自然堤(natural dam)

题目
名词解释题
自然堤(natural dam)
如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

关于事故分类中的DAM,哪项说法是不正确的?()

A.它的完整写法是Damageinc ident

B.它指的是财产损失事件

C.DAM事件中肯定也伴随其他伤害事故的发生

D.DAM事件属于负面HSSE指标


参考答案:C

第2题:

There was no use ____ a dam where there was no water.

A: to build

B: build

C: to building

D: building


参考答案:D

第3题:

图像显示模式中Natural及RICH模式分别为()

A.自然、艳丽

B.艳丽、自然

C.柔和、自然


参考答案:A

第4题:

土石坝(earth-rock dam)


正确答案: 用土、砂、砂砾石、卵石、块石、风化岩等当地材料填筑而成的坝。

第5题:

自然堤


正确答案: 沿河床两侧常产生堤状地形,称为自然堤。

第6题:

(e) Internal controls are very important in a complex civil engineering project such as the Giant Dam Project.

Required:

Describe the difficulties of maintaining sound internal controls in the Giant Dam Project created by working

through sub-contractors. (4 marks)


正确答案:
(e) Control and sub-contractors
Specifically in regard to the maintenance of internal controls when working with sub-contractors, the prominent difficulties
are likely to be in the following areas:
Configuring and co-ordinating the many activities of sub-contractors so as to keep progress on track. This may involve taking
the different cultures of sub-contractor organisations into account.
Loss of direct control over activities as tasks are performed by people outside R&M’s direct employment and hence its
management structure.
Monitoring the quality of work produced by the sub-contractors. Monitoring costs will be incurred and any quality problems
will be potentially costly.
Budget ‘creep’ and cost control. Keeping control of budgets can be a problem in any large civil engineering project (such the
construction of the new Wembley Stadium in the UK) and problems are likely to be made worse when the principal contractor
does not have direct control over all activities.
Time limit over-runs. Many projects (again, such as the new Wembley Stadium, but others also) over-run significantly on time.
Tutorial note: only four difficulties need to be described.

第7题:

Normal pool elevation is the height in feet of the section of river above a dam. This height is measured from ______.

A.low steel on the Huey P. Long Bridge

B.mean sea level

C.the local water table

D.the minimum dam control level


正确答案:B

第8题:

导流堤堤顶的标高应高出设计水位加0.25米,堤顶坡度与水流自然坡度相适应。()

此题为判断题(对,错)。


参考答案:错

第9题:

重力坝(gravity dam)


正确答案: 主要依靠自身重量抵抗水的作用力等荷载以维持稳定的坝。

第10题:

拱坝(arch dam)


正确答案: 在平面上拱向上游将荷载主要传递给两岸的曲线型坝。