end
web
pin
journal
第1题:
The transfer procedures required to be followed on tankers shall contain ______.
A.A list of each port of discharge
B.A line diagram of the vessel's transfer piping
C.A current crew list
D.The duties by name of each person in charge required for each transfer operation
第2题:
line shaft bearings
connecting rod beatings
main bearings
support bearings
第3题:
Vee-type engines have the connecting rods from two cylinders connected to each _____ of the crankshaft.
A.throw
B.web
C.main bearing
D.deflection
第4题:
banjo feed
splash feed
gravity feed
pressure feed
第5题:
tension load twice each crankshaft revolution
compression load during power and compression strokes
inertia load once every four crankshaft revolutions
bending loads at bottom and top dead center
第6题:
through bolts
jack bolts
tap bolts
fitted bolts
第7题:
Misalignment
Length
Strength
Stresses
第8题:
Masters are required to notify Port Authorities of anchorage bearings after ______.
A.departure
B.leaving
C.anchored
D.anchoring
第9题:
throw
web
main bearing
deflection
第10题:
axial loads
firing loads
inertia loads
centripetal loads