned
第7题:
automatically controlled
continuously manned
off power
none of the above is true
第8题:
A.automatically controlled
B.off power
C.continuously manned
D.continuously unmanned
第9题:
a checklist for use when carrying out the inspections
list of crew members
maintenance and repair instructions
schedule of periodic maintenance
第10题:
at any location
on the drill floor and liquid mud handling areas
in bulk storage tanks
in machinery spaces