A “liner” in riveted construction of a vessel is a(n) ().

题目
单选题
A “liner” in riveted construction of a vessel is a(n) ().
A

small plate which fills the aperture between riveted strakes and the vessel framing

B

backing plate which is used to level the strakes while riveting,and then removed

C

internal frame to which the side shell is riveted

D

seam that is welded after riveting is completed

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

A vessel has been damaged by fire. The survey shows the cost of repairs will exceed the value of the repaired vessel. This is an example of a(n) ______.

A.constructive total loss

B.salvage loss

C.actual loss

D.preferred loss


正确答案:A

第2题:

A vessel cannot comply with all of the SOLAS requirements due to its construction. Where will this be indicated?

A.Nowhere; the vessel must comply to engage in international trade

B.On the reverse of the SOLAS certificate

C.On the Exemption Certificate

D.On the Certificate of Inspection


正确答案:C

第3题:

A vessel used for international service shall possess ______ valid for duration of charter party showing winches and derricks in order.

A.International Cargo Gear Certificate

B.International Loadline Certificate

C.International Safety Construction Certificate

D.International Seaman Identification


正确答案:A

第4题:

In vessel construction,the garboard strake is ______.

A.Located next to and parallel to the keel

B.Located next to and parallel to the gunwale

C.Another term for the bilge keel

D.Another term for the rub rail


正确答案:A

第5题:

In vessel construction,a greater number of watertight bulkheads results in ______.

A.increased capacity to set flooding boundaries

B.decreased capacity to set flooding boundaries

C.reduced compartmentation

D.greater deck load capacity


正确答案:C

第6题:

The use of liners in riveted construction is eliminated by using ______.

A.lapped construction

B.strapped construction

C.joggled construction

D.belted construction


正确答案:C

第7题:

What material is allowed in construction of the hull of a vessel with an integral diesel fuel tank ________.

A.Steel or aluminum

B.Sandwich style fibreglass with a natural rubber core

C.Copper-nickel or copper silicon alloys

D.Any or all of the above


正确答案:A

第8题:

When a pilot is on board to pilot the vessel the Letter ______ must be hoisted.

A.G

B.H

C.B

D.N


正确答案:B

第9题:

In vessel construction,beams are transverse girders which provide support to ______.

A.Bulkheads

B.Deckhouse structures

C.Decks

D.Vertical frames


正确答案:C

第10题:

In vessel construction, beam brackets are triangular plates that join the deck beam to a ____.

A.bulkhead

B.frame

C.stanchion

D.deck longitudinal


正确答案:B
在船舶结构中,梁肘板是连接甲板梁与肋骨的三角形板材。

更多相关问题