第1题:

43 Which of the following networking methods allows us to show that the last 10% of one element cannot be completed until 62% of a previous element has been completed?

A. PERT

B. ADM

C. PDM

D. All of the above.

E. A and C only.


正确答案:C

第2题:

The loss has not yet been accurately, but it is believed to be well beyond a hundred million dollars.

A. calculated B. considered C. completed D. controlled


正确答案:A

第3题:

Which of the following networking methods allows us to show that the last % of one element cannot be completed until % of a previous element has been completed?

A.PERT

B.ADM

C.PDM

D.All of the above.

E.A and C only.


正确答案:C
C

第4题:

The Master of a vessel may tender a Notice of Readiness to the charterer when the vessel ______.

A.has completed the terms of the charter party

B.is in all respects ready to load

C.is in all respects ready to sail

D.is safely moored or at a suitable anchorage


正确答案:B

第5题:

If it________fine tomorrow,we shall start loading.

A.to be

B.is

C.will be

D.has been


正确答案:B

第6题:

It has been over a century _______ the railway was completed.

(A)when

(B) once

(C) which

(D) since


正确答案:D
解答参考:D此题考察句型It has been…since that… 自从……以来有多久了【译文】从铁路建成以来有一个多世纪之久了。

第7题:

After a fire has been extinguished in a closed space, personnel may safely enter the space when

A.smoke density has been decreased sufficiently to see the bulkhead opposite the compartment's entrance

B.a lifeline and explosion proof flash light are used

C.all smoke and toxic fumes are removed and an adequate oxygen supply is present

D.overhaul has been completed to remove any possible source of re-ignition


正确答案:C

第8题:

161 Which of the following networking methods allows us to show that the last 10% of one element cannot be completed until 62% of a previous element has been completed?

A. PERT

B. ADM

C. PDM

D. All of the above.

E. A and C only


正确答案:C

第9题:

The mere fact that free pratique has not been obtained ________ mean that the ship is not ready to load, if, in fact, free pratique can be obtained at any time and without the possibility of delaying the loading.

A.does not

B.is not

C.are not

D.has not


正确答案:A

第10题:

The Charterer is entitled to the benefit of the excepted perils during the transit of the goods from storing place to the actual place of loading,provided such transit substantially ______ part of the operation of loading.

A.has the form of a

B.forms

C.is in the form of a

D.is to form a


正确答案:B

更多相关问题